2015-04171. Delegation of Authority to the States of Iowa; Kansas; Missouri; Nebraska; Lincoln-Lancaster County, NE; and City of Omaha, NE., for New Source Performance Standards (NSPS), National Emission Standards for Hazardous Air Pollutants (...  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Delegation of authority.

    SUMMARY:

    The States of Iowa, Kansas, Missouri, and Nebraska and the local agencies of Lincoln-Lancaster County, Nebraska, and the city of Omaha, Nebraska, have submitted updated regulations for delegation of EPA authority for implementation and enforcement of NSPS, NESHAP, and MACT standards. The submissions cover new EPA standards and, in some instances, revisions to standards previously delegated. EPA's review of the pertinent regulations shows that they contain adequate and effective procedures for the implementation and enforcement of these Federal standards. This action informs the public of delegations to the above-mentioned agencies.

    DATES:

    This document is effective on February 27, 2015. The dates of delegation can be found in the SUPPLEMENTARY INFORMATION section of this document.

    ADDRESSES:

    Copies of documents relative to this action are available for public inspection during normal business hours at the Environmental Start Printed Page 10597Protection Agency, Air Planning and Development Branch, 11201 Renner Road, Lenexa, Kansas 66219. The interested persons wanting to examine these documents should make an appointment with the office at least 24 hours in advance.

    Effective immediately, all notifications, applications, reports, and other correspondence required pursuant to the newly delegated standards and revisions identified in this document must be submitted with respect to sources located in the jurisdictions identified in this document, to the following addresses:

    Iowa Department of Natural Resources, Air Quality Bureau, 7900 Hickman Road, Suite 1, Windsor Heights, Iowa 50324.

    Kansas Department of Health and the Environment, Bureau of Air, 1000 SW Jackson Street, Suite 310, Topeka, Kansas 66612-1367.

    Missouri Department of Natural Resources, Air Pollution Control Program, PO Box 176, Jefferson City, Missouri 65102-0176.

    Nebraska Department of Environmental Quality, Air Quality Division, 1200 “N” Street, Suite 400, P.O. Box 98922, Lincoln, Nebraska 68509.

    Lincoln-Lancaster County Health Department, Division of Environmental Public Health, Air Quality Section, 3140 “N” Street, Lincoln, Nebraska 68510.

    City of Omaha, Public Works Department, Air Quality Control Division, 5600 South 10th Street, Omaha, Nebraska 68107.

    Duplicates of required documents must also continue to be submitted to the EPA Regional Office at the above address.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Paula Higbee at (913) 551-7028, or by email at higbee.paula@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The supplementary information is organized in the following order:

    I. What does this action do?

    II. What is the authority for delegation?

    III. What does delegation accomplish?

    IV. What has been delegated?

    V. What has not been delegated?

    List of Delegation Tables

    Table I—NSPS, 40 CFR part 60

    Table II—NESHAP, 40 CFR part 61

    Table III—NESHAP, 40 CFR part 63

    I. What does this action do?

    EPA is providing notice of an update to its delegable authority for implementation and enforcement of the Federal standards shown in the tables below to the states of Iowa, Kansas, Missouri, and Nebraska. This action updates the delegation tables previously published at 78 FR 71510 (November 29, 2013). EPA has established procedures by which these agencies are automatically delegated the authority to implement the standards when they adopt regulations which are identical to the Federal standards. We then periodically provide notice of the new and revised standards for which delegation has been given. This document does not affect or alter the status of the listed standards under state or Federal law.

    II. What is the authority for delegation?

    1. Section 111(c)(1) of the Clean Air Act (CAA) authorizes EPA to delegate authority to any state agency which submits adequate regulatory procedures for implementation and enforcement of the NSPS program. The NSPS are codified at 40 CFR part 60.

    2. Section 112(l) of the CAA and 40 CFR part 63, subpart E, authorizes EPA to delegate authority to any state or local agency which submits adequate regulatory procedures for implementation and enforcement of emission standards for hazardous air pollutants. The hazardous air pollutant standards are codified at 40 CFR parts 61 and 63, respectively.

    III. What does delegation accomplish?

    Delegation confers primary responsibility for implementation and enforcement of the listed standards to the respective state and local air agencies. However, EPA also retains the concurrent authority to enforce the standards.

