95-2671. Environmental Impact Statement: Jefferson and Shelby Counties, Alabama  

  • [Federal Register Volume 60, Number 23 (Friday, February 3, 1995)]
    [Notices]
    [Pages 6766-6767]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-2671]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    Federal Highway Administration
    
    
    Environmental Impact Statement: Jefferson and Shelby Counties, 
    Alabama
    
    AGENCY: Federal Highway Administration (FHWA), DOT.
    
    ACTION: Notice of intent.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The FHWA is issuing this notice to advise the public that an 
    Environmental Impact Statement (EIS) and a Major Investment Study (MIS) 
    will be prepared for a proposed highway project in Jefferson and Shelby 
    Counties, Birmingham, Alabama.
    
    FOR FURTHER INFORMATION CONTACT:
    Mr. Joe D. Wilkerson, Division Administrator, Federal Highway 
    Administration, 500 Eastern Boulevard, suite 200, Montgomery, Alabama 
    36117-2018, telephone (334) 223-7370.
    
    SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Alabama 
    Department of Transportation, will prepare an EIS/MIS for a proposed 
    freeway/expressway facility within the U.S. 280 corridor extending 
    approximately 16.09 kilometers (10 miles) from E.B. Stephens Expressway 
    in Jefferson County to just east of Alabama State Route 119 in Shelby 
    County. Improvements to the corridor are considered necessary to 
    provide for the existing and projected traffic demand.
        Alternatives under consideration include: (1) Taking no action, (2) 
    conventional six-lane urban freeway with parallels service roads, (3) a 
    four-lane raised toll facility within the right-of-way and along the 
    sides of a six-lane arterial facility, (4) others build alternatives 
    which may be developed through the MIS process, and (5) alternate 
    travel demand strategies such as transit, carpooling, and vanpooling 
    which may also be considered in [[Page 6767]] conjunction with proposed 
    infrastructure improvements.
        Letters describing the proposed action and soliciting comments will 
    be sent to the appropriate Federal, State, and local agencies and 
    officials. A public information meeting and a public hearing will be 
    held. Public notice will be given of the time and place of the meeting 
    and hearing. The Draft EIS/MIS will be made available for public and 
    agency review and comment. No formal scoping meeting is planned at this 
    time.
        To ensure that the full range of issues related to this proposed 
    action are addressed and all significant issues identified, comments 
    and suggestions are invited from all interested parties. Comments or 
    questions concerning this proposed action and the EIS/MIS should be 
    directed to FHWA at the address provided above.
    
    (Catalog of Federal Domestic Assistant Program Number 20.205, 
    Highway, Research, Planning, and Construction. The regulations 
    implementing Executive Order 12372 regarding inter-governmental 
    consultation of Federal programs and activities apply to this 
    program).
    Joe D. Wilkerson,
    Division Administrator, Montgomery, Alabama.
    [FR Doc. 95-2671 Filed 2-2-95; 8:45 am]
    BILLING CODE 4910-22-M
    
    

Document Information

Published:
02/03/1995
Department:
Federal Highway Administration
Entry Type:
Notice
Action:
Notice of intent.
Document Number:
95-2671
Pages:
6766-6767 (2 pages)
PDF File:
95-2671.pdf