98-6376. EAL/ERI Cogeneration Partners, L.P., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 48 (Thursday, March 12, 1998)]
    [Notices]
    [Pages 12087-12091]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-6376]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG98-35-000, et al.]
    
    
    EAL/ERI Cogeneration Partners, L.P., et al.; Electric Rate and 
    Corporate Regulation Filings
    
    March 5, 1998.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. EAL/ERI Cogeneration Partners, L.P.
    
    [Docket No. EG98-35-000]
    
        On March 2, 1998, EAL/ERI Cogeneration Partners, L.P. (EECLP), with 
    its address c/o ERI Services, Inc., 255 Main Street, Suite 500, 
    Hartford, CT 06106, filed with the Federal Energy Regulatory Commission 
    (FERC or the Commission) an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    Regulations.
        EECLP is a Delaware limited partnership that will be engaged 
    directly and exclusively in the business of developing, owning and 
    operating an eligible facility to be located in Jamaica. The eligible 
    facility will consist of an approximately 16 MW diesel-fired electric 
    generation project and related interconnection facilities. The output 
    of the eligible facility will be sold at wholesale and at retail to 
    consumers located outside of the United States.
        Comment date: March 26, 1998, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. CMS Generation Operating Company II, Inc.
    
    [Docket No. EG98-47-000]
    
        On February 26, 1998, CMS Generation Operating Company II, Inc., 
    330 Town Center Drive, Suite 1000, Dearborn, Michigan 48126, filed with 
    the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to Part 365 
    of the Commission's Regulations.
        CMS Generation Operating Company II, Inc. is a wholly-owned 
    indirect subsidiary of CMS Generation Co., a Michigan corporation, 
    which is a wholly-owned indirect subsidiary of CMS Energy Corporation, 
    also a Michigan corporation. CMS Generation Operating Company II, Inc., 
    operates, under an operations and maintenance agreement with the owner, 
    a facility with a maximum capacity of approximately 238 MW located in 
    Lakewood Township, New Jersey.
        Comment date: March 26, 1998, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    3. PG&E Energy Trading-Power, L.P.
    
    [Docket No. ER95-1625-013]
    
        On March 3, 1998, PG&E Energy Trading-Power, L.P. (PGET) (formerly 
    USGen Power Services, L.P.), 7500 Old Georgetown Road, Bethesda, 
    Maryland 20814, filed a Notification of Change in Status relating to 
    prospective sales at wholesale to entities located within the 
    franchised service territory of PGET's affiliate, Pacific Gas and 
    Electric Company.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    4. TransCanada Energy Ltd.
    
    [Docket Nos. ER95-692-012 and ER97-1417-000]
    
        On March 3, 1998, TransCanada Energy Ltd.(TCE), filed a 
    notification of a change in status to reflect certain departures from 
    the facts the Commission relied upon in granting market-based rate 
    authority.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    [[Page 12088]]
    
    5. Pennsylvania-New Jersey-Maryland Interconnection
    
    [Docket No. ER97-3189-003]
    
        Take notice that on March 2, 1998, Delmarva Power & Light Company 
    (Delmarva), filed in compliance with the Commission's January 29, 1998 
    Order, revised network tariff service rates based on the annual peak 
    which the Commission directed the PJM Companies to file consistent with 
    the use of such peaks for the allocation of fixed transmission rights. 
    Delmarva requests that this compliance filing be allowed to become 
    effective on April 1, 1998.
        Comment date: March 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    6. Boston Edison Company
    
    [Docket Nos. ER98-524-001 and ER98-616-001]
    
        Take notice that on February 17, 1998, Boston Edison Company 
    tendered for filing its compliance filing in the above-referenced 
    docket. In addition, on February 20, 1998, Boston Edison tendered for 
    filing supplemental information to its February 17, 1998, filing in the 
    above-referenced dockets.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Southwestern Public Service Company
    
    [Docket No. ER98-896-001]
    
        Take notice that on March 3, 1998, Southwestern Public Service 
    Company submitted its compliance filing as required by the January 30, 
    1998, Order.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. Atlantic City Electric Company
    
    [Docket No. ER98-1721-000]
    
        Take notice that on February 9, 1998, Atlantic City Electric 
    Company submitted an amended filing in this proceeding.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. Vermont Electric Power Company, Inc.
    
