97-2846. Acquisition Regulation: Limitation of Future Contracting  

  • [Federal Register Volume 62, Number 24 (Wednesday, February 5, 1997)]
    [Rules and Regulations]
    [Pages 5347-5349]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-2846]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    48 CFR Part 1552
    
    [FRL-5684-1]
    
    
    Acquisition Regulation: Limitation of Future Contracting
    
    AGENCY: Environmental Protection Agency.
    
    ACTION: Final rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Environmental Protection Agency (EPA) is revising its 
    acquisition regulation (48 CFR Chapter 15) to clarify that the existing 
    coverage regarding ineligibility of Headquarters policy support 
    contractors to enter into EPA response action contracts, unless 
    otherwise authorized by the contracting officer, also renders EPA 
    response action contractors ineligible for award of Headquarters policy 
    support contracts, unless otherwise authorized by the contracting 
    officer.
    
    EFFECTIVE DATE: March 7, 1997.
    
    FOR FURTHER INFORMATION CONTACT: Louise Senzel, U.S. Environmental 
    Protection Agency, Office of Acquisition Management (3802F), 401 M 
    Street, SW, Washington, D.C. 20460. Telephone: (202) 260-6204.
    
    SUPPLEMENTARY INFORMATION:
    
    A. Background
    
        The proposed rule was published in the Federal Register (61 FR 
    57623) on November 7, 1996, providing for a 60-day comment period.
        Interested persons have been afforded an opportunity to participate 
    in the making of this rule. No comments were received.
    
    [[Page 5348]]
    
    B. Executive Order 12866
    
        This rule is not a significant regulatory action for the purposes 
    of Executive Order 12866; therefore, no review was required by the 
    Office of Information and Regulatory Affairs.
    
    C. Paperwork Reduction Act
    
        The Paperwork Reduction Act does not apply because this rule does 
    not contain information collection requirements that require the 
    approval of OMB under the Paperwork Reduction Act of 1980 (44 U.S.C. 
    3501 et seq.).
    
    D. Regulatory Flexibility Act
    
        The EPA certifies that this rule does not exert a significant 
    economic impact on a substantial number of small entities. The 
    requirements to contractors under the rule impose no reporting, record-
    keeping, or any compliance costs. Therefore, no regulatory flexibility 
    analysis was prepared.
    
    E. Unfunded Mandates
    
        This rule will not impose unfunded mandates on state or local 
    entities, or others.
    
    F. Regulated Entities
    
        EPA contractors are entities potentially affected by this action. 
    Specifically, those entities competing under solicitations for 
    negotiated procurements will be affected.
    
    ------------------------------------------------------------------------
                  Category                         Regulated entity         
    ------------------------------------------------------------------------
    Industry............................  EPA Contractors.                  
    ------------------------------------------------------------------------
    
    List of Subjects in 48 CFR Part 1552
    
        Government procurement.
    
        Therefore, 48 CFR Chapter 15 is amended as set forth below:
        1. The authority citation for part 1552 continues to read as 
    follows:
    
        Authority: Sec. 205(c), 63 Stat. 390, as amended, 40 U.S.C. 
    486(c).
    
        2. Section 1552.209-74 is amended by revising the clause heading 
    and redesignating paragraphs (e), (f), (g), (h), and (i) as (f), (g), 
    (h), (i), and (j), and by adding a new paragraph (e) to read as 
    follows:
    
    
    1552.209-74   Limitation of future contracting.
    
    * * * * *
    
    Limitation of Future Contracting (ARCS) (Mar 1997)
    
    * * * * *
        (e) The Contractor and any subcontractors, during the life of 
    this contract, shall be ineligible to enter into an EPA contract or 
    a subcontract under an EPA contract, which supports EPA's 
    performance of Superfund Headquarters policy work including support 
    for the analysis and development of regulations, policies, or 
    guidance that govern, affect, or relate to the conduct of response 
    action activities, unless otherwise authorized by the Contracting 
    Officer. Examples of such contracts include, but are not limited to, 
    Superfund Management and Analytical support contracts, and Superfund 
    Technical and Analytical support contracts.
    * * * * *
        3. Section 1552.209-74, Alternate I is amended by revising the 
    heading and redesignating paragraphs (e), (f), (g), (h), and (i) as 
    (f), (g), (h), (i), and (j), and by adding a new paragraph (e) to read 
    as follows:
    
    Limitation of Future Contracting Alternate I (TCRR) (Mar 1997)
    
