[Federal Register Volume 61, Number 42 (Friday, March 1, 1996)]
[Notices]
[Pages 8050-8052]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4766]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP96-153-000]
Southern Natural Gas Company; Notice of Intent To Prepare an
Environmental Impact Statement for the Proposed North Alabama Pipeline
Project, Request for Comments on Environmental Issues, and Notice of
Public Scoping Meeting
February 26, 1996.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental impact statement (EIS) that
will discuss the environmental impacts of the construction and
operation of the facilities proposed in the North Alabama Pipeline
Project.\1\ This EIS will be used by the Commission in its decision-
making process to determine whether to approve the project.
\1\ Southern Natural Gas Company's application was filed with
the Commissioner under Section 7 of the Natural Gas Act and Part 157
of the Commission's regulations.
---------------------------------------------------------------------------
We are asking a number of Federal agencies to indicate whether they
wish
[[Page 8051]]
to cooperate with us in the preparation of the EIS. These agencies are
listed in appendix 1 and may choose to participate once they have
evaluated each proposal relative to their agencies'
responsibilities.\2\
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public Reference and Files Maintenance Branch, 888
First Street, NE, Room 2A, Washington, DC 20426 or call (202) 208-
1371. Copies of the appendices were sent to all those receiving this
notice in the mail.
---------------------------------------------------------------------------
Summary of the Proposed Project
Southern Natural Gas Company (Southern) wants to expand the
capacity of its facilities in Alabama to transport an additional 76,350
thousand cubic feet per day of natural gas to five local distribution
companies. Southern seeks authority to construct and operate:
About 105 miles of 16-inch-diameter pipeline in
Tuscaloosa, Fayette, Walker, Cullman, Morgan, and Madison Counties,
Alabama. The proposed pipeline would begin at a tie-in at Southern's
existing McConnells Compressor Station in Tuscaloosa County, Alabama,
and proceeds northeast to its termination in Madison County, Alabama;
Two new meter stations: Huntsville Meter Station and North
Alabama Gas District Meter Station, both located in Madison County,
Alabama;
About 8.5 miles of 12-inch-diameter lateral and the
Decatur Meter Station in Morgan County, Alabama;
One additional 1,600-horsepower (hp) compressor at
Southern's existing McConnells Compressor Station in Tuscaloosa County,
Alabama; and
One additional 4,700-hp compressor at Southern's recently
authorized Providence Compressor Station (approved by the Commission in
May 1995 in Docket No. CP95-505-000) in Tuscaloosa County, Alabama.
The general location of the project facilities are shown in
appendix 2.\3\
\3\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public Reference and Files Maintenance Branch, 888
First Street, N.E., Washington, D.C. 20426, or call (202) 208-1371.
Copies of the appendices were sent to all those receiving this
notice in the mail.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would require about 935
acres of land. Following construction, about 329 acres would be
maintained as new right-of-way. The remaining 606 acres of land would
be restored and allowed to revert to its former use.
Southern proposes to use a 70-foot-wide right-of-way in
nonagricultural areas; and a 90-foot-wide right-of-way in agricultural
areas. Southern proposes to maintain a 50-foot-wide permanent easement.
The EIS Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping''. The main goal of the scoping process is to
focus the analysis in the EIS on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EIS. All comments received
are considered during the preparation of the EIS. State and local
government representatives are encouraged to notify their constituents
of this proposed action and encourage them to comment on their areas of
concern.
The EIS will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and Soils
--Seismology and soil liquefaction.
--Hazardous waste.
--Effect of blasting.
--Topsoil/subsoil mixing.
--Soil compaction.
--Erosion control.
--Right-of-way restoration.
Water Resources
--Groundwater withdrawal and discharge to surrounding surface waters.
--Directional drilling of the Tennessee River.
--128 perennial waterbody crossings, including Sipsey Fork, Lost River,
and the North River.
--Effect on water quality and riparian resources.
Biological Resources
--Effect of pipeline construction and operation on wildlife and
fisheries habitat.
--Effect on federally threatened, endangered, or sensitive animal and
plant species and their habitats.
--Effect on forested wetlands and other wetland habitats.
Cultural Resources
--Effect on historic and prehistoric sites.
--Native American and tribal concerns.
Land Use
--Impact on Wheeler Wildlife Refuge and other areas of critical
environmental concern.
--Consistency with local land use plans and zoning.
--Impact on residences and recreation areas.
Air Quality and Noise
--Air quality and noise impacts associated with construction.
--Effect on local and regional air quality and local noise environment
as a result of operation of additional compression at the McConnells
and Providence Compressor Stations.
Reliability and Safety
--Assessment of hazards associated with natural gas pipelines.
