[Federal Register Volume 64, Number 46 (Wednesday, March 10, 1999)]
[Notices]
[Pages 11863-11864]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-5900]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting
Comments, Motions To Intervene, and Protests
March 4, 1999.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 11685-000.
c. Date Filed: February 22, 1999.
d. Applicant: The Stockport Mill Country Inn.
e. Name of Project: Stockport Mill Country Inn Hydroelectric
Project.
f. Location: On the Muskingum River, near the town of Stockport, in
Morgan County, Ohio.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Laura Smith, The Stockport Mill Country Inn,
P.O. Box 478, 1995 Broadway Ave., Stockport, Ohio 43787-0478, (740)
559-2822.
i. FERC Contact: Any questions on this notice should be addressed
to Tom Dean, E-mail address, thomas.dean@ferc.fed.us, or telephone 202-
219-2778.
j. Deadline for filing comments, motions to intervene, and
protests: 60 days from the issuance date of this notice.
k. Competing Application: Project No. 11648; Date Filed: December
10, 1998; Due Date: March 15, 1999.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The Commission's Rules of Practice and Procedures require all
intervenors filing documents with the Commission to serve a copy of the
document on each person whose name appears on the official service list
for the project. Further, if an intervenor files comments or documents
with the Commission relating to the merits of an issue that affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
l. Description of the Project: The project would consist of the
following facilities: (1) the existing 20-foot-high, 482-foot-long
Muskingum Lock and Dam No. 6; (2) an existing 476-acre reservoir at
normal pool elevation of 640.01 feet msl; (3) an existing forebay; (4)
an existing turbine pit housing two proposed turbine generating units
with a total installed capacity of 250 kW; and (5) other appurtenances.
The lock and dam is owned by the Ohio Department of Natural Resources,
Division of Parks and Recreation.
Applicant estimates that the average annual generation would be
1,500 MWh and that the cost of the studies under the permit would be
$10,000.
m. Locations of the application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE, Room 2A, Washington,
DC 20426, or by calling (202) 208-1371. This filing may be viewed on
the web at http://www.ferc.fed.us/online/rims.htm (call 202-208-2222
for assistance). A copy is also available for inspection and
reproduction at the address in item h above.
n. This notice also consists of the following standard paragraphs:
A8, A10, B, C, and D2.
A8. Preliminary Permit--Public notice of the filing of the initial
preliminary permit application, which has already been given,
established the due date for filing competing preliminary permit
applications or notices of intent. Any competing preliminary permit or
development application or notice of intent to file a competing
preliminary permit or development application must be filed in response
to and in compliance with the public notice of the initial preliminary
permit application. No competing applications or notices of intent to
file competing applications may be filed in response to this notice. A
competing license application must conform with 18 CFR 4.30(b) and
4.36.
A10. Proposed Scope of Studies under Permit--A preliminary permit,
if issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
B. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but
[[Page 11864]]
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
C. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', ``MOTION TO INTERVENE'', as applicable, and the Project
Number of the particular application to which the filing refers. Any of
the above-named documents must be filed by providing the original and
the number of copies provided by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE,
Washington, DC 20426. An additional copy must be sent to Director,
Division of Project Review, Federal Energy Regulatory Commission, at
the above-mentioned address. A copy of any notice of intent, competing
application or motion to intervene must also be served upon each
representative of the Applicant specified in the particular
application.
D2. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
David P. Boergers,
Secretary.
[FR Doc. 99-5900 Filed 3-9-99; 8:45 am]