    [Docket No. ER98-1832-000]
    
        Take notice that on February 24, 1998, Vermont Electric Power 
    Company, Inc., submitted a supplement to its filing in this proceeding, 
    consisting of a fully executed copy of an earlier-filed service 
    agreement with Cinergy Capital & Trading, Inc.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. National Gas & Electric, L.P.
    
    [Docket No. ER98-1972-000]
    
        Take notice that on February 18, 1998, National Gas & Electric, 
    L.P. (NG&E), hereby notifies the Commission that it is changing its 
    name to PanCanadian Energy Services, L.P.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    11. LG&E Energy Marketing Inc.
    
    [Docket No. ER98-1981-000]
    
        Take notice that on February 20, 1998, LG&E Energy Marketing Inc. 
    (LEM), submitted for filing, pursuant to Section 205 of the Federal 
    Power Act, and Part 35 of the Commission's Regulations, an Application 
    for Authorization to Amend Market-Based Rate Schedule.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    12. Union Electric Company
    
    [Docket No. ER98-1973-000]
    
        Take notice that on February 19, 1998, Union Electric Company (UE), 
    tendered for filing a Revised Appendix T to the Service Agreement for 
    Market Based Rate Power Sales between UE and the City of Columbia, 
    Missouri. UE asserts that the purpose of the Revised Appendix T is to 
    replace the obsolete transmission rates under the Union Electric Open 
    Access Tariff with the current rates under the Ameren Open Access 
    Tariff.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    13. Niagara Mohawk Power Corporation
    
    [Docket No. ER98-1982-000]
    
        Take notice that on February 23, 1998, Niagara Mohawk Power 
    Corporation (NMPC), tendered for filing with the Federal Energy 
    Regulatory Commission an executed Transmission Service Agreement 
    between NMPC and American Electric Power Service Corporation (AEPSC). 
    This Transmission Service Agreement specifies that American Electric 
    Power Service Corporation has signed on to and has agreed to the terms 
    and conditions of NMPC's Open Access Transmission Tariff as filed in 
    Docket No. OA96-194-000. This Tariff, filed with FERC on July 9, 1996, 
    will allow NMPC and American Electric Power Service Corporation to 
    enter into separately scheduled transactions under which NMPC will 
    provide transmission service for American Electric Power Service 
    Corporation as the parties may mutually agree.
        NMPC requests an effective date of February 18, 1998. NMPC has 
    requested waiver of the notice requirements for good cause shown.
        NMPC has served copies of the filing upon the New York State Public 
    Service Commission and American Electric Power Service Corporation.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    14. Cinergy Services, Inc.
    
    [Docket No. ER98-1983-000]
    
        Take notice that on February 23, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff), entered into between 
    Cinergy and OGE Energy Resources, Inc., (OGE).
        Cinergy and OGE are requesting an effective date of February 15, 
    1998.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    15. Washington Water Power
    
    [Docket No. ER98-1984-000]
    
        Take notice that on February 24, 1998, Washington Water Power, 
    tendered for filing with the Federal Energy Regulatory Commission, 
    pursuant to 18 CFR 35.13, an executed Service Agreement under WWP's 
    FERC Electric Tariff First Revised Volume No. 9, with City of Idaho 
    Falls. WWP requests waiver of the prior notice requirement and requests 
    an effective date of February 1, 1998.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    16. FirstEnergy System
    
    [Docket No. ER98-1986-000]
    
        Take notice that on February 24, 1998, FirstEnergy System filed 
    Service Agreements to provide Non-firm Point-to-Point Transmission 
    Service for Amoco Energy Trading Corporation, Florida Power 
    Corporation, and LG&E Energy Marketing, Incorporated, the Transmission 
    Customers. Services are being provided under the FirstEnergy System 
    Open Access Transmission Tariff submitted for filing by the Federal 
    Energy Regulatory Commission in Docket No. ER97-412-000. The proposed 
    effective dates under the Service Agreements is February 1, 1998.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    [[Page 12089]]
    
    17. FirstEnergy System
    
    [Docket No. ER98-1987-000]
    
