95-3154. Office of Pipeline Safety; Risk Assessment Prioritization (RAP)  

  • [Federal Register Volume 60, Number 26 (Wednesday, February 8, 1995)]
    [Notices]
    [Pages 7620-7623]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-3154]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    Research and Special Programs Administration
    [Docket No. PS-132; Notice 2]
    
    
    Office of Pipeline Safety; Risk Assessment Prioritization (RAP)
    
    AGENCY: Research and Special Programs Administration (RSPA), DOT.
    
    ACTION: Request for information.
    
    -----------------------------------------------------------------------
    
    SUMMARY: RSPA, through the Office of Pipeline Safety (OPS), is 
    implementing a pipeline Risk Assessment Prioritization (RAP) process 
    and invites representatives of industry, government agencies, 
    environmental organizations, public safety organizations and other 
    members of the public to contribute information on solutions to 
    pipeline safety issues. The proposed solutions are a vital part in 
    developing the RAP process. Through the RAP process, the solutions will 
    be prioritized and will become a basis upon which OPS management will 
    decide how to commit available resources.
    
    DATES: Responses to this request for information should be submitted on 
    or before April 10, 1995. Late-filed comments will be considered to the 
    extent practicable.
    
    ADDRESSES: Send comments in duplicate to the Dockets Unit, Room 8421, 
    Research and Special Programs Administration, U.S. Department of 
    Transportation, 400 Seventh Street, SW., Washington, DC 20590. Identify 
    the docket and notice number stated in the heading of this notice. All 
    comments and docketed material will be available for inspection and 
    copying in room 8421 between 8:30 a.m. and 5 p.m. each business day.
    
    FOR FURTHER INFORMATION CONTACT: Patrick J. Ramirez, (202) 366-9864, 
    regarding the subject matter of this notice. Contact the Dockets Unit, 
    (202) 366-5046, for docket material.
    
    SUPPLEMENTARY INFORMATION:
    
    Background on RAP
    
        OPS prescribes and enforces the safety standards for the 
    transportation of gases and hazardous liquids by pipeline and for 
    liquified natural gas facilities. OPS frequently must allocate its 
    resources to address safety actions identified by authorities outside 
    of the agency, including Congress, the National Transportation Safety 
    Board, and the General Accounting Office, OPS believes that pipeline 
    safety resources can be most effectively utilized through analyzing and 
    prioritizing of potential pipeline safety actions based on risk 
    assessment.
        The RAP process was developed following a thorough assessment of 
    OPS operations conducted in 1991 and the adoption in 1992 of a set of 
    goals necessary to enable OPS to respond most effectively to increasing 
    pipeline safety concerns. RAP is being developed as a management 
    process with which OPS may: identify pipeline safety and environmental 
    protection issues; identify potential solutions for these issues; 
    assess the relative impact of each solution on the likelihood or 
    consequences of pipeline accidents; estimate the cost to OPS and 
    industry of each proposed solution; and allocate available OPS 
    resources to the most cost-effective set of solutions.
        It is likely that OPS will not have the resources necessary to 
    implement, in the near term, all of the solutions proposed by industry, 
    OPS and other stakeholders. However, the RAP process will help ensure 
    that OPS can assign available resources to solutions that will produce 
    the greatest reduction in pipeline risks and environmental risks.
    
    Highlights of the RAP process
    
        The RAP process will utilize basic risk-based prioritization and 
    resource allocation models to help structure and focus OPS management 
    decisions. In addition, the process will facilitate effective 
    communication and interactions with OPS stakeholders through a common 
    understanding of pipelines safety concerns.
        The details of the RAP process are described in 58 FR 51402 dated 
    October 1, 1993. The sequence of steps in the RAP process is as 
    follows:
        a. Chart Pipeline Safety Subjects.
        b. Poll for Issues--Federal Register Notice dated Oct. 1, 1993.
        c. Insert Mandated Issues.
        d. Compile Issues List.
        e. Poll for Solutions--Current stage in the process.
        f. Insert Mandated Solutions.
        g. Compile Solutions List.
        h. Set Rating Criteria.
        i. Rate Each Solution.
        j. Estimate Economic Impact.
        k. Assemble Rated Priorities.
        l. Identify Mandates.
        m. Estimate Resource Availability.
        n. Assign Resources.
        o. Issue Action Plan.
        p. Monitor Performance.
        q. Maintain Data Base.
        r. Repeat Cycle.
    
