98-2654. Florida Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 23 (Wednesday, February 4, 1998)]
[Notices]
[Page 5795]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-2654]
[[Page 5795]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-193-000]
Florida Gas Transmission Company; Notice of Request Under Blanket
Authorization
January 29, 1998.
Take notice that on January 20, 1998, Florida Gas Transmission
Company (FGT), 1400 Smith Street, Houston, Texas 77002, filed in Docket
No. CP98-191-000 a request pursuant to Section 157.205 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205) to
construct and operate a new Miami Dade South Meter Station and a 5,000-
foot lateral in Dade County, Florida for Metropolitan Dade County
(County), under FGT's blanket certificates issued in Docket No. CP82-
553-000 pursuant to Section 7 of the Natural Gas Act, all as more fully
set forth in the request which is on file with the Commission and open
to public inspection.
FGT states that the meter station which would include a tap, meter,
electronic flow measurement equipment, and other related appurtenant
facilities and the 5,000-foot lateral would be used for the delivery of
natural gas, up to 200,750 MMBtu per year, on a firm basis to County.
FGT states further that the estimated cost of constructing the
facilities is approximately $586,000 and would be reimbursed by County.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-2654 Filed 2-3-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 02/04/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-2654
- Pages:
- 5795-5795 (1 pages)
- Docket Numbers:
- Docket No. CP98-193-000
- PDF File:
-
98-2654.pdf