        Take notice that on February 24, 1998, FirstEnergy System filed 
    Service Agreement to provide Firm Point-to-Point Transmission Service 
    for Pennsylvania Power & Light, Incorporated, the Transmission 
    Customer. Services are being provided under the FirstEnergy System Open 
    Access Transmission Tariff submitted for filing by the Federal Energy 
    Regulatory Commission in Docket No. ER97-412-000. The proposed 
    effective dates under the Service Agreements is February 1, 1998.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    18. New England Power Company
    
    [Docket No. ER98-1988-000]
    
        Take notice that on February 24, 1998, New England Power Company 
    filed amendments to exhibits and attachments to its Network Integration 
    Transmission Service Agreements for service to Massachusetts Electric 
    Company and Nantucket Electric Company and to The Narragansett Electric 
    Company.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    19. MidAmerican Energy Company
    
    [Docket No. ER98-1989-000]
    
        Take notice that on February 24, 1998, MidAmerican Energy Company 
    (MidAmerican), 666 Grand Avenue, Des Moines, Iowa 50303 submitted for 
    filing with the Commission a Service Agreement dated December 19, 1997, 
    with The Cincinnati Gas & Electric Company, PSI Energy, Inc., and 
    Cinergy Services, Inc., entered into pursuant to MidAmerican's Rate 
    Schedule for Power Sales, FERC Electric Tariff, Original Volume No. 5 
    (Tariff).
        MidAmerican requests an effective date of February 1, 1998, for 
    this Agreement, and accordingly seeks a waiver of the Commission's 
    notice requirement. MidAmerican has served a copy of the filing on 
    Cinergy Services, Inc., agent for The Cincinnati Gas & Electric Company 
    and PSI Energy, Inc., the Iowa Utilities Board, the Illinois Commerce 
    Commission and the South Dakota Public Utilities Commission.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    20. Ameren Services Company
    
    [Docket No. ER98-1990-000]
    
        Take notice that on February 24, 1998, Ameren Services Company 
    (Ameren Services), tendered for filing a Network Operating Agreement 
    and a Service Agreement for Network Integration Transmission Service 
    between Ameren Services and the City of Centralia, Missouri. Ameren 
    Services asserts that the purpose of the Agreements is to permit Ameren 
    Services to provide transmission service to the City pursuant to 
    Ameren's Open Access Transmission Tariff.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    21. Union Electric Company
    
    [Docket No. ER98-1991-000]
    
        Take notice that on February 24, 1998, Union Electric Company (UE), 
    tendered for filing a Service Agreement for Market Based Rate Power 
    Sales between UE and the City of Centralia, Missouri (the City). UE 
    asserts that the purpose of the Agreement is to permit UE to make sales 
    of capacity and energy at market based rates to the City pursuant to 
    UE's Market Based Rate Power Sales Tariff filed in Docket No. ER97-
    3664-000.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    22. Central Illinois Light Company
    
    [Docket No. ER98-1993-000]
    
        Take notice that on February 24, 1998, Central Illinois Light 
    Company (CILCO), 300 Liberty Street, Peoria, Illinois 61202, tendered 
    for filing with the Commission a substitute Index of Customers under 
    its Coordination Sales Tariff and one service agreement for one new 
    customer, Koch Energy Trading, Inc.
        CILCO requested an effective date of February 13, 1998.
        Copies of the filing were served on the affected customer and the 
    Illinois Commerce Commission.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    23. Carolina Power & Light Company
    
    [Docket No. ER98-1994-000]
    
        Take notice that on February 25, 1998, Carolina Power & Light 
    Company (CP&L), tendered for filing a Service Agreement for Non-Firm 
    Point-to-Point Transmission Service executed between CP&L and the 
    Eligible Transmission Customer (Engage Energy US, L.P.). Service to the 
    Eligible Customer will be in accordance with the terms and conditions 
    of Carolina Power & Light Company's Open Access Transmission Tariff.
        Copies of the filing were served upon the North Carolina Utilities 
    Commission and the South Carolina Public Service Commission.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    24. UtiliCorp United Inc.
    