    IV. What has been delegated?

    Tables I, II, and III below list the delegated standards. Each item listed in the Subpart column has two relevant dates listed in each column for each state. The first date in each block is the reference date to the CFR contained in the state rule. In general, the state or local agency has adopted the applicable standard through the date as noted in the table. The second date is the most recent effective date of the state agency rule for which the EPA has granted the delegation. This document specifically addresses revisions to the columns for Iowa, Kansas, Missouri, and Nebraska and the local agencies of Lincoln-Lancaster County, Nebraska, and the city of Omaha, Nebraska. If there are no dates listed in the delegation table, the state has not accepted delegation of the standard and implementation of those standards reside with EPA.

    V. What has not been delegated?

    1. The EPA regulations effective after the first date specified in each block have not been delegated, and authority for implementation of these regulations is retained solely by EPA.

    2. In some cases, the standards themselves specify that specific provisions cannot be delegated. In such cases, a specific section of the standard details what authorities can and cannot be delegated. You should review the applicable standard in the CFR for this information.

    3. In some cases, the state rules do not adopt the Federal standard in its entirety. Each state rule (available from the respective agency) should be consulted for specific information.

    4. In some cases, existing delegation agreements between the EPA and the agencies limit the scope of the delegated standards. Copies of delegation agreements are available from the state agencies, or from this office.

    5. With respect to 40 CFR part 63, subpart A, General Provisions (see Table III), EPA has determined that sections 63.6(g), 63.6(h)(9), 63.7(e)(2)(ii) and (f), 63.8(f), and 63.10(f) cannot be delegated. Additional information is contained in an EPA memorandum titled “Delegation of 40 CFR part 63 General Provisions Authorities to State and Local Air Pollution Control Agencies” from John Seitz, Director, Office of Air Quality Planning and Standards, dated July 10, 1998.

