95-5997. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 60, Number 47 (Friday, March 10, 1995)]
    [Notices]
    [Page 13156]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-5997]
    
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-4721-1]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared February 6, 1995 Through 
    February 10, 1995 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 10, 1994 (59 
    FR 16807).
    
    Draft EISs
    
        ERP No. D-AFS-K65166-CA Rating EO2, Cottonwood Fire Restoration 
    Project, Implementation, Tahoe National Forest, Sierraville Ranger 
    District, Sierra County, CA.
        Summary: EPA expressed environmental objections over the potential 
    adverse impacts to soil productivity, hydrology, and water quality from 
    the proposed extensive use of ground-based logging systems, the 
    associated road creation, and proposed harvesting within the stream 
    management zones (SMZs). EPA suggested modifications to the preferred 
    alternative which would reduce the use of ground-based logging systems 
    in the most damaged or vulnerable watersheds, minimize entrance into 
    the sensitive SMZ areas, and implement riparian rehabilitation 
    activities and road obliterations as soon as possible.
        ERP No. D-COE-E32193-GA Rating EC2, Savannah Harbor Navigation 
    Project, Operation and Maintenance, Long Term Management Strategy 
    Study, Chatham County, GA and Jasper County, SC.
        Summary: EPA expressed environmental concerns over the long-term 
    environmental consequences of implementation of the management plan. 
    EPA requested additional information to more precisely define the 
    uncertainties associated with the proposed operational changes.
        ERP No. D-FRC-K02023-00 Rating EC2, Tuscarora Natural Gas Pipeline 
    Project, Construction and Operation, Right-of-Way Grant, Special-Use-
    Permit, NPDES Permit and COE Section 404 Permit, Lassen County, CA; 
    Washoe and Storey Counties, NV and Klamath County, OR.
        Summary: EPA expressed environmental concerns over the proposed 
    project, and requested additional information on impacts to air 
    quality, wetlands, and cultural resources.
        ERP No. D-IBR-K39037-CA Rating EC2, Cachuma Water Supply Project, 
    Implementation, Long-term Contract Renewal, Santa Ynez Valley, Bradbury 
    Dam, Santa Barbara, CA.
        Summary: EPA commented that the draft EIS present a good 
    examination of a wide range of alternative, but also expressed concern 
    that more information was needed regarding water conservation, 
    groundwater injections and socio-economic impacts.
        ERP No. D-NPS-K60100-AZ Rating EC2, Programmatic EIS--Juan Bautista 
    de Anza National Historic Trail Comprehensive Management Plan, 
    Implementation, several counties, AZ and CA.
        Summary: EPA expressed environmental concerns and requested that 
    the final EIS include a ``no action'' alternative analysis, a 
    conformity determination, analysis of potential trail carrying 
    capacity, and address issues related to environmental justice, 
    threatened and endangered species and wetlands.
        ERP No. D-NRC-K01008-00 Rating EO2, Crownpoint Uranium Solution 
    Mining Project, Construction and Operation, Leasing and Licensing, 
    McKinley County, NM.
        Summary: EPA expressed environmental objections to the proposed 
    project based on its proximity to domestic supply wells and residences 
    and insufficient hydrogeologic modelling and field testing to ensure a 
    completely closed system. Additional information is needed in the Final 
    Environmental Impact Statement (FEIS) regarding the results of 
    hydrogeologic modelling and field tests, including the potential for, 
    and environmental impacts of, contaminated groundwater migrating off-
    site as a results of injection activities; aquifer restoration; and 
    effects of drawdown of supply wells for the City of Crownpoint. The 
    final EIS should also include additional information on permitting, 
    spill response, management of sludge and process wastes, and 
    Radionuclude National Emissions Standards for Hazardous Air Pollutants.
        ERP No. DS-FAA-C51013-NJ Rating EC2, Expanded East Coast Plan, 
    Changes in Aircraft Flight Patterns over the State of New Jersey, 
    Updated Information, Implementation, NJ.
        Summary: EPA continued to have environmental concerns about the 
    noise impacts of the proposed project. Additional information is needed 
    to address the ``conflict points'' that were the basis for rejecting 
    the Ocean Routing Proposal, to characterize noise levels in specific 
    towns, and to justify the use of an unverified noise model.
    
        Dated: March 7, 1995.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 95-5997 Filed 3-9-95; 8:45 am]
    BILLING CODE 6560-50-U
    
    

Document Information

Published:
03/10/1995
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
95-5997
Pages:
13156-13156 (1 pages)
Docket Numbers:
ER-FRL-4721-1
PDF File:
95-5997.pdf