98-6008. Drawbridge Operating Regulation; Gulf Intracoastal Waterway, LA  

  • [Federal Register Volume 63, Number 46 (Tuesday, March 10, 1998)]
    [Proposed Rules]
    [Pages 11641-11642]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-6008]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD08-94-033, CGD08-95-011]
    
    
    Drawbridge Operating Regulation; Gulf Intracoastal Waterway, LA
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice; withdrawal of proposal rules.
    
    -----------------------------------------------------------------------
    
    [[Page 11642]]
    
    SUMMARY: The Coast Guard is withdrawing two notices of proposed 
    rulemaking to amend the regulation for the draw of the vertical lift 
    highway bridge across the Gulf Intracoastal Waterway, mile 35.6, west 
    of Harvey Locks, near Larose, Lafourche Parish, Louisiana. The proposed 
    rules did not meet the reasonable needs of navigation. The Coast Guard 
    is withdrawing the notices of proposed rulemaking and terminating these 
    rulemakings.
    
    DATES: The proposed rules are withdrawn effective March 10, 1998.
    
    ADDRESSES: Unless otherwise indicated, documents referred to in these 
    notices are available for inspection or copying at the office of the 
    Eighth Coast Guard District, Bridge Administration Branch, Hale Boggs 
    Federal Building, room 1313, 501 Magazine Street, New Orleans, 
    Louisiana 70130-3396 between 7 a.m. and 4 p.m., Monday through Friday, 
    except Federal holidays. The telephone number is (504) 589-2965. 
    Commander (ob) maintains the public docket for these proposed 
    rulemakings.
    
    FOR FURTHER INFORMATION CONTACT:
    Mr. David Frank, Bridge Administration Branch, Commander (ob), Eighth 
    Coast Guard District, 501 Magazine Street, New Orleans, Louisiana, 
    70130-3396, telephone number 504-589-2965.
    
    SUPPLEMENTARY INFORMATION: 
    
    Regulatory History
    
        On December 7, 1994, the Coast Guard published a notice of proposed 
    rulemaking (NPRM) in the Federal Register (59 FR 63068). The NPRM 
    proposed to change the regulation governing the operation of the 
    vertical lift span drawbridge across the Gulf Intracostal Waterway, 
    mile 35.6, at Larose, Lafourche Parish, Louisiana, to require that from 
    7 a.m. to 8:30 a.m. and from 4:30 p.m. to 6 p.m. Monday through Friday, 
    except Friday holidays, the draw of the bridge would remain closed to 
    navigation for passage of vehicular traffic during peak traffic 
    periods. At all other times the draw would open on signal for passage 
    of vessels. Presently, the draw is required to open on signal at all 
    times.
        The Coast Guard received 10 letters in response to the NPRM 
    objecting to the proposed rule. Many of the objectors who were 
    associated with the local school stated that the bridge would reopen 
    after an extended closure 30 minutes before the start of school 
    possibly affecting the ability of students to arrive at school on time. 
    The applicant was given an opportunity to address the objections. The 
    applicant modified their proposal and resubmitted a new request for a 
    proposed rule.
        Inadvertently, a second NPRM was published in the Federal Register 
    (60 FR 40139) on August 7, 1995, instead of a Supplementary Notice of 
    Proposed Rulemaking (SNPRM). Additionally, the original NPRM was never 
    withdrawn. The second NPRM proposed to change the regulation governing 
    the operation of the vertical lift span drawbridge across the Gulf 
    Intracoastal Waterway, mile 35.6, at Larose, Lafourche Parish, 
    Louisiana, to require that from 7 a.m. to 9 a.m. and from 4:30 p.m. to 
    6 p.m. Monday through Friday, except Federal holidays, the draw of the 
    bridge would remain closed to navigation for passage of vehicular 
    traffic during peak traffic periods. At all other times the draw would 
    open on signal for passage of vessels. Presently, the draw is required 
    to open on signal at all times.
        Two letters of objection were received in response to the second 
    NPRM. These objections were from waterway interests stating that the 
    closure would increase the risk of accidents by vessels having to wait 
    for bridge openings while vehicles have an alternate route across the 
    waterway. These concerns were forwarded to the applicant to attempt to 
    reach an acceptable solution. The applicant has not addressed the 
    concerns of these objectors or offered an alternative proposal.
        The Coast Guard is, therefore, withdrawing the notices of proposed 
    rulemaking and terminating further rulemaking on proposals (CGD08-94-
    033 and CGD08-95-011).
    
        Dated: February 18, 1998.
    T.W. Josiah,
    Rear Admiral, U.S. Coast Guard, Commander, Eighth Coast Guard District.
    [FR Doc. 98-6008 Filed 3-9-98; 8:45 am]
    BILLING CODE 4910-14-M
    
    
    

Document Information

Effective Date:
3/10/1998
Published:
03/10/1998
Department:
Coast Guard
Entry Type:
Proposed Rule
Action:
Notice; withdrawal of proposal rules.
Document Number:
98-6008
Dates:
The proposed rules are withdrawn effective March 10, 1998.
Pages:
11641-11642 (2 pages)
Docket Numbers:
CGD08-94-033, CGD08-95-011
PDF File:
98-6008.pdf
CFR: (1)
33 CFR 117