DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-219-000]
Transcontinental Gas Pipe Line Corporation; Notice of Request
Under Blanket Authorization
February 23, 1999.
Take notice that on February 17, 1999, Transcontinental Gas Pipe
Line Corporation (Transco), P.O. Box 1396, Houston, Texas 77251, filed
in Docket No. CP99-219-000 a request pursuant to Sections 157.205 and
157.211 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205, 157.211) for authorization to construct, own and operate a
delivery point for Monroe Power Company (MPC), a new gas transportation
customer and provider of electricity and energy services in the
southeast United States, under Transco's blanket certificate issued in
Docket No. CP82-426-000, pursuant to Section 7 of the Natural Gas Act,
all as more fully set forth in the request that is on file with the
Commission and open to public inspection. This filing may be viewed on
the web at http://www.ferc.fed.us/online/rims.htm (please call (202)
208-2222 for assistance).
Transco states that the delivery point will consist of a 10-inch
valve tap assembly, approximately one mile of 10-inch pipeline lateral
from Transco's mainline tap to MPC's facility location, a meter station
with two 10-inch orifice meter tubes, and other appurtenant facilities.
Transco states the proposed delivery point will be installed at or near
milepost 1084.96 on its mainline near Station No. 125 in Walton County,
Georgia. Transco states that MPC will construct, or cause to be
constructed, appurtenant facilities to enable it to receive gas from
Transco at such point and move the gas to a new MPC peaking power
facility.
Transco states the new delivery point will be used by MPC to
receive up to 97,000 dekatherms of gas per day from Transco on a
capacity release, secondary firm or interruptible basis. Transco states
the gas delivered through the new delivery point will be used by MPC as
fuel for its peaking power facility. Transco states that MPC is not
currently a transportation customer of Transco, and that upon
completion of the delivery point Transco will commence transportation
service to MPC or its suppliers pursuant to Transco's Rate Schedules
FT, FT-R, or IT and Part 284(G) of the Commission's regulations.
Transco states the addition of the delivery point will have no
significant impact on its peak day or annual deliveries, and is not
prohibited by its FERC Gas Tariff.
Transco estimates the total costs of its proposed facilities to be
approximately $1,470,800.00, and states that MPC will reimburse Transco
for all costs associated with such facilities.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the Natural Gas Act.
David P. Boergers,
Secretary.