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will result in the
publication of a Draft EIS which will be mailed to Federal, state, and
local agencies, public interest groups, interested individuals,
affected landowners, newspapers, libraries, and the Commission's
official service list for these proceedings. A 45-day comment period
will be allocated for the review of the Draft EIS. We will consider all
comments on the Draft EIS and revise the document, as necessary, before
issuing a Final EIS. The Final EIS will include our response to each
comment received.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Southern. Keep in mind that
this is a preliminary list:
Twenty-three federally listed endangered or threatened
species may occur in the proposed project area.
About 33 acres of forested wetlands would be affected.
About 128 perennial streams, several over 50 feet-wide,
would be crossed by the proposed project.
About 391 acres of upland forest would be affected.
The proposed pipeline crosses the Wheeler National
Wildlife Refuge (Tennessee River) from mileposts (MP) 107.81 to 108.72.
Nineteen residences are located within 50 feet of the
proposed construction right-of-way.
The list of issues may be added to, subtracted from, or changed
based on your comments and our analysis.
[[Page 8052]]
Two nonjurisdictional small-diameter pipeline laterals are
associated with this proposal. These laterals would service the
municipal of Decatur and Huntsville, Alabama. We have determined that
those facilities will be included in the environmental document.
Public Participation/Scoping Meeting
You can make a difference by sending a letter addressing your
specific comments or concerns about the project. You should focus on
the potential environmental effects of the proposal, alternatives to
the proposal (including alternative routes), and measures to avoid or
lessen environmental impact. The more specific your comments, the more
useful they will be. Please follow the instructions below to ensure
that your comments are received and properly recorded:
Address your letter to: Lois Cashell, Secretary, Federal
Energy Regulatory Commission, 888 First St., N.E., Washington, D.C.
20426;
Reference Docket No. CP96-153-000;
Send a copy of your letter to: Ms. Alisa Lykens, EIS
Project Manager, Federal Energy Regulatory Commission, 888 First St.,
N.E., PR 11.1, Washington, D.C. 20426; and
Mail your comments so that they will be received in
Washington, D.C. on or before April 5, 1996.
Beyond asking for written comments, we invite you to attend our
public scoping meeting that will be held on Monday, April 1, 1996 at
7:00 p.m., at the Sheraton Airport Inn, 1000 Glenn Hearn Blvd.,
Huntsville, Alabama 35824, (205) 772-9661.
The purpose of the scoping meeting is to obtain input from state
and local governments and from the public. Federal agencies have formal
channels for input into the Federal process (including separate
meetings where appropriate) on an interagency basis. Federal agencies
are expected to transmit their comments directly to the FERC and not
use the scoping meetings for this purpose.
Southern will be invited to present a description of its proposal
at the scoping meeting. Interested groups and individuals are
encouraged to attend the meeting and present oral comments on the
environmental issues which they believe should be addressed in the
Draft EIS. The more specific your comments, the more useful they will
be. Anyone who would like to make an oral presentation at the meeting
should contact the EIS Project Manager identified at the end of this
notice to have his or her name placed on the list of speakers. Priority
will be given to those persons representing groups. A list will be
available at the public meeting to allow for non-preregistered speakers
to sign up. A transcript will be made of the meeting and comments will
be used to help determine the scope of the Draft EIS.
Becoming an Intervenor
In addition to involvement in the EIS scoping process, you may want
to become an official party to the proceeding or become an
``intervenor''. Among other things, intervenors have the right to
receive copies of case-related Commission documents and filings by
other intervenors. Likewise, each intervenor must provide copies of its
filings to all other parties. If you want to become an intervenor you
must file a motion to intervene according to Rule 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.214) (see
appendix 3).
The date for filing timely motions to intervene in this proceeding
has passed. Therefore, parties now seeking to file late interventions
must show good cause, as required by Sec. 385.214(b)(3), why this time
limitation should be waived. Environmental issues have been viewed as
good cause for late intervention. You do not need intervenor status to
have your scoping comments considered.
Environmental Mailing List
This notice is being sent to individuals, organizations, and
government entities interested and/or potentially affected by the
proposed project. It is also being sent to all potential right-of-way
grantors to solicit focused comments regarding environmental
considerations related to the proposed project.\4\ As details of the
project become established, representatives of Southern will directly
contact landowners, communities, and public agencies concerning any
other matters, including acquisition of permits and rights-of-way.
\4\ Southern has supplied a preliminary landowner list. This
list is based on the ownership of the land containing the existing
right-of-way. A supplemental mailing will be made, if necessary,
after the route has been surveyed.
---------------------------------------------------------------------------
If you do not want to send comments at this time but still want to
keep informed and receive copies of the Draft and Final EISs, please
return the Information Request (appendix 4). If you do not return the
Information Request you will be taken off the mailing list.
Additional information about the proposed project is available from
Ms. Alisa Lykens, EIS Project Manager, at (202) 208-0766.
Lois D. Cashell,
Secretary.
[FR Doc. 96-4766 Filed 2-29-96; 8:45 am]
BILLING CODE 6717-01-M