    List of Delegation Tables

    Table I—Delegation of Authority—Part 60 NSPS—Region 7

    Sub-PartSource categoryState of IowaState of KansasState of MissouriState of Nebraska
    AGeneral Provisions06/28/11 10/24/1207/01/08 11/05/10 Except 60.4; 60.9; 60.10; 60.16.6/30/12 12/30/13 Except 60.4; 60.9; and 60.10.07/01/13. 05/13/14.
    Start Printed Page 10598
    DFossil-Fuel Fired Steam Generators for Which Construction is Commenced After August 17, 197106/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    DaElectric Utility Steam Generating Units for Which Construction is Commenced After September 18, 197806/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    DbIndustrial-Commercial-Institutional Steam Generating Units06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    DcSmall Industrial-Commercial-Institutional Steam Generating Units06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    EIncinerators06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    EaMunicipal Waste Combustors for Which Construction is Commenced After December 20, 1989, and on or before September 20 199406/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    EbLarge Municipal Waste Combustors for Which Construction is Commenced after September 20, 1994, or for Which Modification or Reconstruction is Commenced After June 19, 199606/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    EcHospital/Medical/Infectious Waste Incinerators for Which Construction Commenced after June 20, 199606/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    FPortland Cement Plants10/17/00 10/21/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    GNitric Acid Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    GaNitric Acid Plants for Which Construction, Reconstruction, or Modification Commenced After October 14, 20116/30/12 12/30/1307/01/13. 05/13/14.
    HSulfuric Acid Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    IHot Mix Asphalt Facilities06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    JPetroleum Refineries06/28/11 10/24/1207/01/08 11/05/10 Except provisions in Ja: 60.100a(c); in 60.101a, the definition of “flare”; 60.102a(g); and 60.107a(d) and (e).6/30/12 12/30/1307/01/13. 05/13/14.
    JaStandards of Performance for Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 20076/30/12 12/30/1307/01/13. 05/13/14.
    Start Printed Page 10599
    KStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 197806/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    KaStorage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 198406/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    KbVolatile Organic Liquid Storage Vessels (including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 198406/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    LSecondary Lead Smelters06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    MSecondary Brass and Bronze Production Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    NBasic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 197306/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    NaBasic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 198306/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    OSewage Treatment Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    PPrimary Copper Smelters06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    QPrimary Zinc Smelters06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    RPrimary Lead Smelters06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    SPrimary Aluminum Reduction Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    TPhosphate Fertilizer Industry: Wet Process Phosphoric Acid Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    UPhosphate Fertilizer Industry: Superphosphoric Acid Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    VPhosphate Fertilizer Industry: Diammonium Phosphate Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    WPhosphate Fertilizer Industry: Triple Superphosphate Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    XPhosphate Fertilizer Industry: Granular Triple Superphosphate Storage Facilities06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    YCoal Preparation Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    Start Printed Page 10600
    ZFerroalloy Production Facilities06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    AASteel Plants: Electric Arc Furnaces Constructed After October 21, 1974, and on or Before August 17, 198306/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    AAaSteel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After August 17, 198306/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    BBKraft Pulp Mills06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    CCGlass Manufacturing Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    DDGrain Elevators06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    EESurface Coating of Metal Furniture06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    GGStationary Gas Turbines06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    HHLime Manufacturing Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    KKLead-Acid Battery Manufacturing Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    LLMetallic Mineral Processing Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    MMAutomobile and Light Duty Truck Surface Coating Operations06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    NNPhosphate Rock Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    PPAmmonium Sulfate Manufacture06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    QQGraphic Arts Industry: Publication Rotogravure Printing06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    RRPressure Sensitive Tape and Label Surface Coating Operations06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    SSIndustrial Surface Coating: Large Appliances06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    TTMetal Coil Surface Coating06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    UUAsphalt Processing and Asphalt Roofing Manufacture06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    VVEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    VVaEquipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 20066/30/12 12/30/1307/01/13. 05/13/14.
    WWBeverage Can Surface Coating Industry06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    XXBulk Gasoline Terminals06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    AAANew Residential Wood Heaters07/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    Start Printed Page 10601
    BBBRubber Tire Manufacturing Industry06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    DDDVolatile Organic Compound (VOC) Emissions from the Polymer Manufacturing Industry06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    FFFFlexible Vinyl and Urethane Coating and Printing06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    GGGEquipment Leaks of VOC in Petroleum Refineries06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    GGGaEquipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 20066/30/12 12/30/1307/01/13. 05/13/14.
    HHHSynthetic Fiber Production Facilities06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    IIIVolatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) AIR Oxidation Unit Processes06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    JJJPetroleum Dry Cleaners06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    KKKEquipment Leaks of VOC from Onshore Natural Gas Processing Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    LLLOnshore Natural Gas Processing: SO2 Emissions06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    NNNVolatile Organic Compound (VOC) Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation Operations06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    OOONonmetallic Mineral Processing Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    PPPWool Fiberglass Insulation Manufacturing Plants06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    QQQVOC Emissions from Petroleum Refinery Wastewater Systems06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    RRRVolatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor Processes06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    SSSMagnetic Tape Coating Facilities06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    TTTIndustrial Surface Coating: Surface Coating of Plastic Parts for Business Machines06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    UUUCalciners and Dryers in Mineral Industries06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    Start Printed Page 10602
    VVVPolymeric Coating of Supporting Substrates Facilities06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    WWWMunicipal Solid Waste Landfills06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    AAAASmall Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which Modification or Reconstruction is Commenced After June 6, 200106/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    CCCCCommercial and Industrial Solid Waste Incineration Units for Which Construction is Commenced After November 30, 1999 or for Which Modification or Reconstruction is Commenced on or After June 1, 200106/28/11 10/24/1207/01/05 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    DDDDCommercial and Industrial Solid Waste Incineration Units that Commenced Construction On or Before November 30, 199907/01/05 11/05/10Not delegated07/01/13. 05/13/14.
    EEEEOther Solid Waste Incineration Units for Which Construction Commenced After December 9, 2004 or Modification or Reconstruction Commenced On or After June 16, 200606/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    FFFFOther Solid Waste Incineration Units that Commenced Construction On or Before December 9, 200407/01/08 11/05/10Not delegated07/01/13. 05/13/14.
    IIIIStationary Compression Ignition Internal Combustion Engines06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    JJJJStationary Spark Ignition Internal Combustion Engines06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    KKKKStationary Combustion Turbines06/28/11 10/24/1207/01/08 11/05/106/30/12 12/30/1307/01/13. 05/13/14.
    LLLLNew Sewage Sludge Incinerator Units6/30/12 12/30/1307/01/13. 05/13/14.
    MMMMEmission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units07/01/13. 05/13/14.
    OOOOCrude Oil and Natural Gas Production, Transmission and Distribution6/30/12 12/30/1307/01/13. 05/13/14.
    Start Printed Page 10603

