2021-02584. Criteria for Development of Evacuation Time Estimate Studies (NUREG/CR-7002, Revision 1)
-
Start Preamble
Start Printed Page 8685
AGENCY:
Nuclear Regulatory Commission.
ACTION:
NUREG; issuance.
SUMMARY:
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to NUREG/CR-7002, “Criteria for Development of Evacuation Time Estimate Studies.” This revised NUREG provides guidance to meet NRC requirements for development of evacuation time estimates (ETEs) to support emergency planning. This revision reflects the importance of various ETE model parameters based on the results of an applied research study on ETEs. The format and criteria provided in this document will support consistent application of the ETE methodology and will facilitate consistent NRC review of ETE studies.
DATES:
NUREG/CR-7002, Revision 1 is available on February 9, 2021.
ADDRESSES:
Please refer to Docket ID NRC-2008-0122 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods:
- Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0122. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301-415-0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. NUREG/CR-7002, Rev. 1, “Criteria for Development of Evacuation Time Estimate Studies” is available in ADAMS under Accession No. ML21013A504.
- Attention: The PDR, where you may examine and order copies of public documents, is currently closed. You may submit your request to the PDR via email at pdr.resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8:00 a.m. and 4:00 p.m. (EST), Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Todd Smith, Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-287-3744, email: Todd.Smith@nrc.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Discussion
The ETE is a calculation of the time to evacuate the plume exposure pathway emergency planning zone (EPZ), an area around a nuclear power plant for which planning is needed to ensure that prompt and effective actions can be taken in the event of a radiological emergency. The ETE is primarily used to inform protective action strategies within the EPZ and may be used to assist in the development of traffic management plans to support an evacuation. In November 2011, the NRC issued NUREG/CR-7002, “Criteria for Development of Evacuation Time Estimate Studies” (ADAMS Accession No. ML113010515), as guidance to support compliance with ETE provisions added to the NRC's regulations in title 10 of the Code of Federal Regulations, part 50, appendix E, section IV, in a final rule issued on November 23, 2011 (76 FR 72560). The initial release of this guidance was based on previous advancements in the development of ETE modeling and knowledge gained through research of large scale evacuations and staged evacuations.
The revised NUREG/CR-7002 is based on an applied research study to examine, through modeling and simulation, technical subjects associated with the use of traffic simulation models for ETE studies, documented in NUREG/CR-7269, “Enhancing Guidance for Evacuation Time Estimate Studies” (ADAMS Accession No. ML20070M158). Specific areas of research included the impact of shadow evacuations, evacuation model boundary conditions, the use of manual traffic control, and the sensitivity of various model parameters important to ETE studies. The study provided a technical basis for revisions to NUREG/CR-7002 to reflect current practices in transportation modeling and an enhanced understanding of evacuation dynamics. The NRC's intent in revising NUREG/CR-7002 is to ensure consistency in the development and review of ETE studies.
II. Additional Information
Following development of the revised guidance, the NRC posted the draft NUREG/CR-7002, Rev. 1 to the Federal Rulemaking website at https://www.regulations.gov for a 45-day public comment period (85 FR 52930; August 27, 2020). The NRC held a public meeting on September 16, 2020, to discuss the scope of the proposed revisions. The comment period closed on October 13, 2020. In total, the NRC received, reviewed, and considered 10 comments during the development of this revision. Of the 10 comments, 7 were accepted (i.e., the NRC revised the draft guidance exactly as recommended), 2 were agreed to in part, and 1 comment was rejected. In all, nine comments resulted in revisions to the draft guidance. A detailed report on the comment resolutions, including the agency's rationales for each comment's disposition, will be available for review in ADAMS under Accession No. ML21007A043 and at https://www.regulations.gov/,, under Docket ID NRC-2008-0122, within 30 days after issuance of the final NUREG/CR-7002, Rev. 1. Additionally, in response to EPFAQ 2020-01 (ADAMS Accession No. ML20206L127), the NRC revised the draft guidance to clearly define the decennial period as it applies to the ETE updates required by 10 CFR part 50, appendix E, sections IV.5 and IV.6.Start Printed Page 8686
III. Backfitting, Forward Fitting, and Issue Finality
Issuance of NUREG/CR-7002, Rev. 1 does not constitute backfitting as defined in 10 CFR 50.109, “Backfitting,” and as described in NRC Management Directive (MD) 8.4, “Management of Backfitting, Forward Fitting, Issue Finality, and Information Requests”; affect issue finality of any approval issued under 10 CFR part 52, “Licenses, Certificates, and Approvals for Nuclear Power Plants”; or constitute forward fitting as defined in MD 8.4, because, as explained in NUREG/CR-7002, Rev. 1, licensees are not required to comply with the positions set forth in that document.
IV. Paperwork Reduction Act
NUREG/CR-7002, Rev. 1, does not contain any new or amended collections of information subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing collections of information were approved by the Office of Management and Budget, approval numbers 3150-0011 and 3150-0151.
V. Congressional Review Act
The NUREG/CR-7002, Rev. 1, is a rule as defined in the Congressional Review Act (5 U.S.C. 801-808). However, the Office of Management and Budget has not found it to be a major rule as defined in the Congressional Review Act.
Start SignatureDated: February 3, 2021.
For the Nuclear Regulatory Commission.
Mark D. Lombard,
Deputy Director, Office of Nuclear Security and Incident Response.
[FR Doc. 2021-02584 Filed 2-8-21; 8:45 am]
BILLING CODE 7590-01-P
Document Information
- Published:
- 02/09/2021
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Rule
- Action:
- NUREG; issuance.
- Document Number:
- 2021-02584
- Dates:
- NUREG/CR-7002, Revision 1 is available on February 9, 2021.
- Pages:
- 8685-8686 (2 pages)
- Docket Numbers:
- NRC-2008-0122
- PDF File:
- 2021-02584.pdf
- Supporting Documents:
- » SECY-11-0053, "Final Rule: Enhancements to Emergency Preparedness Regulations (10 CFR Part 50 and 10 CFR Part 52)" dated April 8, 2011
- » Slides Presented at the September 17, 2009 Public Meeting on the NRC Proposed Rule to Enhance Emergency Preparedness
- » Environmental Assessment for Final Rule - Emergency Preparedness
- » Draft NSIR/DPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear Power Plants
- » Draft NUREG/CR-7002, "Criteria for Development of Evacuation Time Estimate Studies"
- » SECY-11-0053 "Final Rule: Enhancements to Emergency Preparedness Regulations (10 CFR Part 50 and 10 CFR Part 52)"
- » Slides Presented at March 29, 2011 Public Meeting - Scope of On-Shift Staffing Analysis
- » E-mail from Kevin Leuer, Minnesota Homeland Security and Emergency Management on November 15, 2010 Public Meeting
- » E-mail from Kevin Leuer, Minnesota Homeland Security and Emergency Management on NRC Rulemaking Implementation Timeline
- » Memorandum from Patrick Mulligan, Department of Environmental Protection, State of New Jersey on the Public Meeting to Discuss Proposed Implementation Dates of the Draft Emergency Preparedness Final Rule
- CFR: (2)
- 10 CFR 50
- 10 CFR 52