    [Docket No. ER98-1995-000]
    
        Take notice that on February 25, 1998, UtiliCorp United Inc., 
    tendered for filing on behalf of its operating division, WestPlains 
    Energy-Kansas, a Service Agreement under its Power Sales Tariff, FERC 
    Electric Tariff Original Volume No. 12, with Energy Transfer Group, 
    L.L.C. The Service Agreement provides for the sale of capacity and 
    energy by WestPlains Energy-Kansas to Energy Transfer Group, L.L.C., 
    pursuant to the tariff, and for the sale of capacity and energy by 
    Energy Transfer Group, L.L.C., to WestPlains Energy-Kansas pursuant to 
    Energy Transfer Group, L.L.C.''s Rate Schedule No. 1.
        UtiliCorp also has tendered for filing a Certificate of Concurrence 
    by Energy Transfer Group, L.L.C.
        UtiliCorp requests waiver of the Commission's Regulations to permit 
    the Service Agreement to become effective in accordance with its terms.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    25. Allegheny Power Service Corp., et al.
    
    [Docket No. ER98-2043-000]
    
        Take notice that on March 3, 1998, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing a revised Notice of 
    Withdrawal from the GAPP Experiment Participation Agreement 
    (Agreement).
        Copies of filing have been provided to each of the signatories of 
    the Agreement, all parties of record in Docket No. ER97-697-000 and to 
    the Virginia State Corporation Commission and the North Carolina 
    Utilities Commission.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    26. New England Power Pool
    
    [Docket No. ER98-2061-000]
    
        Take notice that on March 3, 1998, the New England Power Pool 
    Executive Committee filed for acceptance a signature page to the New 
    England Power Pool (NEPOOL), Agreement dated September 1, 1971, as 
    amended, signed by Sithe New England Holdings LLC (Sithe). The NEPOOL 
    Agreement has been designated NEPOOL FPC No. 2.
        The Executive Committee states that the Commission's acceptance of 
    Sithe's
    
    [[Page 12090]]
    
    signature page would permit NEPOOL to expand its membership to include 
    Sithe. NEPOOL further states that the filed signature page does not 
    change the NEPOOL Agreement in any manner, other than to make Sithe a 
    member in NEPOOL. NEPOOL requests an effective date for the 
    commencement of Sithe's participation in NEPOOL as of the date of 
    Sithe's acquisition of the generating assets currently owned by Boston 
    Edison, which is anticipated to occur mid-May, 1998.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    27. New Century Services, Inc.
    
    [Docket No. ER98-2062-000]
    
        Take notice that on March 3, 1998, New Century Services, Inc., on 
    behalf of Cheyenne Light, Fuel and Power Company, Public Service 
    Company of Colorado, and Southwestern Public Service Company 
    (collectively Companies), tendered for filing a Service Agreement under 
    their Joint Open Access Transmission Service Tariff for Firm Point-to-
    Point Transmission Service between the Companies and Public Service 
    Company of New Mexico.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    28. New Century Services, Inc.
    
    [Docket No. ER98-2063-000]
    
        Take notice that on March 3, 1998, New Century Services, Inc., on 
    behalf of Cheyenne Light, Fuel and Power Company, Public Service 
    Company of Colorado, and Southwestern Public Service Company 
    (collectively Companies), tendered for filing a Service Agreement under 
    their Joint Open Access Transmission Service Tariff for Non-Firm Point-
    to-Point Transmission Service between the Companies and Public Service 
    Company of New Mexico.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    29. New Century Services, Inc.
    
    [Docket No. ER98-2064-000]
    
        Take notice that on March 3, 1998, New Century Services, Inc., on 
    behalf of Cheyenne Light, Fuel and Power Company, Public Service 
    Company of Colorado, and Southwestern Public Service Company 
    (collectively Companies), tendered for filing a Service Agreement under 
    their Joint Open Access Transmission Service Tariff for Non-Firm Point-
    to-Point Transmission Service between the Companies and Engage Energy 
    US, L.P.
        Comment date: March 20, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    30. UtiliCorp United Inc.
    
    [Docket No. ER98-2065-000]
    
        Take notice that on March 3, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed service agreements with Otter Tail Power Wholesale 
    Marketing for service under its Short-Term Firm Point-to-Point open 
    access service tariff for its operating divisions, Missouri Public 
    Service and WestPlains Energy-Kansas.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    31. UtiliCorp United Inc.
    
    [Docket No. ER98-2066-000]
    
        Take notice that on March 3, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed service agreements with Otter Tail Power Wholesale 
    Marketing for service under its Non-Firm Point-to-Point open access 
    service tariff for its operating divisions, Missouri Public Service and 
    WestPlains Energy-Kansas.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    32. Medical Area Total Energy Plant Inc.
    