    Table II—Delegation of Authority—Part 61 NESHAP—Region 7

    Sub-PartSource categoryState of IowaState of KansasState of MissouriState of NebraskaLincoln- Lancaster CountyCity of Omaha
    AGeneral Provisions9/19/11 10/24/1207/01/10 12/28/12 Except 61.04, 61.16 and 61.17.6/30/12 12/30/13 Except 61.04, 61.16 and 61.17.07/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    BRadon Emissions from Underground Uranium MinesNot delegatedNot delegatedNot delegatedNot delegatedNot delegatedNot delegated.
    CBeryllium9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    DBeryllium Rocket Motor Firing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    EMercury9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    FVinyl Chloride9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    JEquipment Leaks (Fugitive Emission Sources) of Benzene9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    LBenzene Emissions from Coke By-Product Recovery Plants9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    MAsbestos9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    NInorganic Arsenic Emissions from Glass Manufacturing Plants9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    OInorganic Arsenic Emissions From Primary Copper Smelters9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    PInorganic Arsenic Emissions From Arsenic Trioxide and Metallic Arsenic Production Facilities9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    QRadon Emissions From Department of Energy FacilitiesNot delegatedNot delegatedNot delegatedNot delegatedNot delegatedNot delegated.
    RRadon Emissions From Phosphogypsum StacksNot delegatedNot delegatedNot delegatedNot delegatedNot delegatedNot delegated.
    TRadon Emissions From the Disposal of Uranium Mill TailingsNot delegatedNot delegatedNot delegatedNot delegatedNot delegatedNot delegated.
    VEquipment Leaks (Fugitive Emission Sources)9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    WRadon Emissions From Operating Mill TailingsNot delegatedNot delegatedNot delegatedNot delegatedNot delegatedNot delegated.
    YBenzene Emissions From Benzene Storage Vessels9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    BBBenzene Emissions From Benzene Transfer Operations9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.
    FFBenzene Waste Operations9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/01 07/21/1007/01/13 12/10/1307/01/09. 12/22/12.

