Take notice that the following filings have been made with the
Commission:
1. Northeast Utilities Service Co.
[Docket No. ER93-94-001]
Take notice that on February 16, 1994, Northeast Utilities Service
Company tendered for filing its compliance filing in the above-
referenced docket.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
2. Pacific Gas and Electric Co.
[Docket No. ER93-154-000]
Take notice that on February 17, 1994, Pacific Gas and Electric
Company (PG&E) supplemented its filing in this docket pursuant to FERC
Staff's February 8, 1994, request for additional information and
clarification for Agreement Nos. 14 and 27.
Copies of this filing have been served upon the parties on the
service list including the California Public Utilities Commission.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
3. Public Service Company of New Hampshire
[Docket No. ER93-417-001]
Take notice that on February 16, 1994, Public Service Company of
New Hampshire tendered for filing an amendment in the above-referenced
docket.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
4. Commonwealth Electric Co.
[Docket No. ER94-217-000]
Take notice that on Commonwealth Electric Company tendered for
filing an amendment in the above-referenced docket.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
5. Midwest Power Systems Inc.
[Docket No. ER94-351-000]
Take notice that on February 17, 1994, Midwest Power Systems Inc.
(MPSI) tendered for filing Amendment No. 1 to the filing of a
Transmission Wheeling Letter Agreement (Agreement) dated June 15, 1993,
between Waverly Light & Power (Waverly) and MPSI. This Agreement
provides a wheeling path over MPSI's 12.5 Kv distribution system for
the delivery of capacity and energy derived from a wind generator owned
and operated by Waverly to Waverly's municipal distribution system.
Amendment No. 1 contains additional support data and information.
MPSI states that copies of this filing were served on Waverly and
the Iowa Utilities Board.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
6. Portland General Electric Co.
[Docket No. ER94-408-000]
Take notice that on February 17, 1994, Portland General Electric
Company (PGE) tendered for filing a request for deferral of Commission
action for sixty (60) days in the above Docket, to allow Commission
staff to ask questions concerning the filed agreement, BPA Contract No.
DE-MS79-93BP94034.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
7. Niagara Mohawk Power Corp.
[Docket No. ER94-423-000]
Take notice that on February 23, 1994, Niagara Mohawk Power
Corporation tendered for filing an amendment in the above-referenced
docket.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
8. Montana Power Co.
[Docket No. ER94-579-000]
Take notice that on February 18, 1994, Montana Power Company
tendered for filing an amendment in the above-referenced docket.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
9. Pacific Gas and Electric Co.
[Docket No. ER94-976-000]
Take notice that on February 17, 1994, Pacific Gas and Electric
Company (PG&E) tendered for filing a Transmission Rate Schedule for
service provided to three member cities of the Northern California
Power Agency (NCPA)--Healdsburg, Lompoc and Santa Clara, California
(Cities)--for the period May through September, 1982. Filing of the
Transmission Service Agreement is required by a settlement agreement
between NCPA and PG&E concerning NCPA's power purchase from the Western
Area Power Administration at that time. Service under the Agreement is
required to fully implement that purchase and use of the power by
Cities.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
10. Consumers Power Co.
[Docket No. ER94-986-000]
Take notice that on February 24, 1994, Consumers Power Company
(Consumers) tendered for filing Operating Practice 9 relating to
reactive power control and compensation pursuant to the Coordinated
Operating Agreement dated November 6, 1981 between Consumers and the
Michigan South Central Power Agency.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
11. PacifiCorp
[Docket No. ER94-987-000]
Take notice that PacifiCorp, on February 24, 1994, tendered for
filing, in accordance with 18 CFR Part 35 of the Commission's Rules and
Regulations, Exhibit A (Revision No. 17, effective September 30, 1993)
to the February 25, 1976, Transmission Agreement (PacifiCorp Rate
Schedule FERC No. 123) between PacifiCorp and Tri-State Generation and
Transmission Association, Inc. (Tri-State).
Exhibit A specifies the projected maximum integrated demand in
Kilowatts which Tri-State desires to have transmitted to its respective
points of delivery by PacifiCorp.
PacifiCorp respectfully requests, pursuant to 18 CFR 35.11 of the
Commission's Rules and Regulations, that a waiver of prior notice be
granted and an effective date of September 30, 1993, be assigned to
Exhibit A, this date being consistent with the effective date shown on
Exhibit A.
Copies of this filing were supplied to the Wyoming Public Service
Commission.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
12. Arizona Public Service Co.
[Docket No. ER94-988-000]
Take notice that on February 24, 1994, Arizona Public Service
Company (APS) tendered for filing revised estimated load and contract/
maximum demand Exhibits applicable under the following rate schedules:
------------------------------------------------------------------------
APS-FPC/
FERC No. Customer Exhibit name
------------------------------------------------------------------------
52...... Tohono O'odham Utility Authority........ Exhibit 1.
82...... Plains Electric G&T Cooperative, Inc.... Exhibit B.
128..... Electrical District No. 7............... Exhibit ``II''.
------------------------------------------------------------------------
Current rate levels are unaffected, revenue levels are unchanged
from those currently on file with the Commission, and no other
significant change in service to these or any other customer results
from the revisions proposed herein. No new or modifications to existing
facilities are required as a result of these revisions.
A copy of this filing has been served on the above customers and
the Arizona Corporation Commission.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
13. New England Power Co.
[Docket No. ER94-989-000]
Take notice that on February 24, 1994, New England Power Company
(NEP) submitted for filing eight proposed power sales contracts, and an
amendment to an existing contract:
(1) System Power Sales Agreement dated November 10, 1993, with the
Taunton Municipal Light Plant;
(2) System Power Sales Agreement dated November 10, 1993, with the
Braintree Electric Light Department;
(3) System Power Sales Agreement dated November 10, 1993, with the
Littleton Electric Light Department;
(4) Unit Power Contract dated January 13, 1994, with the Town of Holden
Municipal Light Department;
(5) Unit Power Contract dated January 20, 1994, with the North
Attleboro Electric Department;
(6) Unit Power Contract dated January 11, 1994, with the Hingham
Municipal Light Plant;
(7) Unit Power Contract dated January 13, 1994, with the Groton
Electric Light Department;
(8) Unit Power Contract dated January 14, 1994, with the Middleton
Municipal Light Department; and
(9) First Amendment dated December 3, 1993, to System Power Sales
Agreement dated August 10, 1993, with the Shrewsbury Electric Light
Plant.
NEP states that the contracts are for system or unit power, ranging
in amount from 0.5 to 10 megawatts, for a term of from 10 to 30 years.
The contracts are part of a settlement of proceedings involving a coal-
fired cogeneration unit proposed to be constructed by the Newbay
Corporation. NEP further states that the revenue under the contracts
will not exceed the cost of the service provided.
Comment date: March 15, 1994, in accordance with Standard Paragraph
E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the