98-2796. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 24 (Thursday, February 5, 1998)]
    [Notices]
    [Page 5936]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-2796]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-198-000]
    
    
    NorAm Gas Transmission Company; Notice of Request Under Blanket 
    Authorization
    
    January 30, 1998.
        Take notice that on January 23, 1998, NorAm Gas Transmission 
    Company Name (NGT), 1600 Smith Street, Houston, Texas 77002, filed a 
    request with the Commission in Docket No. CP98-198-000, pursuant to 
    Sections 157.205 and 157.211 of the Commission's Regulations under the 
    Natural Gas Act (NGA) for authorization to operate existing natural gas 
    facilities to be delivered to M.G. Industries (MGI) authorized in 
    blanket certificate issued in Docket Nos. CP82-384-000 and CP82-384-
    001, all as more fully set forth in the request on file with the 
    Commission and open to public inspection.
        NGT proposes to operate an existing 1,584 feet on 2-inch pipe, a 2-
    inch delivery tap and metering and regulating station on NGT's Line J 
    in Mississippi County, Arkansas to provide firm transportation service 
    to an MGI, an industrial customer. The estimated volumes to be 
    delivered through these facilities are 45,625 MMBtu annually and 125 
    MMBtu on a peak day.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-2796 Filed 2-4-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
02/05/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-2796
Pages:
5936-5936 (1 pages)
Docket Numbers:
Docket No. CP98-198-000
PDF File:
98-2796.pdf