E7-1927. Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Fishway Prescriptions  

  • Start Preamble January 31, 2007.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Type of Application: Amendment of License.

    b. Project No.: 2390-056.

    c. Date Filed: October 3, 2006.

    d. Applicant: Northern States Power Company of Wisconsin-d/b/a. Excel Energy, Inc.

    e. Name of Project: Big Falls Hydroelectric Project.

    f. Location: The project is located on the Flambeau River, in Rusk County, Wisconsin.

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).

    h. Applicant Contact: Mr. Robert W. Olson, Northern States Power Company of Wisconsin, d.b.a. Excel Energy, Inc., 1414 West Hamilton Avenue, P.O. Box 8, Eau Claire, WI 54702-008. Tel: (715) 839-1353.

    i. FERC Contact: Mr. Vedula Sarma, Telephone (202) 502-6190, and e-mail vedula.sarma@ferc.gov.

    j. Deadline for filing motions to intervene and protests, comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions is 60 days from the issuance of this notice; reply comments are due 105 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

    The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    Motions to intervene, protests, comments, recommendations, terms and conditions, and fishway prescriptions may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov) under the “e-Filing” link.

    k. This application has been accepted for filing and is now is ready for environmental analysis.

    The applicant proposes to amend the license for the Big Falls Project to include a jurisdictional Turtle-Flambeau Storage Reservoir located on the North Fork of the Flambeau River near Mercer County, Wisconsin, as a project feature of the Big Falls Project.

    l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, 202-502-8659. A copy is also available for inspection and reproduction at the address in item h above.

    Register online at http://www.ferc.gov/​esubscribenow.htm to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    m. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, 385.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    All filings must (1) bear in all capital letters the title “PROTEST”, “MOTION TO INTERVENE”, “COMMENTS,” “REPLY COMMENTS,” “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “ FISHWAY PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and Start Printed Page 5702conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, recommendations, terms and conditions or prescriptions should relate to project works which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    n. A license applicant must file no later than 60 days following the date of issuance of this notice of acceptance and ready for environmental analysis provided for in § 4.34(b)(5)(i): (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification.

    Start Signature

    Magalie R. Salas,

    Secretary.

    End Signature End Preamble

    [FR Doc. E7-1927 Filed 2-6-07; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
02/07/2007
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E7-1927
Pages:
5701-5702 (2 pages)
EOCitation:
of 2007-01-31
PDF File:
e7-1927.pdf