96-2835. Texas Utilities Electric Company; Comanche Peak Steam Electric Station, Units 1 and 2; Notice of Issuance of Environmental Assessment and Finding of No Significant Impact  

  • [Federal Register Volume 61, Number 28 (Friday, February 9, 1996)]
    [Notices]
    [Pages 5042-5043]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-2835]
    
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    [Docket Nos. 50-445 and 50-446]
    
    
    Texas Utilities Electric Company; Comanche Peak Steam Electric 
    Station, Units 1 and 2; Notice of Issuance of Environmental Assessment 
    and Finding of No Significant Impact
    
        The U.S. Nuclear Regulatory Commission (the Commission) is 
    considering issuance of an exemption from certain requirements of its 
    regulations for Facility Operating License Nos. NPF-87 and NPF-89, 
    issued to Texas Utilities Electric Company (TU Electric, the licensee), 
    for the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, 
    located in Somervell County, Texas.
    
    [[Page 5043]]
    
    
    Identification of the Proposed Amendment
    
        The current licensing basis for CPSES allows up to 1116 fuel 
    assemblies in two storage pools. The currently authorized as-installed 
    configuration has 20 low density racks installed in Spent Fuel Pool No. 
    1 (SFP1) (556 fuel assembly locations). The proposed action would 
    authorize the use of high density spent fuel storage racks in Spent 
    Fuel Pool No. 2 (SPF2) with a capacity for storing 735 fuel assemblies, 
    for a total of 1291 fuel assemblies.
        The proposed action is in accordance with the licensee's 
    application for license amendment dated December 30, 1994, as 
    supplemented by letters dated July 28, September 14, and November 29, 
    1995, and January 2, 1996.
    
    The Need for the Proposed Action
    
        The ``Final Generic Environmental Impact Statement (FGEIS) on 
    Handling and Storage of Spent Light Water Power Reactor Fuel,'' NUREG-
    0575, Volumes 1-3, concluded that the environmental impact of interim 
    storage of spent fuel was negligible and the cost of various 
    alternatives reflects the advantage of continued generation of nuclear 
    power with the accompanying spent fuel storage. Because the differences 
    in design, the FGEIS recommended evaluating spent fuel pool expansion 
    on a case-by-case basis.
        For CPSES, the expansion of the storage capacity of SFP2 will not 
    create any significant additional radiological effects or 
    nonradiological environmental impacts.
        The additional whole body dose that might be received by an 
    individual at the site boundary and the estimated dose to the 
    population within 80 kilometer radius is believed to be too small to 
    have any significance when compared to the fluctuations in the annual 
    dose this population receives from exposure to background radiation. 
    The occupational radiation dose for the proposed operation of the 
    expanded spent fuel pool is estimated to be less than one percent of 
    the total annual occupational radiation exposure for this facility.
        The only nonradiological impact affected by the expansion of SFP2 
    is the waste heat rejected. The total increase in heat load rejected to 
    the environment will be small in comparison to the amount of total heat 
    currently being released. There is no significant environmental impact 
    attributed to the waste heat from the plant due to this very small 
    increase.
    
    Finding of No Significant Impact
    
        The staff has reviewed the proposed spent fuel pool expansion to 
    the facility relative to the requirements set forth in 10 CFR Part 51. 
    Based on this assessment, the staff concludes that there is no 
    significant radiological or nonradiological impacts associated with the 
    proposed action and that the issuance of the proposed amendment to the 
    license will have no significant impact on the quality of the human 
    environment. Therefore, pursuant to 10 CFR 51.31, no environmental 
    impact statement needs to be prepared for this action.
        For further details with respect to this action, see (1) the 
    application for amendment to the TSs dated December 30, 1994, as 
    supplemented July 28, September 14, and November 29, 1995, and January 
    2, 1996, (2) the FGEIS on Handling and Storage of Spent Light Water 
    Power Reactor Fuel (NUREG-0575), (3) the Final Environmental Statement 
    for the CPSES, Units 1 and 2, dated October 1989, and (4) the 
    Environmental Assessment dated February 5, 1996.
        These documents are available for public inspection at the 
    Commission's Public Document Room, The Gelman Building, 2120 L Street, 
    NW., Washington, DC, and at the local public document room located at 
    the University of Texas at Arlington Library, Government Publications/
    Maps, 702 College, P. O. Box 19497, Arlington, Texas 76019.
    
        Dated at Rockville, Maryland, this 5th day of February 1996.
    
        For the Nuclear Regulatory Commission.
    William D. Beckner,
    Director, Project Directorate IV-1, Division of Reactor Projects III/
    IV, Office of Nuclear Reactor Regulation.
    [FR Doc. 96-2835 Filed 2-8-96; 8:45 am]
    BILLING CODE 7590-01-P
    
    

Document Information

Published:
02/09/1996
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
96-2835
Pages:
5042-5043 (2 pages)
Docket Numbers:
Docket Nos. 50-445 and 50-446
PDF File:
96-2835.pdf