97-4972. Tennessee Gas Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 40 (Friday, February 28, 1997)]
    [Notices]
    [Pages 9180-9181]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-4972]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP97-251-000]
    
    
    Tennessee Gas Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    February 24, 1997.
        Take notice that on February 18, 1997, Tennessee Gas Pipeline 
    Company, P.O. Box 2511, Houston, Texas 77252, filed in Docket No. CP97-
    251-000, a request pursuant to Section 157.205 and 157.212 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 
    18 CFR 157.212) for authorization to modify an existing receipt point 
    to include delivery capabilities for Bridgeline Gas Distribution L.L.C. 
    (Bridgeline), an interstate pipeline company, under Tennessee's blanket 
    certificate issued in Docket No. CP82-413-000, pursuant to 18 CFR Part 
    157, Subpart F of the Natural Gas Act, all as more fully set forth in 
    the request which is on file with the Commission and open to public 
    inspection.
        Tennessee proposes to modify an existing point located on its 
    system at approximately Mile Post 526A-2701-0.01 in Plaquemines Parish, 
    Louisiana, to include delivery capabilities in order to effectuate the 
    delivery of up to 5,000 dekatherms of natural gas per day for 
    Bridgeline. It is stated that to establish
    
    [[Page 9181]]
    
    this bi-directional point Tennessee will install, own, operate and 
    maintain a 4-inch restriction plate and electronic gas measurement and 
    will inspect Bridgeline's installation of measurement facilities. It is 
    further stated that Bridgeline will reimburse Tennessee for the cost of 
    this project which is approximately $18,600.
        Tennessee states that the service at the bi-directional point would 
    be provided on an interruptible basis and that: (i) volumes delivered 
    to Bridgeline after the modification of this receipt point would not 
    exceed the total volumes authorized prior to this request to modify the 
    receipt point; (ii) that establishing the proposed bi-directional point 
    is not prohibited by Tennessee's existing tariff; and, (iii) that 
    Tennessee has sufficient capacity to accomplish receipt and deliveries 
    at the proposed point without detriment or disadvantage to its other 
    customers.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-4972 Filed 2-27-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/28/1997
Department:
Energy Department
Entry Type:
Notice
Document Number:
97-4972
Pages:
9180-9181 (2 pages)
Docket Numbers:
Docket No. CP97-251-000
PDF File:
97-4972.pdf