98-2599. Drawbridge Operation Regulation; Upper Mississippi River  

  • [Federal Register Volume 63, Number 22 (Tuesday, February 3, 1998)]
    [Rules and Regulations]
    [Page 5457]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-2599]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD08-98-002]
    
    
    Drawbridge Operation Regulation; Upper Mississippi River
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice of temporary deviation from regulations.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Commander, Eighth Coast Guard District has issued a 
    temporary deviation from the regulation governing the operation of the 
    Burlington Railroad Drawbridge at mile 403.1, across the Upper 
    Mississippi River. This deviation amends the federal drawbridge 
    operation regulations to require a six-hour advance notice to open for 
    the period of 12:01 a.m., December 31, 1997 to 12:01 a.m., March 1, 
    1998. This action is necessary in order for the bridge to undergo 
    required maintenance. Winter conditions on the Upper Mississippi River, 
    coupled with the closure of many Corps of Engineers' locks until March 
    of 1998, will preclude any significant navigation demands for bridge 
    openings.
    
    DATES: The deviation is effective from 12:01 a.m., December 31, 1997 to 
    12:01 a.m., March 1, 1998.
    
    FOR FURTHER INFORMATION CONTACT:
    Roger K. Wiebusch, Bridge Administrator, Director, Western Rivers 
    Operations, (314) 539-2900, extension 378.
    
    SUPPLEMENTARY INFORMATION: The Burlington Railroad Drawbridge swingspan 
    has a vertical clearance of 21.5 feet above normal pool in the closed 
    to navigation position. Navigation on the waterway consists primarily 
    of commercial tows and recreational watercraft. This change in 
    drawbridge operation has been coordinated with the commercial waterway 
    industry and fleeting operations in the area. Use of the waterway by 
    these groups is curtailed during lock closures and ice formation in the 
    winter months. The Burlington Railroad Drawbridge is located between 
    Locks 18 and 19 which will be closed during the period. Performing 
    maintenance on this bridge during the winter when no vessels are 
    impacted is preferred to bridge closures or advance notification 
    requirements during the commercial navigation season.
        This deviation is for the period 12:01 a.m., December 31, 1997 to 
    12:01 a.m., March 1, 1998. It requires that six hour advance notice be 
    made for the swingspan of the Burlington Railroad Drawbridge to open. 
    The drawbridge operation regulations, when not amended by a deviation, 
    require that the drawbridge open on-demand.
    
        Dated: January 20, 1998.
    T.W. Josiah,
    Rear Admiral, U.S. Coast Guard, Commander, Eighth Coast Guard District.
    [FR Doc. 98-2599 Filed 2-2-98; 8:45 am]
    BILLING CODE 4910-14-M
    
    
    

Document Information

Effective Date:
12/31/1997
Published:
02/03/1998
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
98-2599
Dates:
The deviation is effective from 12:01 a.m., December 31, 1997 to 12:01 a.m., March 1, 1998.
Pages:
5457-5457 (1 pages)
Docket Numbers:
CGD08-98-002
PDF File:
98-2599.pdf
CFR: (1)
33 CFR 117