-
Start Preamble
AGENCY:
Federal Railroad Administration (FRA), U.S. Department of Transportation (DOT).
ACTION:
Notice.
SUMMARY:
FRA is issuing this notice to advise the public that FRA is rescinding the Notice of Intent (NOI) for each Environmental Impact Statement (EIS): the Dallas to Fort Worth Core Express Passenger Service between Dallas and Fort Worth, Texas and the New Orleans Rail Gateway in Jefferson and Orleans Parishes, Louisiana.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Michael Johnsen, Supervisory Environmental Protection Specialist, at the Federal Railroad Administration, 1200 New Jersey Avenue SE, Washington, DC 20590; telephone (202) 493-0845 or email Michael.Johnsen@dot.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
FRA is rescinding the NOIs for two EISs due to project scope changes proposed by the State sponsor. First, FRA is rescinding the NOI for the EIS evaluating the Dallas to Fort Worth Core Express Passenger Service between Dallas and Fort Worth. FRA issued the NOI on September 5, 2014.
Second, FRA is rescinding the NOI for the EIS evaluating the proposed New Orleans Rail Gateway Program. FRA issued the NOI on January 13, 2012.
FRA is recinding these NOIs following coordination with the State sponsors.
Start SignatureStart Printed Page 11446End Signature End Supplemental InformationIssued in Washington, DC.
Paul Nissenbaum,
Associate Administrator, Office of Railroad Policy and Development.
[FR Doc. 2020-03956 Filed 2-26-20; 8:45 a.m.]
BILLING CODE 4910-06-P
Document Information
- Published:
- 02/27/2020
- Department:
- Federal Railroad Administration
- Entry Type:
- Notice
- Action:
- Notice.
- Document Number:
- 2020-03956
- Pages:
- 11445-11446 (2 pages)
- PDF File:
- 2020-03956.pdf
- Supporting Documents:
- » Funding Opportunity: Federal-State Partnership for State of Good Repair Program
- » Funding Opportunities: Restoration and Enhancement Grants Program
- » Environmental ImpactStatements; Availability, etc.: Baltimore-Washington Superconducting Maglev Project between Baltimore, MD and Washington, DC
- » Railworthiness Directives: Certain Railroad Tank Cars Equipped with Bottom Outlet Valve Assembly and Constructed by American Railcar Industries and ACF Industries
- » Environmental Impact Statements; Availability, etc.: California High Speed Rail System San Francisco to San Jose Section, CA
- » Environmental Impact Statements; Availability, etc.: Link Union Station Project, Los Angeles, CA
- » Emergency Orders: Requirements for the National Railroad Passenger Corporation to Control Passenger Train Speeds at Certain Locations Along the Northeast Corridor
- » Safety Advisories: Mechanical Inspections, Wheel Impact Load Detector Standards for Trains Transporting Large Amountsof Class 3 Flammable Liquids
- » Environmental Impact Statements; Availability, etc.: Southeast High Speed Rail Project from Washington, DC to Richmond, VA
- » Environmental Impact Statements; Availability, etc.: Dallas-Fort Worth Core Express Service