99-5900. Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests  

  • [Federal Register Volume 64, Number 46 (Wednesday, March 10, 1999)]
    [Notices]
    [Pages 11863-11864]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-5900]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Accepted for Filing and Soliciting 
    Comments, Motions To Intervene, and Protests
    
    March 4, 1999.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Preliminary Permit.
        b. Project No.: 11685-000.
        c. Date Filed: February 22, 1999.
        d. Applicant: The Stockport Mill Country Inn.
        e. Name of Project: Stockport Mill Country Inn Hydroelectric 
    Project.
        f. Location: On the Muskingum River, near the town of Stockport, in 
    Morgan County, Ohio.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Laura Smith, The Stockport Mill Country Inn, 
    P.O. Box 478, 1995 Broadway Ave., Stockport, Ohio 43787-0478, (740) 
    559-2822.
        i. FERC Contact: Any questions on this notice should be addressed 
    to Tom Dean, E-mail address, thomas.dean@ferc.fed.us, or telephone 202-
    219-2778.
        j. Deadline for filing comments, motions to intervene, and 
    protests: 60 days from the issuance date of this notice.
        k. Competing Application: Project No. 11648; Date Filed: December 
    10, 1998; Due Date: March 15, 1999.
        All documents (original and eight copies) should be filed with: 
    David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
    First Street, NE, Washington, DC 20426.
        The Commission's Rules of Practice and Procedures require all 
    intervenors filing documents with the Commission to serve a copy of the 
    document on each person whose name appears on the official service list 
    for the project. Further, if an intervenor files comments or documents 
    with the Commission relating to the merits of an issue that affect the 
    responsibilities of a particular resource agency, they must also serve 
    a copy of the document on that resource agency.
        l. Description of the Project: The project would consist of the 
    following facilities: (1) the existing 20-foot-high, 482-foot-long 
    Muskingum Lock and Dam No. 6; (2) an existing 476-acre reservoir at 
    normal pool elevation of 640.01 feet msl; (3) an existing forebay; (4) 
    an existing turbine pit housing two proposed turbine generating units 
    with a total installed capacity of 250 kW; and (5) other appurtenances. 
    The lock and dam is owned by the Ohio Department of Natural Resources, 
    Division of Parks and Recreation.
        Applicant estimates that the average annual generation would be 
    1,500 MWh and that the cost of the studies under the permit would be 
    $10,000.
        m. Locations of the application: A copy of the application is 
    available for inspection and reproduction at the Commission's Public 
    Reference Room, located at 888 First Street, NE, Room 2A, Washington, 
    DC 20426, or by calling (202) 208-1371. This filing may be viewed on 
    the web at http://www.ferc.fed.us/online/rims.htm (call 202-208-2222 
    for assistance). A copy is also available for inspection and 
    reproduction at the address in item h above.
        n. This notice also consists of the following standard paragraphs: 
    A8, A10, B, C, and D2.
        A8. Preliminary Permit--Public notice of the filing of the initial 
    preliminary permit application, which has already been given, 
    established the due date for filing competing preliminary permit 
    applications or notices of intent. Any competing preliminary permit or 
    development application or notice of intent to file a competing 
    preliminary permit or development application must be filed in response 
    to and in compliance with the public notice of the initial preliminary 
    permit application. No competing applications or notices of intent to 
    file competing applications may be filed in response to this notice. A 
    competing license application must conform with 18 CFR 4.30(b) and 
    4.36.
        A10. Proposed Scope of Studies under Permit--A preliminary permit, 
    if issued, does not authorize construction. The term of the proposed 
    preliminary permit would be 36 months. The work proposed under the 
    preliminary permit would include economic analysis, preparation of 
    preliminary engineering plans, and a study of environmental impacts. 
    Based on the results of these studies, the Applicant would decide 
    whether to proceed with the preparation of a development application to 
    construct and operate the project.
        B. Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
    .214. In determining the appropriate action to take, the Commission 
    will consider all protests or other comments filed, but
    
    [[Page 11864]]
    
    only those who file a motion to intervene in accordance with the 
    Commission's Rules may become a party to the proceeding. Any comments, 
    protests, or motions to intervene must be received on or before the 
    specified comment date for the particular application.
        C. Filing and Service of Responsive Documents--Any filings must 
    bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT 
    TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', 
    ``PROTEST'', ``MOTION TO INTERVENE'', as applicable, and the Project 
    Number of the particular application to which the filing refers. Any of 
    the above-named documents must be filed by providing the original and 
    the number of copies provided by the Commission's regulations to: The 
    Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, 
    Washington, DC 20426. An additional copy must be sent to Director, 
    Division of Project Review, Federal Energy Regulatory Commission, at 
    the above-mentioned address. A copy of any notice of intent, competing 
    application or motion to intervene must also be served upon each 
    representative of the Applicant specified in the particular 
    application.
        D2. Agency Comments--Federal, state, and local agencies are invited 
    to file comments on the described application. A copy of the 
    application may be obtained by agencies directly from the Applicant. If 
    an agency does not file comments within the time specified for filing 
    comments, it will be presumed to have no comments. One copy of an 
    agency's comments must also be sent to the Applicant's representatives.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-5900 Filed 3-9-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Effective Date:
3/15/1999
Published:
03/10/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-5900
Dates:
March 15, 1999.
Pages:
11863-11864 (2 pages)
PDF File: