[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Notices]
[Page 9688]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5636]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. TM96-2-33-000]
El Paso Natural Gas Company; Notice of Proposed Changes in FERC
Gas Tariff
March 5, 1996.
Take notice that on March 1, 1996, El Paso Natural Gas Company (El
Paso), tendered for filing as part of its FERC Gas Tariff, the
following tariff sheets, to become effective April 1, 1996.
Second Revised Volume No. 1-A
Sixth Revised Sheet Nos. 20 and 23
Seventh Revised Sheet No. 24
Sixth Revised Sheet No. 26
Fifth Revised Sheet Nos. 27-28
Third Revised Volume No. 1
Fourth Revised Sheet No. 101
Third Revised Volume No. 2
Thirty-Seventh Revised Sheet No. 1-D.2
Thirtieth Revised Sheet No. 1-D.3
El Paso is also tendering for filing as part of its FERC Gas
Tariff, Volume Nos. 1-A, 1, and 2, the following tariff sheets, to
become effective May 1, 1996.
Second Revised Volume No. 1-A
Seventh Revised Sheet Nos. 20 and 23
Eighth Revised Sheet No. 24
Seventh Revised Sheet No. 26
Sixth Revised Sheet Nos. 27-28
Third Revised Volume No. 2
Thirty-Eighth Revised Sheet No. 1-D.2
Thirty-First Revised Sheet No. 1-D.3
El Paso states that the tendered tariff sheets proposed to become
effective April 1, 1996, reflect an adjustment to its take-or-pay
Throughput Surcharge to reflect an adjustment for the difference
between previously estimated interest and actual interest and to add
actual interest for February and March 1996.
As a result, the Throughput Surcharge has decreased $0.0439 per
dth, from $0.0461 to $ 0.0022 per dth.
El Paso states that the tendered tariff sheets proposed to become
effective May 1, 1996, will remove the Throughput Surcharge from the
applicable Statement of Rates sheets in its Tariff after the completion
of the take-or-pay cost recovery on April 30, 1996. El Paso has
requested waiver of the requirements of Section 154.207 of the
Commission's Regulations to accept the tendered tariff sheets with a
proposed May 1, 1996, effective date and permit them to become
effective on that date, which is 61 days following the date of the
filing.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in
accordance with Sections 385.214 and 385.211 of the Commission's Rules
and Regulations. All such motions or protests must be filed as provided
in Section 154.210 of the Commission's Regulations. Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of this filing are on file with the Commission and
are available for public inspection in the Public Reference Room.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 96-5636 Filed 3-8-96; 8:45 am]
BILLING CODE 6717-01-M