Take notice that on January 17, 2019, Columbia Gas Transmission, LLC (Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-2700, filed an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission's regulations for authorization to replace and upgrade its VNG Suffolk No. 3 Meter Station, located in Suffolk, Virginia. Columbia states that the proposed project will increase the delivery capability of that meter station by 8,270 dekatherms per day while maintaining Columbia's current certificated capacity levels. Columbia asserts that there will be no change in pipeline system capacity as a result of the proposed project. Columbia estimates the cost of the project to be approximately $6.3 million, all as more fully set forth in the application, which is on file with the Commission and open for public inspection.
The filing may also be viewed on the web at http://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, (202) 502-8659.
Any questions regarding the proposed project should be directed to Jonathan Scullion, Regulatory and Commercial Law, TransCanada Corporation, 700 Louisiana Street, Houston, Texas 77002, by telephone at (832) 320-5520.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's EA.
There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 3 copies of filings made with the Commission and must provide a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.
However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.
Persons who wish to comment only on the environmental review of this Start Printed Page 2216project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list and will be notified of any meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission's final order.
As of the February 27, 2018 date of the Commission's order in Docket No. CP16-4-001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new NGA section 3 or section 7 proceeding.[1] Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-of-time, the movant is required to show good cause why the time limitation should be waived, and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission's Rules and Regulations.[2]
The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426.
Comment Date: February 21, 2019.
Start SignatureDated: January 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Footnotes
1. Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 50 (2018).
Back to Citation[FR Doc. 2019-01187 Filed 2-5-19; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 02/06/2019
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2019-01187
- Dates:
- February 21, 2019.
- Pages:
- 2215-2216 (2 pages)
- Docket Numbers:
- Docket No. CP19-51-000
- PDF File:
- 2019-01187.pdf