    Table III—Delegation of Authority—Part 63 NESHAP—Region 7

    Sub-PartSource categoryState of IowaState of KansasState of MissouriState of NebraskaLincoln- Lancaster CountyCity of Omaha
    AGeneral Provisions9/19/11 10/24/1207/01/10 12/28/12 Except 63.6(f)(1), (g), (h)(1) and (h)(9); 63.7(e)(2)(ii) and (f); 63.8(f); 63.10(f); 63.12; 63.13; 63.14(b)(27) and phrase “and table 5 to subpart DDDDD of this part”; 63.14(b)(35), (39) through (53), and (55) through (62); in 63.14(i)(1), the phrase “table 5 to subpart DDDDD of this part”; and 63.15.6/30/12 12/30/13 Except 63.13 & 63.15(a)(2).07/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    FOrganic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    Start Printed Page 10604
    GOrganic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    HOrganic Hazardous Air Pollutants for Equipment Leaks9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    IOrganic Hazardous Air Pollutants for Certain Processes Subject to the Negotiated Regulation for Equipment Leaks9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    JPolyvinyl Chloride and Copolymers Production9/19/11 10/24/1207/01/10 12/28/12Not delegatedNot delegated07/01/13 12/10/13.Not delegated.
    LCoke Oven Batteries9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13Not delegated07/01/13 12/10/13Not delegated.
    MNational Perchloroethylene Air Emission Standards for Dry Cleaning Facilities9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    NChromium Emissions From Hard and Decorative Chromium Electroplating and Chromium Anodizing Tanks9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    OEthylene Oxide Emissions Standards for Sterilization Facilities9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    QIndustrial Process Cooling Towers9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    RGasoline Distribution Facilities (Bulk Gasoline Terminals and Pipeline Breakout Stations)9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    SPulp and Paper Industry9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    THalogenated Solvent Cleaning9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    UPolymers and Resins Group I9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    WEpoxy Resins Production and Non-Nylon Polyamides Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    XSecondary Lead Smelting9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    YMarine Tank Vessel Loading Operations9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13.Not delegatedNot delegatedNot delegated.
    AA/BBPhosphoric Acid Manufacturing Plants/Phosphate Fertilizers Production Plants9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    CCPetroleum Refineries9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    DDOff-Site Waste and Recovery Operations9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    EEMagnetic Tape Manufacturing Operations9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    GGAerospace Industry Surface Coating Manufacturing and Rework Facilities9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    HHOil and Natural Gas Production Facilities9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    IIShipbuilding and Ship Repair (Surface Coating)9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13.Not delegatedNot delegatedNot delegated.
    JJWood Furniture Manufacturing Operations9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    KKPrinting and Publishing Industry9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    LLPrimary Aluminum Reduction Plants9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    MMChemical Recovery Combustion Sources at Kraft, Soda, Sulfite, and Stand-Along Semichemical Pulp Mills9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    OOTanks-Level 19/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    Start Printed Page 10605
    PPContainers9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    QQSurface Impoundments9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    RRIndividual Drain Systems9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    SSClosed Vent Systems, Control Devices, Recovery Devices and Routing to a Fuel Gas System or a Process9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    TTEquipment Leaks—Control Level 1 Standards9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    UUEquipment Leaks—Control Level 2 Standards9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    VVOil-Water Separators and Organic-Water Separators9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    WWStorage Vessel (Tanks)—Control Level 29/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    XXEthylene Manufacturing Process Units: Heat Exchange Systems and Waste Operations9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    YYGeneric Maximum Achievable Control Technology Standards9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    CCCSteel Pickling-HCL Process Facilities and Hydrochloric Acid Regeneration Plants9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    DDDMineral Wool Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    EEEHazardous Waste Combustors9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    GGGPharmaceutical Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    HHHNatural Gas Transmission and Storage Facilities9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    IIIFlexible Polyurethane Foam Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    JJJPolymers and Resins Group IV9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    LLLPortland Cement Manufacturing Industry12/20/06 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    MMMPesticide Active Ingredient Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    NNNWool Fiberglass Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    OOOManufacture of Amino/Phenolic Resins9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    PPPPolyether Polyols Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    QQQPrimary Copper Smelting9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13Not delegated07/01/13 12/10/13.Not delegated.
    RRRSecondary Aluminum Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    TTTPrimary Lead Smelting9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    UUUPetroleum Refineries9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    VVVPublicly Owned Treatment Works9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    XXXFerroalloys Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    AAAAMunicipal Solid Waste Landfills9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    CCCCManufacturing of Nutritional Yeast9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    DDDDPlywood and Composite Wood Products9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13Not delegated07/01/13 12/10/13.Not delegated.
    EEEEOrganic Liquids Distribution (Non-Gasoline)9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    FFFFMisc. Organic Chemical Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    GGGGSolvent Extraction for Vegetable Oil Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    HHHHWet Formed Fiberglass Mat Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    Start Printed Page 10606
    IIIISurface Coating of Automobiles and Light-Duty Trucks9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    JJJJPaper and Other Web Coating9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    KKKKSurface Coating of Metal Cans9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    MMMMSurface Coating of Misc. Metal Parts and Products9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    NNNNSurface Coating of Large Appliances9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    OOOOPrinting, Coating and Dyeing of Fabrics and Other Textiles9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    PPPPSurface Coating of Plastic Parts and Products9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    QQQQSurface Coating of Wood Building Products9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    RRRRSurface Coating of Metal Furniture9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    SSSSSurface Coating of Metal Coil9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    TTTTLeather Finishing Operations9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    UUUUCellulose Products Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    VVVVBoat Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    WWWWReinforced Plastic Composites Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    XXXXRubber Tire Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    YYYYStationary Combustion Turbines9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    ZZZZStationary Reciprocating Internal Combustion Engines01/30/13 10/23/137/1/09 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    AAAAALime Manufacturing Plants9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    BBBBBSemiconductor Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13Not delegated07/01/13 12/10/13.Not delegated.
    CCCCCCoke Ovens: Pushing, Quenching, and Battery Stacks9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13Not delegated07/01/13 12/10/13Not delegated.
    DDDDDIndustrial, Commercial and Institutional Boilers and Process HeatersNot delegatedNot delegated6/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13Not delegated.
    EEEEEIron and Steel Foundries9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    FFFFFIntegrated Iron and Steel Manufacturing Facilities9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    GGGGGSite Remediation9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    HHHHHMisc. Coating Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    IIIIIMercury Cell Chlor-Alkali Plants9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13Not delegated07/01/13 12/10/13.Not delegated.
    JJJJJBrick and Structural Clay Products ManufacturingNot delegatedNot delegatedNot delegatedNot delegated07/01/13 12/10/13.Not delegated.
    KKKKKClay Ceramics Manufacturing9/19/11 10/24/12Not delegatedNot delegatedNot delegated07/01/13 12/10/13.Not delegated.
    LLLLLAsphalt Processing and Asphalt Roofing Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    MMMMMFlexible Poly-urethane Foam Fabrication Operation9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    NNNNNHydrochloric Acid Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    PPPPPEngine Test Cells/Stands9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    QQQQQFriction Materials Manufacturing Facilities9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13Not delegated07/01/13 12/10/13.Not delegated.
    RRRRRTaconite Iron Ore Processing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13Not delegated07/01/13 12/10/13.Not delegated.
    SSSSSRefractory Products Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    TTTTTPrimary Magnesium Refining9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/13Not delegated07/01/13 12/10/13Not delegated.
    Start Printed Page 10607
    UUUUUCoal and Oil-fired Electric Utility Steam Generating UnitsNot delegated07/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    WWWWWHospital Ethylene Oxide Sterilizer9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    YYYYYElectric Arc Furnace Steelmaking Facilities or Stainless and Non-stainless Steel Manufacturing (EAFs)9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    ZZZZZIron and Steel Foundries Area Sources9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    BBBBBBGasoline Distribution Bulk Terminal, Bulk Plant and Pipeline Facilities9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    CCCCCCGasoline Distribution, Gasoline Dispensing Facilities1/24/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    DDDDDDPVC & Copolymer ProductionNot delegated07/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    EEEEEEPrimary Copper SmeltingNot delegated07/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    FFFFFFSecondary Copper SmeltingNot delegated07/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    GGGGGGPrimary Nonferrous MetalNot delegated07/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    HHHHHHPaint Stripping Operations, Misc. Surface Coating, Autobody Refinishing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    JJJJJJIndustrial, Commercial, and Institutional BoilersNot delegated07/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    LLLLLLAcrylic/Modacrylic Fibers Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    MMMMMMCarbon Black Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    NNNNNNChromium Compounds9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13,Not delegated.
    OOOOOOFlexible Polyurethane Foam Fabrication and Production9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    PPPPPPLead Acid Battery Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    QQQQQQWood Preserving9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    RRRRRRClay Ceramics Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    SSSSSSPressed & Blown Glass Manufacturing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    TTTTTTSecondary Non-Ferrous Metals9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/1307/01/11. 12/22/12.
    VVVVVVChemical Manufacturing Area Sources12/21/12 09/10/1407/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    WWWWWWPlating and Polishing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    XXXXXXMetal Fabrication and Finishing9/19/11 10/24/1207/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    YYYYYYFerroalloys ProductionNot delegated07/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    ZZZZZZArea Source Standards for Aluminum, Copper and Other Nonferrous Foundries6/28/11 1/24/1107/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    AAAAAAAAsphalt Processing and Asphalt Roofing ManufacturingNot delegated07/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    BBBBBBBChemical Preparations IndustryNot delegated07/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    CCCCCCCPaints and Allied Products Manufacturing6/28/11 1/24/1107/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    DDDDDDDPrepared Foods Manufacturing12/23/11 09/10/1407/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    EEEEEEEGold Mine Ore Processing and Production Area Source CategoryNot delegated07/01/10 12/28/126/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    HHHHHHHPolyvinyl Chloride and Copolymers ProductionNot delegated6/30/12 12/30/1307/01/13 05/13/1407/01/13 12/10/13.Not delegated.
    Start Printed Page 10608

