-
Start Preamble
AGENCY:
Federal Railroad Administration (FRA), Department of Transportation (DOT).
ACTION:
Notice of solicitation and funding opportunity (NOFO or notice); extension of application submittal period.
SUMMARY:
FRA is extending the application submittal period for its Notice for the Corridor Identification and Development program published on December 20, 2022, from March 20, 2023, to March 27, 2023.
DATES:
FRA extends the NOFO application period and applications are now due by 5 p.m. ET on March 27, 2023.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
For further information related to this notice and the Corridor Identification and Development Program, please contact Mr. Peter Schwartz, Acting Director, Office of Railroad Planning and Engineering at PaxRailDev@dot.gov or 202-493-6360.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
FRA amends its NOFO for the Corridor Identification and Development Program published on December 20, 2022 (87 FR 77920), by extending the period for submitting applications to 5 p.m. ET on March 27, 2023. The reason for the extension is due to a technical issue preventing applications from being received on March 20, 2023.
Start SignatureIssued in Washington, DC.
Amitabha Bose,
Administrator.
[FR Doc. 2023-02566 Filed 2-6-23; 8:45 am]
BILLING CODE 4910-06-P
Document Information
- Published:
- 02/07/2023
- Department:
- Federal Railroad Administration
- Entry Type:
- Notice
- Action:
- Notice of solicitation and funding opportunity (NOFO or notice); extension of application submittal period.
- Document Number:
- 2023-02566
- Dates:
- FRA extends the NOFO application period and applications are now due by 5 p.m. ET on March 27, 2023.
- Pages:
- 8033-8033 (1 pages)
- PDF File:
- 2023-02566.pdf
- Supporting Documents:
- » Funding Opportunity: Federal-State Partnership for State of Good Repair Program
- » Funding Opportunities: Restoration and Enhancement Grants Program
- » Environmental ImpactStatements; Availability, etc.: Baltimore-Washington Superconducting Maglev Project between Baltimore, MD and Washington, DC
- » Railworthiness Directives: Certain Railroad Tank Cars Equipped with Bottom Outlet Valve Assembly and Constructed by American Railcar Industries and ACF Industries
- » Environmental Impact Statements; Availability, etc.: California High Speed Rail System San Francisco to San Jose Section, CA
- » Environmental Impact Statements; Availability, etc.: Link Union Station Project, Los Angeles, CA
- » Emergency Orders: Requirements for the National Railroad Passenger Corporation to Control Passenger Train Speeds at Certain Locations Along the Northeast Corridor
- » Safety Advisories: Mechanical Inspections, Wheel Impact Load Detector Standards for Trains Transporting Large Amountsof Class 3 Flammable Liquids
- » Environmental Impact Statements; Availability, etc.: Southeast High Speed Rail Project from Washington, DC to Richmond, VA
- » Environmental Impact Statements; Availability, etc.: Dallas-Fort Worth Core Express Service