2018-02230. Water Facilities Authority a Joint Power Agency; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Type of Proceeding: Application for surrender of conduit exemption.

    b. Project No.: 10532-006.

    c. Date Filed: January 18, 2018.

    d. Licensee: Water Facilities Authority a Joint Power Agency (WFA-JPA).

    e. Name of Project: WFA-JPA Regional Water Supply Energy Recovery Facilities Project.

    f. Location: The project is located on a water transmission pipeline near the City of Ontario, San Bernardino, California.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

    h. Licensee Contact: Ms. Chelsea Murphy, Natural Resources Project Manager, SWCA Environmental Consultants, 150 South Arroyo Parkway, Second Floor, Pasadena, California, Telephone: (626) 240-0587 ext. 6609, cmurphy@swca.com.

    i. FERC Contact: Ms. Rebecca Martin, (202) 502-6012, Rebecca.Martin@ferc.gov.

    j. Deadline for filing comments, interventions, and protests is February 28, 2018. The Commission strongly encourages electronic filing. Please file motions to intervene, protests and comments using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-10532-006.

    k. Description of Request: The project consists of the existing water supply transmission system and one powerhouse containing one turbine generating unit with a total rated capacity of 225 kilowatts (kW). The project has not operated since October 7, 2005. The demand for water at the project has been around 0.5 million gallons per day (MGD). The minimum required flow required to operate the hydrogenerator is 6.1 MGD. As a result, the exemptee, has determined it would like to surrender the exemption. Electricity to the hydrogenerator has been permanently disconnected. No ground disturbance is associated with the proposed surrender and project features will remain in place.

    l. This filing may be viewed on the Commission's website at http://www.ferc.gov/​docs-filing/​elibrary.asp. Enter the docket number (P-10532-006) excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction in the Commission's Public Reference Room located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502-8371.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .212 and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the surrender application that is the subject of this notice. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they Start Printed Page 5096must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Start Signature

    Dated: January 29, 2018.

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature End Preamble

    [FR Doc. 2018-02230 Filed 2-2-18; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
02/05/2018
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2018-02230
Pages:
5095-5096 (2 pages)
Docket Numbers:
Project No. 10532-006
PDF File:
2018-02230.pdf