    * * * * *
        (e) The Contractor and any subcontractors, during the life of 
    this contract, shall be ineligible to enter into an EPA contract or 
    a subcontract under an EPA contract, which supports EPA's 
    performance of Superfund Headquarters policy work, including support 
    for the analysis and development of regulations, policies, or 
    guidance that govern, affect, or relate to the conduct of response 
    action activities, unless otherwise authorized by the Contracting 
    Officer. Examples of such contracts include, but are not limited to, 
    Superfund Management and Analytical support contracts, and Superfund 
    Technical and Analytical support contracts.
    * * * * *
        4. Section 1552.209-74, Alternate II is amended by revising the 
    heading and redesignating paragraphs (e), (f), (g), (h), and (i) as 
    (f), (g), (h), (i), and (j), and by adding a new paragraph (e) to read 
    as follows:
    
    Limitation of Future Contracting Alternate II (TAT) (Mar 1997)
    
    * * * * *
    
        (e) The Contractor and any subcontractors, during the life of this 
    contract, shall be ineligible to enter into an EPA contract or a 
    subcontract under an EPA contract, which supports EPA's performance of 
    Superfund Headquarters policy work, including support for the analysis 
    and development of regulations, policies, or guidance that govern, 
    affect, or relate to the conduct of response action activities, unless 
    otherwise authorized by the Contracting Officer. Examples of such 
    contracts include, but are not limited to, Superfund Management and 
    Analytical support contracts, and Superfund Technical and Analytical 
    support contracts.
    * * * * *
        5. Section 1552.209-74, Alternate III is amended by revising the 
    heading and redesignating paragraphs (c), (d), (e), and (f) as (d), 
    (e), (f), and (g), and by adding a new paragraph (c) to read as 
    follows:
    
    Limitation of Future Contracting Alternate III (ESAT) (Mar 1997)
    
    * * * * *
        (c) The Contractor and any subcontractors, during the life of 
    this contract, shall be ineligible to enter into an EPA contract or 
    a subcontract under an EPA contract, which supports EPA's 
    performance of Superfund Headquarters policy work, including support 
    for the analysis and development of regulations, policies, or 
    guidance that govern, affect, or relate to the conduct of response 
    action activities, unless otherwise authorized by the Contracting 
    Officer. Examples of such contracts include, but are not limited to, 
    Superfund Management and Analytical support contracts, and Superfund 
    Technical and Analytical support contracts.
    * * * * *
        6. Section 1552.209-74, Alternate IV is amended by revising the 
    heading and redesignating paragraphs (e), (f), (g), (h), and (i) as 
    (f), (g), (h), (i), and (j), and by adding a new paragraph (e) to read 
    as follows:
    
    Limitation of Future Contracting Alternate IV (TES) (Mar 1997)
    
    * * * * *
        (e) The Contractor and any subcontractors, during the life of 
    this contract, shall be ineligible to enter into an EPA contract or 
    a subcontract under an EPA contract, which supports EPA's 
    performance of Superfund Headquarters policy work including support 
    for the analysis and development of regulations, policies, or 
    guidance that govern, affect, or relate to the conduct of response 
    action activities, unless authorized by the Contracting Officer. 
    Examples of such contracts include, but are not limited to, 
    Superfund Management and Analytical support contracts, and Superfund 
    Technical and Analytical support contracts.
    * * * * *
        7. Section 1552.209-74, Alternate VI is amended by revising the 
    heading and redesignating paragraphs (e), (f), (g), (h), (i), and (j) 
    as (f), (g), (h), (i), (j), and (k), and by adding a new paragraph (e) 
    to read as follows:
    
    1552.209-74 LIMITATION OF FUTURE CONTRACTING ALTERNATE VI (SITE 
    SPECIFIC) (MAR 1997)
    
    * * * * *
        (e) The Contractor and any subcontractors, during the life of 
    this contract, shall be ineligible to enter into an EPA contract or 
    a subcontract under an EPA contract, which supports EPA's 
    performance of Superfund Headquarters policy work including support 
    for the analysis and development of regulations, policies, or 
    guidance that govern, affect, or relate to the conduct of response 
    action activities, unless authorized by the Contracting Officer. 
    Examples of such contracts include, but are not limited to, 
    Superfund Management and Analytical
    
    [[Page 5349]]
    
    support contracts, and Superfund Technical and Analytical support 
    contracts.
    * * * * *
        Dated: January 27, 1997.
    Diane M. Balderson,
    Acting Director, Office of Acquisition Management.
    [FR Doc. 97-2846 Filed 2-4-97; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Effective Date:
3/7/1997
Published:
02/05/1997
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
97-2846
Dates:
March 7, 1997.
Pages:
5347-5349 (3 pages)
Docket Numbers:
FRL-5684-1
PDF File:
97-2846.pdf
CFR: (1)
48 CFR 1552