    Request for Information
    
        The purpose of this notice is to solicit stakeholder participation 
    in the second data gathering step of the RAP process by collecting 
    solution statements associated with pipeline issues described in 
    Section B of this notice. After OPS has received and consolidated the 
    solutions, including solutions identified by OPS in connection with its 
    ongoing risk determination efforts (e.g., accident investigations, 
    special studies), OPS will hold a public meeting to ensure that 
    interested stakeholders have a thorough understanding of the issues and 
    solutions as well as the remainder of the RAP process. [[Page 7621]] 
    
    Form for a Solution Statement
    
        To aid in processing solution statements, OPS suggests a standard 
    format. Section A information may be provided one time for all 
    solutions submitted from one responder. A solution statement should 
    contain:
        A. The identification of the responder per Section A below.
        B. The B-code designation of the issue being addressed, per Section 
    B below.
        C. The complete proposed solution description. See Section C below 
    for discussion of a solution statement.
        D. The type of solution that is being proposed, per Section D 
    below.
        E. The kind of facility affected, selected from Section E below.
        As a guide for preparing solution statements, the following 
    examples are provided.
        Example 1.
        A. Responder identification
        B. B4.3 (Internal Corrosion)
        C. A regulation requiring the periodic use of smart pigs
        D. D3
        E. E2 (Liquid transportation lines)
        Example 2.
        A. Responder identification
        B. B4.3 (Internal Corrosion)
        C. Financial support of research to improve smart pigs
        D. D9 (Support research and development)
        E. E2 (Liquid transportation lines)
    
    Section A. Responder Identification
    
        A1  Responder name
        A2  Responder position or title
        A3  Responder organization
          Responder organization type (Operators indicate all applicable)
        A4a  Operator, hazardous liquid, gathering
        A4b  Operator, hazardous liquid, transportation
        A4c  Operator, gas, gathering
        A4d  Operator, gas, transmission
        A4e  Operator, gas, distribution
        A4f  Operator, LNG facility
        A4g  Pipeline industry association
        A4h  Pipeline contractor
        A4i  Pipeline supplier
        A4j  Environmental organization
        A4k  Consumer safety organization
        A4l  Government, federal
        A4m  Government, state
        A4n  Government, municipal
        A4o  Public
        A4p  Other (Please specify)
        A5  Address
        A6  Contact name (If other than responder)
        A7  Contact phone number
        A8  Contact facsimile number
    
    Section B. Consolidated Issues List
    
        The following consolidated issues list represents the key elements 
    of the issues that the respondents provided to RSPA's request for 
    information, 58 FR 51402; October 1, 1993. OPS analyzed over 400 
    responses, converted proposed solution statements into issues 
    statements, and to an appropriate degree, consolidated variations of 
    similar issue statements. In preparing proposals for solutions, 
    respondents are encouraged to give their widest interpretation to any 
    of the 189 issues listed below. A solution statement may apply to more 
    than one issue provided each issue being addressed is listed using the 
    designated issue code (i.e., B1, B2, etc).
        The consolidated list is organized into five categories of issues 
    contributing to the probability of pipeline accident occurrence; five 
    categories of issues contributing to the consequence of pipeline 
    accidents and one category that includes issues directed at identifying 
    and managing risks. The five categories for probability and consequence 
    are, Design, Construction, Operations and Maintenance, Corrosion and 
    Outside Force.
        B1 DESIGN ISSUES CONTRIBUTING TO THE PROBABILITY OF ACCIDENT 
    OCCURRENCE     DUE TO:
    
        or DUE TO LACK OF:
        or DUE TO INADEQUATE:
        B1.1   Allowable maximum operating pressure
        B1.2   Breakout tanks
        B1.3   Materials selection
        B1.3.A  --Steel pipe toughness
        B1.3.B  --Steel pipe weldability
        B1.4   Obsolescent technology
        B1.5   Obstacles to instrumented internal inspection
        B1.6   Offshore pipelines
        B1.7   Railroad rights-of-way
        B1.8   Thin wall, high strength pipe
        B1.9   Underwater hazards to navigation
        B1.10   Valve definitions
    
