99-5899. Notice of Application Accepted for Filing and Request for Motions to Intervene and Protests  

  • [Federal Register Volume 64, Number 46 (Wednesday, March 10, 1999)]
    [Notices]
    [Pages 11862-11863]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-5899]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Accepted for Filing and Request for Motions 
    to Intervene and Protests
    
    March 4, 1999.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection.
        a. Type of Application: Preliminary Permit.
        b. Project No.: P-11671-000.
        c. Date filed: February 1, 1999.
        d. Applicant: Universal Electric Power Corp.
        e. Name of Project: Dashields Lock and Dam Project.
        f. Location: At the existing U.S. Army Corps of Engineers' 
    Dashields Lock and Dam on the Ohio River, hear the Town of Ambride, 
    Allegheny County, Pennsylvania.
        g. Filed Pursuant to: Federal Power Act 16 U.S.C. Secs. 791(a)-
    825(r).
        h. Applicant Contact: Mr. Ronald S. Feltenberger, Universal 
    Electric Power Corp., 1145 Highbrook Street, Akron, Ohio 44301, (330) 
    535-7115.
        i. FERC Contact: Ed Lee (202) 219-2808 or E-mail address at 
    [email protected]
        j. Comment Date: 60 days from the issuance date of this notice.
        k. Description of Project: The proposed project would utilize the 
    existing U.S. Army Corps of Engineers' Dashields Lock and Dam, and 
    would consist of the following facilities: (1) a new powerhouse to be 
    constructed on the downstream side of the dam having an installed 
    capacity of 22.5 megawatts; (2) a new 1.5-mile-long, 14.7-kilovolt 
    transmission line; and (3) appurtenant facilities. The proposed average 
    annual generation is estimated to be 142 gigawatthours. The cost of the 
    studies under the permit will not exceed $2,600,000.
        l. This notice also consists of the following standard paragraphs: 
    A5, A7, A9, A10, B, C, and D2.
        m. Available Locations of Application: A copy of the application is 
    available for inspection and reproduction at the Commission's Public 
    Reference and Files Maintenance Branch, located at 888 North Capitol 
    Street, N.E., Room 2-A, Washington, D.C. 20426, or by calling (202) 
    208-1371. A copy is also available for inspection and reproduction at 
    Universal Electric Power Corp., Mr. Ronald S. Feltenberger, 1145 
    Highbrook Street, Akron, Ohio 44301, (330) 535-7115. A copy of the 
    application may also be viewed or printed by accessing the Commission's 
    website on the Internet at http://www.ferc.fed.us/online/rims.htm or 
    call (202) 208-2222 for assistance.
        A5. Preliminary Permit--Anyone desiring to file a competing 
    application for preliminary permit for a proposed project must submit 
    the competing application itself, or a notice of intent to file such an 
    application, to the Commission on or before the specified comment date 
    for the particular application (see 18 CFR 4.36). Submission of a 
    timely notice of intent allows an interested person to file the 
    competing preliminary permit application no later than 30 days after 
    the specified comment date for the particular application. A competing 
    preliminary permit application must conform with 18 CFR 4.30(b) and 
    4.36.
        A7. Preliminary Permit--Any qualified development applicant 
    desiring to file a competing development application must submit to the 
    Commission, on or before a specified comment date for the particular 
    application, either a competing development application or a notice of 
    intent to file such an application. Submission of a timely notice of 
    intent to file a development application allows an interested person to 
    file the competing application no later than 120 days after the 
    specified comment date for the particular application. A competing 
    license application must conform with 18 CFR 4.30(b) and 4.36.
        A9. Notice of intent--A notice of intent must specify the exact 
    name, business address, and telephone number of the prospective 
    applicant, and must include an unequivocal statement of intent to 
    submit, if such an application may be filed, either a preliminary 
    permit application or a development application (specify which type of 
    application). A notice of intent must be served on the applicant(s) 
    named in this public notice.
        A10. Proposed Scope of Studies under Permit--A preliminary permit, 
    if issued, does not authorize construction. The term of the proposed 
    preliminary permit would be 36 months. The work proposed under the 
    preliminary permit would include economic analysis, preparation of 
    preliminary engineering
    
    [[Page 11863]]
    
    plans, and a study of environmental impacts. Based on the results of 
    these studies, the Applicant would decide whether to proceed with the 
    preparation of a development application to construct and operate the 
    project.
        B. Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
    .214. In determining the appropriate action to take, the Commission 
    will consider all protests or other comments filed, but only those who 
    file a motion to intervene in accordance with the Commission's Rules 
    may become a party to the proceeding. Any comments, protests, or 
    motions to intervene must be received on or before the specified 
    comment date for the particular application.
        C. Filing and Service of Responsive Documents--Any filings must 
    bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT 
    TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', 
    ``PROTEST'', ``MOTION TO INTERVENE'', as applicable, and the Project 
    Number of the particular application to which the filing refers. Any of 
    the above-named documents must be filed by providing the original and 
    the number of copies provided by the Commission's regulations to: The 
    Secretary, Federal Energy Regulatory Commission, 888 First Street, 
    N.E., Washington, D.C. 20426. An additional copy must be sent to 
    Director, Division of Project Review, Federal Energy Regulatory 
    Commission, at the above-mentioned address. A copy of any notice of 
    intent, competing application or motion to intervene must also be 
    served upon each representative of the Applicant specified in the 
    particular application.
        D2. Agency Comments--Federal, state, and local agencies are invited 
    to file comments on the described application. A copy of the 
    application may be obtained by agencies directly from the Applicant. If 
    an agency does not file comments within the time specified for filing 
    comments, it will be presumed to have no comments. One copy of an 
    agency's comments must also be sent to the Applicant's representatives.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-5899 Filed 3-9-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
03/10/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-5899
Dates:
60 days from the issuance date of this notice.
Pages:
11862-11863 (2 pages)
PDF File:
99-5899.pdf