    Note: At this time, Missouri is temporarily not accepting delegation for area source NESHAP requirements (40 CFR part 63, subparts 5W-7H) within the State of Missouri as described in an August 24, 2010 letter from MDNR to the U.S. EPA, Region 7.

    Summary of This Action

    All sources subject to the requirements of 40 CFR parts 60, 61, and 63 are also subject to the equivalent requirements of the above-mentioned state or local agencies.

    This document informs the public of delegations to the above-mentioned agencies of the above-referenced Federal regulations.

    Authority

    This document is issued under the authority of sections 101, 110, 112, and 301 of the CAA, as amended (42 U.S.C. 7401, 7410, 7412, and 7601).

    Start Signature

    Dated: February 13, 2015.

    Karl Brooks,

    Regional Administrator, Region 7.

    End Signature End Supplemental Information

    [FR Doc. 2015-04171 Filed 2-26-15; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
2/27/2015
Published:
02/27/2015
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Delegation of authority.
Document Number:
2015-04171
Dates:
This document is effective on February 27, 2015. The dates of delegation can be found in the SUPPLEMENTARY INFORMATION section of this document.
Pages:
10596-10608 (13 pages)
Docket Numbers:
EPA-R07-OAR-2015-0016, FRL-9923-69-Region-7
PDF File:
2015-04171.pdf
CFR: (3)
40 CFR 60
40 CFR 61
40 CFR 63