95-2920. Williams Natural Gas Co.; Notice of Application  

  • [Federal Register Volume 60, Number 25 (Tuesday, February 7, 1995)]
    [Notices]
    [Page 7186]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-2920]
    
    
    
    [[Page 7186]]
    
    DEPARTMENT OF ENERGY
    
    [Docket No. CP95-178-000]
    
    
    Williams Natural Gas Co.; Notice of Application
    
    February 1, 1995.
        Take notice that on January 26, 1995, Williams Natural Gas Company 
    (Williams), Post Office Box 3288, Tulsa, Oklahoma 74101, filed in 
    Docket No. CP95-178-000 an application pursuant to Sections 7(b) and 
    7(c) of the Natural Gas Act, requesting permission and approval to 
    abandon approximately 2,200 feet of 8-inch lateral pipeline and 
    authorization to construct and operate approximately 2,300 feet of 
    replacement line consisting of 2-inch and 6-inch lateral pipeline in 
    Wilson County, Kansas, all as more fully set forth in the application 
    of file with the Commission and open to public inspection.
        Specifically, Williams states that it proposes to replace line YB 
    across the road from its existing location in order to avoid a 
    Department of Transportation Class III designated area and to eliminate 
    1920's vintage pipe. Williams further stated that the replacement will 
    insure continued reliable service to the Neodesha, Kansas area.
        It is estimated that the cost of the proposed abandonment will be 
    approximately $2,000. It is further estimated that the replacement 
    facilities for this project will cost approximately $168,861, which 
    Williams proposes to finance with funds on hand.
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before February 22, 1995, 
    file with the Federal Energy Regulatory Commission, Washington, D.C. 
    20426, a motion to intervene or a protest in accordance with the 
    requirements of the Commission's Rules of Practice and Procedure (18 
    CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act 
    (18 CFR 157.10). All protests filed with the Commission will be 
    considered by it in determining the appropriate action to taken but 
    will not serve to make the protestants parties to the proceeding. Any 
    person wishing to become a party to a proceeding or to participate as a 
    party in any hearing therein must file a motion to intervene in 
    accordance with the Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that a grant of the certificate and permission and approval for 
    the proposed abandonment are required by the public convenience and 
    necessity. If a motion for leave to intervene is timely filed, or if 
    the Commission on its own motion believes that a formal hearing is 
    required, further notice of such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Williams to appear or be represented at the 
    hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-2920 Filed 2-6-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
02/07/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-2920
Pages:
7186-7186 (1 pages)
Docket Numbers:
Docket No. CP95-178-000
PDF File:
95-2920.pdf