94-2737. Cumberland System of Projects  

  • [Federal Register Volume 59, Number 25 (Monday, February 7, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-2737]
    
    
    [[Page Unknown]]
    
    [Federal Register: February 7, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Southeastern Power Administration
    
     
    
    Cumberland System of Projects
    
    AGENCY: Southeastern Power Administration (Southeastern), DOE.
    
    ACTION: Notice.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Southeastern proposes to replace Rate Schedules CC-1-C, CK-1-
    B, CM-1-B, CBR-1-B, CEK-1-B, CSI-1-B, and CTV-1-B currently applicable 
    to Cumberland Basin Projects power and seeks approval of new Rate 
    Schedules CC-1-D, CK-1-C, CM-1-C, CBR-1-C, CEK-1-C, CSI-1-C, and CTV-1-
    C, for a 5-year period July 1, 1994, through June 30, 1999.
        Opportunities will be available for interested persons to review 
    the present rates, to review the proposed rates and supporting studies, 
    to participate in a public forum and to submit written comments. 
    Southeastern will evaluate all comments received in this process.
    
    DATES: Written comments are due on or before May 10, 1994. A public 
    information and comment forum will be held in Nashville, Tennessee, on 
    March 10, 1994. Persons desiring to speak at the forum should notify 
    Southeastern at least 4 days before the forum is scheduled, so that a 
    list of forum participants can be prepared. Others may speak if time 
    permits.
    
    ADDRESSES: Five copies of written comments should be submitted to: 
    Administrator, Department of Energy, Southeastern Power Administration, 
    Samuel Elbert Building, Elberton, Georgia 30635. The public information 
    and comment forum for the Cumberland Basin Projects will begin at 10 
    a.m. on March 10, 1994, in room A135 U.S. Courthouse Annex, 801 
    Broadway, Nashville, Tennessee 37203.
    
    FOR FURTHER INFORMATION CONTACT: Leon Jourolmon, Director, Power 
    Marketing Division, Department of Energy, Southeastern Power 
    Administration, Samuel Elbert Building, Elberton, Georgia 30635.
    
    SUPPLEMENTARY INFORMATION: The Federal Energy Regulatory Commission 
    (FERC) by order issued September 26, 1989, in Docket No. EF89-3021-000 
    confirmed and approved Wholesale Power Rate Schedules CBR-1-B, CSI-1-B, 
    CM-1-B, CC-1-B, CK-1-B, CTV-1-B, and CC-1-C, applicable to Cumberland 
    Basin Projects' power for the period July 1, 1989, through June 30, 
    1994.
    
    DISCUSSION: Existing rate schedules for the present Cumberland System 
    are predicated upon a May 1989 repayment study and other supporting 
    data all of which is contained in FERC Docket No. EF89-3021-000. The 
    current repayment study prepared in January of 1994 for the combined 
    Cumberland System shows that existing rates are not adequate to recover 
    all costs required by present repayment criteria.
        A revised repayment study with a net $2,235,000 revenue increase in 
    each future year over the current repayment study demonstrates that all 
    costs are paid within their repayment life. The net additional 
    requirement amounts to a net 6 percent increase in revenues and is 
    primarily due to increased O&M costs at the generating projects. It is 
    proposed that revised rate schedules applicable to TVA (for the benefit 
    of preference customers served from the TVA System) and Other 
    Preference Customers of Southeastern contain the following unit rates: 
    
                               TVA Rate Schedule                            
    Capacity at the generator/kw/month.............................   $1.181
    Energy at the generator/kwh (mills)............................    6.532
    Other Customers Rate Schedules (Excluding Carolina Power &              
     Light Area):                                                           
      Capacity delivered at interconnections with adjacent                  
       utilities/kw/month..........................................   $1.791
      Energy delivered at interconnections with adjacent utilities/         
       kwh (mills).................................................    6.665
    Customers served through the facilities of Carolina Power &             
     Light, Western Division (Rate Schedule CC-1-D)                         
      Capacity delivered kw/month..................................   $2.039
      Energy delivered kwh (mills).................................   7.091 
    
        The referenced January 1994 current repayment study along with a 
    revised repayment study dated January 1994 and previous system 
    repayment studies are available for examination at the Samuel Elbert 
    Building, Elberton, Georgia 30635. Proposed Rate Schedules CC-1-D, CK-
    1-C, CM-1-C, CBR-1-C, CSI-1-C, CEK-1-C, and CTV-1-C are also available.
    
        Issued in Elberton, Georgia, January 31, 1994.
    John A. McAllister, Jr.,
    Administrator.
    [FR Doc. 94-2737 Filed 2-4-94; 8:45 am]
    BILLING CODE 6450-01-P
    
    
    

Document Information

Published:
02/07/1994
Department:
Southeastern Power Administration
Entry Type:
Uncategorized Document
Action:
Notice.
Document Number:
94-2737
Dates:
Written comments are due on or before May 10, 1994. A public information and comment forum will be held in Nashville, Tennessee, on March 10, 1994. Persons desiring to speak at the forum should notify Southeastern at least 4 days before the forum is scheduled, so that a list of forum participants can be prepared. Others may speak if time permits.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: February 7, 1994