95-4871. Energy Operations, Inc. et al.; Notice of Issuance of Amendment to Facility Operating License  

  • [Federal Register Volume 60, Number 39 (Tuesday, February 28, 1995)]
    [Notices]
    [Page 10881]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-4871]
    
    
    
    -----------------------------------------------------------------------
    
    
    NUCLEAR REGULATORY COMMISSION
    [Docket No. 50-416]
    
    
    Energy Operations, Inc. et al.; Notice of Issuance of Amendment 
    to Facility Operating License
    
        The U.S. Nuclear Regulatory Commission (Commission) has issued 
    Amendment No. 120 to Facility Operating License No. NPF-29 issued to 
    Energy Operations, Inc. (the licensee), which revised the Technical 
    Specifications for operation of the Grand Gulf Nuclear Station, Unit 1, 
    located in Claiborne County, Mississippi. The amendment is effective as 
    of the date of issuance.
        The amendment modified the technical specifications by replacing 
    the existing technical specifications in their entirety with a new set 
    of technical specifications based on NUREG-1434, ``Improved BWR-6 
    Technical Specifications,'' dated September 1992. This amendment was 
    based on the licensees submittal of October 15, 1993, as supplemented 
    by letters dated April 15, and November 10, 1994, and February 10 and 
    14, 1995.
        The application for the amendment complies with the standards and 
    requirements of the Atomic Energy Act of 1954, as amended (the Act), 
    and the Commission's rules and regulations. The Commission has made 
    appropriate findings as required by the Act and the Commission's rules 
    and regulations in 10 CFR Chapter I, which are set forth in the license 
    amendment.
        Notice of Consideration of Issuance of Amendment and Opportunity 
    for Hearing in connection with this action was published in the Federal 
    Register on April 12, 1994, (59 FR 17404) and April 21, 1994, (59 FR 
    19031). No request for a hearing or petition for leave to intervene was 
    filed following this notice.
        The Commission has prepared an Environmental Assessment related to 
    the action and has determined not to prepare an environmental impact 
    statement. Based upon the environmental assessment, the Commission has 
    concluded that the issuance of this amendment will not have a 
    significant effect on the quality of the human environment (60 FR 8739, 
    dated February 15, 1995).
        For further details with respect to the action see (1) the 
    application for amendment dated October 15, 1993, and supplemented by 
    letters dated April 15, and November 10, 1994, and February 10 and 14, 
    1995, (2) Amendment No. 120 to License No. NPF-29, (3) the Commission's 
    related Safety Evaluation, and (4) the Commission's Environmental 
    Assessment. All of these items are available for public inspection at 
    the Commission's Public Document Room, the Gelman Building, 2120 L 
    Street NW., Washington, DC 20555, and at the local public document room 
    located at the Judge George W. Armstrong Library, P.O. Box 1406, S. 
    Commerce at Washington, Natchez, Mississippi 39120.
    
        Dated at Rockville, Maryland, this 21st day of February 1995.
    
        For the Nuclear Regulatory Commission.
    William D. Beckner,
    Director, Project Directorate IV-1, Division of Reactor Projects III/V, 
    Office of Nuclear Reactor Regulation.
    [FR Doc. 95-4871 Filed 2-27-95; 8:45 am]
    BILLING CODE 7590-01-M
    
    

Document Information

Published:
02/28/1995
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
95-4871
Pages:
10881-10881 (1 pages)
Docket Numbers:
Docket No. 50-416
PDF File:
95-4871.pdf