        B2 CONSTRUCTION ISSUES CONTRIBUTING TO THE PROBABILITY OF ACCIDENT 
    OCCURRENCE    DUE TO;
    
        or DUE TO LACK OF;
        or DUE TO INADEQUATE;
        B2.1   Hydrostatic testing
        B2.1.A  --Errors
        B2.1.B  --Procedures
        B2.2   Inspection
        B2.2.A  --for errors and flaws
        B2.2.B  --of girth welds
        B2.2.C  --for rock impingement
        B2.2.D  --of welded split sleeves
        B2.3   Maps and records
        B2.4   Material and equipment noncompliance
        B2.4.A  --pre-1970 (low frequency) ERW pipe
        B2.4.B  --railroad transportation fatigue cracks
        B2.5   Plastic pipe electrofusion joints
        B2.6   Plastic pipe fusion joints
        B2.6.A  --dissimilar materials
        B2.7   Specifications
        B2.8   Tracer wire wraps around plastic pipe
    
        B3 OPERATIONS AND MAINTENANCE ISSUES CONTRIBUTING TO THE 
    PROBABILITY OF ACCIDENT OCCURRENCE    DUE TO:
    
        or DUE TO LACK OF:
        or DUE TO INADEQUATE:
        B3.1   Accident investigations
        B3.2   Allowable maximum operating pressure
        B3.2.A  --Exceeding
        B3.2.A.1  >grandfathered pipelines
        B3.2.B  --Low safety margin relative to test pressure
        B3.2.B.1  >in Class 1 locations
        B3.2.C--Reduction following an incident
        B3.3   Branch service lines
        B3.4   Breakout tanks
        B3.5   Baypass lines/direct sales lines/farm taps
        B3.6   Control systems
        B3.6.A  --Excessive false alarms
        B3.7   Customer owned gas lines
        B3.8   Drug and alcohol abuse
        B3.9   Equipment failure
        B3.10   HVL facilities
        B3.10.A  --Two phase flow
        B3.11   Hydrostatic testing
        B3.11.A  --Exemption from
        B3.11.B  Periodic
        B3.12   Inspections
        B3.12.A  --Third party construction activity
        B3.12.B  --Encroachment
        B3.12.C  --Dents and gouges
        B3.12.D  --Cased crossings
        B3.12.E  --Minimum cover
        B3.12.F  --Obstacles to instrumented internal inspection
        B3.12.G  --Reporting requirements after voluntary use of 
    instrumented internal inspection
        B3.12.H  --Requirements for instrumented internal inspection
        B3.12.I  --Technical variability among instrumented internal 
    inspection.
        B3.13   Liquefied natural gas/petroleum gas (LNG/LPG) 
    systems
        B3.13.A  --Dense gas dispersion model
        B3.13.B  --Mobile LNG facilities
        B3.14   Pipeline Marker destruction
        B3.15   Obsolescent technology
        B3.16   Offshore pipelines
        B3.17   Operator qualification
        B3.17.A  --Excavator
        B3.17.B  --Pipeline
        B3.17.C  --Master meter system
        B3.17.D  --Liquid petroleum gas [[Page 7622]] distribution system
        B3.18   Pipeline age
        B3.19   Pipeline realignment
        B3.20   Plans and procedures
        B3.21   Protection of pipeline employees
        B3.22   Railroad rights-of-way
        B3.23   Records and reports
        B3.23.A  --Annual
        B3.23.B  --Incident
        B3.24   Reduced operating staff
        B3.25   Repairs/rehabilitation
        B3.25.A  --Casing shorts
        B3.25.B  --Cast iron pipe
        B3.25.B.1  >Aging
        B3.25.B.2  >Graphitization
        B3.25.B.3  >Movement
        B3.25.C  --Pipe support during
        B3.26   Small gas distribution systems
        B3.27   Training
        B3.28   Underground utility location
        B3.29   Underwater hazards to navigation
    
