99-2929. Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes in FERC Gas Tariff
[Federal Register Volume 64, Number 25 (Monday, February 8, 1999)]
[Notices]
[Pages 6066-6067]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-2929]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. TM99-4-29-000]
Transcontinental Gas Pipe Line Corporation; Notice of Proposed
Changes in FERC Gas Tariff
February 2, 1999.
Take notice that on January 27, 1999 Transcontinental Gas Pipe Line
Corporation (Transco) tendered for filing to become part of its FERC
Gas Tariff, Third Revised Volume No. 1, certain revised tariff sheets,
which tariff sheets are enumerated in Appendix A attached to the
filing, to be effective December 1, 1998, January 1, 1999 and February
1, 1999.
Transco states that the purpose of the instant filing is to track
rate changes attributable to transportation service purchased from
Texas Gas Transmission Corporation (Texas Gas) under its Rate Schedule
FT the costs of which are included in the rates and charges payable
under Transco's Rate Schedule FT-NT, and storage service purchased from
CNG Transmission Corporation (CNG) under its Rate Schedule GSS the
costs of which are included in the rates and charges payable under
Transco's Rate Schedules GSS and LSS.
Transco states that the filing is being made pursuant to tracking
provisions under Section 4 of Transco's Rate Schedule FT, Section 3 of
Transco's Rate Schedule GSS and Section 4 of Transco's Rate Schedule
LSS.
Transco states that included in Appendices B and C attached to the
filing are the explanations of the rate changes and details regarding
the computation of the revised Rate Schedule FT-NT, GSS and LSS rates.
Transco states that copies of the filing are being mailed to each
of its FT-NT, GSS and LSS customers and interested State Commission.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or a protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Sections 385.214 or 385.211 of the Commission's
Rules and Regulations. All such motions or protests must be filed in
accordance with section 154.210 of the Commission's Regulations.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceedings. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
[[Page 6067]]
Commission and are available for public inspection in the Public
Reference Room.
David P. Boergers,
Secretary.
[FR Doc. 99-2929 Filed 2-5-99; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 02/08/1999
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 99-2929
- Pages:
- 6066-6067 (2 pages)
- Docket Numbers:
- Docket No. TM99-4-29-000
- PDF File:
-
99-2929.pdf