98-6257. Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Edison Company; Notice of Filing  

  • [Federal Register Volume 63, Number 47 (Wednesday, March 11, 1998)]
    [Notices]
    [Page 11886]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-6257]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket Nos. EC96-19-018 and ER96-1663-019]
    
    
    Pacific Gas and Electric Company, San Diego Gas & Electric 
    Company, and Southern California Edison Company; Notice of Filing
    
    March 4, 1998.
        Take notice that on March 3, 1998, the California Independent 
    System Operator Corporation (ISO), filed for Commission acceptance in 
    these dockets, pursuant to Section 205 of the Federal Power Act, an 
    application to amend the ISO Tariff, including the ISO Protocols (ISO 
    Tariff), by adding new Sections 21 and 22 (Amendment No. 5), and a 
    motion for waiver of the 60-day notice requirement. The ISO requests 
    that the Amendment No. 5, be accepted for filing and be made effective 
    as of the ISO Operations Date, which will no later than March 31, 1998.
        The ISO states that the ISO Tariff Sections 21 and 22 would defer, 
    for a brief period of time, certain functions contemplated by the ISO 
    Tariff. Specifically, Section 21 would set the Generation Meter 
    Multiplier at 1.0 for scheduling purposes. Section 22 would increase 
    the schedule validation tolerance from 1 MW to 20 MW. The ISO also 
    requests the Commission allow the reinstatement of the deferred 
    functions upon seven days notice (via posting on the ISO's Home Page 
    and submission of such notices to the Commission), by pre-approving the 
    termination of proposed Sections 21 and 22.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before March 16, 1998. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-6257 Filed 3-10-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
03/11/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-6257
Pages:
11886-11886 (1 pages)
Docket Numbers:
Docket Nos. EC96-19-018 and ER96-1663-019
PDF File:
98-6257.pdf