        B4 CORROSION ISSUES CONTRIBUTING TO THE PROBABILITY OF ACCIDENT 
    OCCURRENCE    DUE TO:
    
        or DUE TO LACK OF:
        or DUE TO INADEQUATE:
        B4.1   Atmospheric
        B4.2   External
        B4.2.A  --Bare steel pipe
        B4.2.B  --Cathodic protection
        B4.2.B.1  >Inconsistent regulations
        B4.2.B.2  >Test points
        B4.2.B.3  >Surveys
        B4.2.C  --Coating
        B4.2.C.1  >Condition
        B4.3   Internal
        B4.4   Tank bottom
    
        B5 OUTSIDE FORCE DAMAGE TO BURIED PIPELINES ISSUES CONTRIBUTING TO 
    THE PROBABILITY OF ACCIDENT OCCURRENCE    DUE TO:
    
        or DUE TO LACK OF:
        or DUE TO INADEQUATE:
        B5.1   Digging with power mechanical equipment instead of 
    hand digging in close proximity to facilities
        B5.2   Natural forces
        B5.3   Operator personnel
        B5.3.A  --Pumping stations
        B5.4   Public activity
        B5.4.A  --Gas distribution facilities
        B5.5   Third party operations
        B5.5.A  --Mandatory state one-call system
        B5.5.B  --Universal/uniform one-call system
        B5.5.C  --Statutory one-call enforcement authority
        B5.5.D  --Without using available one-call system
        B5.5.E  --One-call system public education
        B5.5.F  --While exempt from available one-call systems
        B5.5.G  --Incorrect operator one-call marks
        B5.5.H  --Ignoring one-call marks
        B5.5.I  --One-call marks are altered/removed
        B5.5.J  --Violation of one-call laws (inadequate penalties/
    enforcement)
        B5.5.K  --Incorrect construction marks
        B5.5.L  --Pipeline markers are inadequate
        B5.5.M  --Public right-of-way
        B5.6   Unreported or unrecognized damage
        B5.7   Vandalism or sabotage
    
        B6 DESIGN ISSUES CONTRIBUTING TO THE CONSEQUENCES OF ACCIDENTS THAT 
    OCCUR    DUE TO:
    
        or DUE TO LACK OF:
        or DUE TO INADEQUATE:
        B6.1   Allowable maximum operating pressure
        B6.1.A  --High risk areas
        B6.2   HVL facilities
        B6.3   Proximity to inhabited buildings
        B6.4   Uncontrolled leaks
        B6.4.A  --Service lines
        B6.5   Valve remote control
        B6.6   Valve location
    
        B7 CONSTRUCTION ISSUES CONTRIBUTING TO THE CONSEQUENCES OF 
    ACCIDENTS THAT OCCUR    DUE TO:
    
        or DUE TO LACK OF:
        or DUE TO INADEQUATE:
        B7.1   Environmental damage
    
        B8 OPERATIONS AND MAINTENANCE ISSUES CONTRIBUTING TO THE 
    CONSEQUENCES OF ACCIDENTS THAT OCCUR    DUE TO:
    
        or DUE TO LACK OF:
        or DUE TO INADEQUATE:
        B8.1   Allowable maximum operating pressure
        B8.1.A  --High risk areas
        B8.2   Check valve malfunction
        B8.3   Emergency response
        B8.3.A  --Environmentally sensitive areas
        B8.3.A.1  >Definition
        B8.3.B  --Highly populated areas
        B8.3.C  --Water supplies
        B8.4   Hazardous concentrations of hydrogen sulfide
        B8.5   HVL facilities
        B8.6   Leaks
        B8.6.A  --Undetected, in Service lines
        B8.6.B  --Unrecognized
        B8.6.B.1  --During unsteady operations
        B8.7   Protection of pipeline employees
    
        B9 CORROSION ISSUES CONTRIBUTING TO THE CONSEQUENCES OF ACCIDENTS 
    THAT OCCUR    DUE TO:
    
        or DUE TO LACK OF:
        or DUE TO INADEQUATE:
    
    The issues received were not appropriate for this category. The 
    responder may submit issues and solutions for this category.
        B10 OUTSIDE FORCE ISSUES CONTRIBUTING TO THE CONSEQUENCES OF 
    ACCIDENTS THAT OCCUR    DUE TO:
    
        or DUE TO LACK OF:
        or DUE TO INADEQUATE:
    
