SUMMARY:
In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507(a)(1)(D), the Federal Energy Regulatory Commission (Commission or FERC) is submitting the information collection, FERC-729 (Electric Transmission Facilities), to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission issued a Notice in the Federal Register (77 FR 67638, 11/13/2012) requesting public comments. FERC received no comments on the FERC-729 and is making this notation in its submittal to OMB.
DATES:
Comments on the collection of information are due by March 6, 2013.
ADDRESSES:
Comments filed with OMB, identified by the OMB Control No. 1902-0238, should be sent via email to the Office of Information and Regulatory Affairs: oira_submission@omb.gov. Attention: Federal Energy Regulatory Commission Desk Officer. The Desk Officer may also be reached via telephone at 202-395-4718.
A copy of the comments should also be sent to the Federal Energy Regulatory Commission, identified by the Docket No. IC13-2-000, by either of the following methods:
- eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
- Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426.
Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email at DataClearance@FERC.gov, by telephone at (202) 502-8663, and by fax at (202) 273-0873.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Title: FERC-729 (Electric Transmission Facilities).Start Printed Page 7768
OMB Control No.: 1902-0238.
Type of Request: Three-year extension of the FERC-729 information collection requirements with no changes to the reporting requirements.
Abstract: This information collection implements the Commission's mandates under EPAct 2005 Section 1221 which authorizes the Commission to issue permits under FPA Section 216(b) for electric transmission facilities and the Commission's delegated responsibility to coordinate all other federal authorizations under FPA Section 216(h). The related FERC regulations seek to develop a timely review process for siting of proposed electric transmission facilities. The regulations provide for (among other things) an extensive pre-application process that will facilitate maximum participation from all interested entities and individuals to provide them with a reasonable opportunity to present their views and recommendations, with respect to the need for and impact of the facilities, early in the planning stages of the proposed facilities as required under FPA Section 216(d).
Additionally, FERC has the authority to issue a permit to construct electric transmission facilities if a state has withheld approval for more than a year or has conditioned its approval in such a manner that it will not significantly reduce transmission congestion or is not economically feasible.[1] FERC envisions that, under certain circumstances, the Commission's review of the proposed facilities may take place after one year of the state's review. Under Section 50.6(e)(3) the Commission will not accept applications until one year after the state's review and then from applicants who can demonstrate that a state may withhold or condition approval of proposed facilities to such an extent that the facilities will not be constructed.[2] In cases where FERC's jurisdiction rests on FPA section 216(b)(1)(C),[3] the pre-filing process should not commence until one year after the relevant State applications have been filed. This will give states one full year to process an application without any intervening Federal proceedings, including both the pre-filing and application processes. Once that year is complete, an applicant may seek to commence FERC's pre-filing process. Thereafter, once the pre-filing process is complete, the applicant may submit its application for a construction permit.
Type of Respondents: Electric transmission facilities.
Estimate of Annual Burden: [4] The Commission estimates the total Public Reporting Burden for this information collection as:
FERC-729—Electric Transmission Facilities
Number of respondents Number of responses per respondent Total number of responses Average burden hours per response Estimated total annual burden (A) (B) (A)×(B)=(C) (D) (C)×(D) Electric Transmission Facilities 1 1 1 9,600 9,600 The total estimated annual cost burden to respondents is $662,492.31 [9,600 hours ÷ 2080 [5] hours per year = 4.61538 * $143,540/year [6] = $662,492.31]
Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.
Start SignatureDated: January 28, 2013.
Kimberly D. Bose,
Secretary.
Footnotes
1. FPA section 216(b)(1)(C).
Back to Citation2. However, the Commission will not issue a permit authorizing construction of the proposed facilities until, among other things, it finds that the state has, in fact, withheld approval for more than a year or had so conditioned its approval.
Back to Citation3. In all other instances (i.e. where the state does not have jurisdiction to act or otherwise to consider interstate benefits, or the applicant does not qualify to apply for a permit with the State because it does not serve end use customers in the State), the pre-filing process may be commenced at any time.
Back to Citation4. Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3.
Back to Citation5. 2080 hours/year = 40 hours/week * 52 weeks/year
Back to Citation6. Average annual salary plus benefits per employee in 2012.
Back to Citation[FR Doc. 2013-02240 Filed 2-1-13; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 02/04/2013
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Action:
- Comment request.
- Document Number:
- 2013-02240
- Dates:
- Comments on the collection of information are due by March 6, 2013.
- Pages:
- 7767-7768 (2 pages)
- Docket Numbers:
- Docket No. IC13-2-000
- PDF File:
- 2013-02240.pdf