2016-02098. Drawbridge Operation Regulation; Columbia River, Vancouver, WA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of deviation from drawbridge regulations.

    SUMMARY:

    The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burlington Northern Santa Fe (BNSF) Railway Bridge across the Columbia River, mile 105.6, at Vancouver, WA. This deviation is necessary to accommodate maintenance to replace movable rail joints. This deviation allows the bridge to remain in the closed position during maintenance activities.

    DATES:

    This deviation is effective from 7 a.m. on March 8, 2016, to 7 p.m. on March 17, 2016.

    ADDRESSES:

    The docket for this deviation, [USCG-2016-0076] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email d13-pf-d13bridges@uscg.mil.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    BNSF requested that the BNSF Swing Bridge across the Columbia River, mile 105.6, remain closed to vessel traffic to remove and replace rail joints. During this installation period, the swing span of the bridge will be in the closed-to-navigation position; however, the span may be opened for maritime emergencies, but any emergency opening will necessitate a time extension to the approved dates. The BNSF Swing Bridge, mile 105.6, provides 39 feet of vertical clearance above Columbia River Datum 0.0 while in the closed position. The current operations for the swing bridge is in 33 CFR 117.5. This deviation allows the swing span of the BNSF Railway Bridge across the Columbia River, mile 105.6, to remain in the closed-to-navigation position, and need not open for maritime traffic from 7 a.m. to 7 p.m. on March 8, March 10, March 15, March 16 and March 17, 2016. These dates coincide with the Columbia River Bonneville lock and the Dalles lock. The bridge shall operate in accordance to 33 CFR 117.5 at all other times. Waterway usage on this part of the Columbia River includes vessels ranging from commercial tug and tow vessels to recreational pleasure craft including cabin cruisers and sailing vessels.

    Vessels able to pass through the bridge in the closed positions may do so at anytime. For the duration of the repair work, vessels will not be allowed to pass through the bridge. The bridge will be able to open for emergencies and there is no immediate alternate route for vessels to pass. The bridge can be opened for emergency vessels in response to a call, however, if an opening for emergencies is needed, an extension of this deviation will be required to complete the work. No immediate alternate route for vessels to pass is available on this part of the river.

    The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.

    In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: January 29, 2016.

    Steven M. Fischer,

    Bridge Administrator, Thirteenth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2016-02098 Filed 2-3-16; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
3/8/2016
Published:
02/04/2016
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of deviation from drawbridge regulations.
Document Number:
2016-02098
Dates:
This deviation is effective from 7 a.m. on March 8, 2016, to 7 p.m. on March 17, 2016.
Pages:
5916-5916 (1 pages)
Docket Numbers:
Docket No. USCG-2016-0076
PDF File:
2016-02098.pdf
CFR: (1)
33 CFR 117