    The issues received were not appropriate for this category. The 
    responder may submit issues and solutions for this category.
        B11 ISSUES THAT AFFECT OPS'S AND INDUSTRY'S ABILITY TO IDENTIFY AND 
    MANAGE RISKS    DUE TO:
    
        or DUE TO LACK OF:
        or DUE TO INADEQUATE:
        B11.1   Accident investigations
        B11.1.A  --Confidentiality of information
        B11.2   Conflicting responsibilities among conformance 
    authorities
        B11.2.A  --Interstate pipelines
        B11.2.B  --Marine transfer pipelines
        B11.2.C  --Setback requirements
        B11.3   Federal/State
        B11.3.A  --Accident investigation coordination
        B11.3.B  --Facility inspection
        B11.3.B.1  >frequency
        B11.3.B.2  >of master meter systems
        B11.3.C  --Inspector
        B11.3.C.1  >competence
        B11.3.C.2  >corrosion control training
        B11.3.C.3  >staff size
        B11.3.D  --Non-uniform regulatory enforcement
        B11.4   Fines and penalties
        B11.5   Incident reporting thresholds
        B11.6   Maps, records and reports
        B11.6.A  --Analysis
        B11.6.B  --Annual
        B11.6.C  --Incident
        B11.6.D  --High risk areas
        B11.7   Public education
        B11.8   Regulation ambiguities
        B11.9   State highway non-uniformity in design requirements
        B11.10   Unregulated
        B11.10.A  --Gathering pipelines
        B11.10.B  --Low stress pipelines
        B11.10.C  --Underground storage
    
    Section C. Solution Statement
    
    A SOLUTION is one of a number of remedies to one or more issues from 
    [[Page 7623]] Section B listed above. The respondent's proposed 
    solution statement should be complete and specific, but reasonably 
    concise. See examples above in Form for a Solution Statement.
    
    Section D. Type of Solution
    
        To aid in consolidating the actions being proposed by each solution 
    statement, select an action or actions for each solution from the 
    listing below:
    
        D1. A new or revised regulation that requires changes in industry 
    design practices
        D2. A new or revised regulation that requires changes in industry 
    construction practices
        D3. A new or revised regulation that requires changes in industry 
    operational and maintenance practices
        D4. A new or revised regulation that requires changes in industry 
    reporting policies
        D5. A new or revised OPS enforcement policy concerning and existing 
    regulation
        D6. A new or revised OPS audit or inspection practice
        D7. A research activity to improve OPS/industry knowledge 
    concerning the causes and effects of pipeline accidents
        D8. A research activity to improve OPS/industry knowledge 
    concerning the effects of proposed risk-reduction technologies
        D9. Other (Please specify)
    
    Section E. Type of Facility
    
        E1  Hazardous liquid gathering pipelines.
        E2  Hazardous liquid transportation pipelines.
        E3  Two-phase pipelines.
        E4  Gas gathering pipelines.
        E5  Gas transmission pipelines.
        E6  Gas distribution pipelines.
        E7  Gas master meter systems.
        E8  LPG distribution systems.
        E9  LNG facilities.
        E10  All liquid pipelines.
        E11  All gas pipelines.
        E12  All pipelines.
        E13  Other (Specify)
    
        Authority: 49 U.S.C. Sec. 60101 et seq.; 49 CFR 1.53.
    
        Issued in Washington, DC on February 2, 1995.
    George W. Tenley, Jr.,
    Associate Administrator for Pipeline Safety.
    [FR Doc. 95-3154 Filed 2-7-95; 8:45 am]
    BILLING CODE 4910-60-P
    
    

Document Information

Published:
02/08/1995
Department:
Research and Special Programs Administration
Entry Type:
Notice
Action:
Request for information.
Document Number:
95-3154
Dates:
Responses to this request for information should be submitted on or before April 10, 1995. Late-filed comments will be considered to the extent practicable.
Pages:
7620-7623 (4 pages)
Docket Numbers:
Docket No. PS-132, Notice 2
PDF File:
95-3154.pdf