99-2627. Shutdown and Low-Power Operations for Nuclear Power Reactors
[Federal Register Volume 64, Number 23 (Thursday, February 4, 1999)]
[Proposed Rules]
[Page 5623]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-2627]
========================================================================
Proposed Rules
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains notices to the public of
the proposed issuance of rules and regulations. The purpose of these
notices is to give interested persons an opportunity to participate in
the rule making prior to the adoption of the final rules.
========================================================================
Federal Register / Vol. 64, No. 23 / Thursday, February 4, 1999 /
Proposed Rules
[[Page 5623]]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
10 CFR Part 50
RIN 3150-AE97
Shutdown and Low-Power Operations for Nuclear Power Reactors
AGENCY: U.S. Nuclear Regulatory Commission.
ACTION: Proposed rule: withdrawal.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission is withdrawing a
proposed rule for Shutdown and Low-Power Operations for Nuclear Power
Reactors. The proposed rule would have required licensees to ensure
that the following safety functions were maintained during shutdown and
low-power operations. These safety functions were reactivity control,
inventory control, decay heat removal, and containment integrity.
FOR FURTHER INFORMATION CONTACT: Mr. Eric Weiss, U.S. Nuclear
Regulatory Commission, Office of Nuclear Reactor Regulation, MS O-8
E23, Washington, DC 20555-0001, Telephone 301-415-3264.
SUPPLEMENTARY INFORMATION: On October 19, 1994, the Commission
published the proposed rule, ``Shutdown and Low-Power Operations for
Nuclear Power Reactors'' (59 FR 52707-52714). In this Federal Register
document, the Commission proposed regulatory requirements that would
set minimum standards for shutdown and low-power operations.
The comment period expired on February 3, 1995. The Commission
received a significant number of comments from the nuclear industry and
a few comments from the public on the proposed rule, the majority of
which were negative.
The Commission has decided not to proceed with a final rule at this
time. In view of current industry performance and the regulatory
controls in the area of maintenance generally, the Commission does not
believe that regulatory requirements specifically addressed to low-
power and shutdown operations are needed at this time. However, the
Commission will continue to monitor industry performance and may take
further action if any adverse trends are identified.
Dated at Rockville, Maryland, this 29th day of January, 1999.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
[FR Doc. 99-2627 Filed 2-3-99; 8:45 am]
BILLING CODE 7590-01-P
Document Information
- Published:
- 02/04/1999
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Proposed Rule
- Action:
- Proposed rule: withdrawal.
- Document Number:
- 99-2627
- Pages:
- 5623-5623 (1 pages)
- RINs:
- 3150-AE97: Shutdown and Fuel Storage Pool Operation at Nuclear Power Plants
- RIN Links:
- https://www.federalregister.gov/regulations/3150-AE97/shutdown-and-fuel-storage-pool-operation-at-nuclear-power-plants
- PDF File:
-
99-2627.pdf
- CFR: (1)
- 10 CFR 50