    [Docket No. ER98-1992-000]
    
        Take notice that on February 24, 1998, Medical Area Total Energy 
    Plant, Inc. (MATEP), in anticipation of the finalization of its 
    purchase of all of the common stock, tendered for filing pursuant to 
    Section 205 and 207, a petition for waivers and blanket approvals under 
    various regulations of the Commission and for an order accepting 
    MATEP's market-based rates tariff to be effective April 20, 1998.
        MATEP intends to sell its generation at market-based rates pursuant 
    to a wholesale contract. In transactions where MATEP sells electric 
    energy it proposes to make such sales on rates, terms and conditions to 
    be mutually agreed to with the purchasing party.
        A copy of AES's Petition was served on the Massachusetts Department 
    of Telecommunications and Energy.
        Comment date: March 19, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    33. UtiliCorp United Inc.
    
    [Docket No. ER98-2067-000]
    
        Take notice that on March 3, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed service agreements with Amoco Energy Trading 
    Corporation for service under its Short-Term Firm Point-to-Point open 
    access service tariff for its operating divisions, Missouri Public 
    Service and WestPlains Energy-Kansas.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    34. UtiliCorp United Inc.
    
    [Docket No. ER98-2068-000]
    
        Take notice that on March 3, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed service agreements with Amoco Energy Trading 
    Corporation for service under its Non-Firm Point-to-Point open access 
    service tariff for its operating divisions, Missouri Public Service and 
    WestPlains Energy-Kansas.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    35. UtiliCorp United Inc.
    
    [Docket No. ER98-2069-000]
    
        Take notice that on March 3, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed service agreements with Cargill-Alliant, L.L.C. for 
    service under its Short-Term Firm Point-to-Point open access service 
    tariff for its operating divisions, Missouri Public Service, WestPlains 
    Energy-Kansas and WestPlains Energy-Colorado.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    36. UtiliCorp United Inc.
    
    [Docket No. ER98-2070-000]
    
        Take notice that on March 3, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed service agreements with Cargill-Alliant, L.L.C., for 
    service under its Non-Firm Point-to-Point open access service tariff 
    for its operating divisions, Missouri Public Service, WestPlains 
    Energy-Kansas and WestPlains Energy-Colorado.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    37. Northern Indiana Public Service Company
    
    [Docket No. ER98-2071-000]
    
        Take notice that on March 3, 1998, Northern Indiana Public Service 
    Company tendered for filing an executed Standard Transmission Service 
    Agreement for Non-Firm Point-to-Point Transmission Service between 
    Northern Indiana Public Service Company and Tennessee Valley Authority 
    (TVA).
        Under the Transmission Service Agreement, Northern Indiana Public 
    Service Company will provide Point-to-Point Transmission Service to TVA 
    pursuant to the Transmission Service Tariff filed by Northern Indiana 
    Public
    
    [[Page 12091]]
    
    Service Company in Docket No. OA96-47-000 and allowed to become 
    effective by the Commission. Northern Indiana Public Service Company 
    has requested that the Service Agreement be allowed to become effective 
    as of March 1, 1998.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    38. Ameren Services Company
    
    [Docket No. ER98-2072-000]
    
        Take notice that on March 3, 1998, Ameren Services Company (AS), 
    tendered for filing Service Agreements for Long-Term Firm Point-to-
    Point Transmission Service between AS and Commonwealth Edison Company 
    (CEC). AS asserts that the purpose of the Agreements is to permit AS to 
    provide transmission service to CEC pursuant to Ameren's Open Access 
    Transmission Tariff filed in Docket No. EC96-7-000 et al.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    39. Central Louisiana Electric Company, Inc.
    
    [Docket No. ER98-2073-000]
    
        Take notice that on March 3, 1998, Central Louisiana Electric 
    Company, Inc., (CLECO), tendered for filing an umbrella service 
    agreement under which CLECO will make market based power sales under 
    its MR-1 tariff with Columbia Power Marketing Corporation.
        CLECO states that a copy of the filing has been served on Columbia 
    Power Marketing Corporation.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    40. Central Louisiana Electric Company, Inc.
    
    [Docket No. ER98-2074-000]
    
        Take notice that on March 3, 1998, Central Louisiana Electric 
    Company, Inc., (CLECO), tendered for filing two service agreements 
    under which CLECO will provide non-firm and short term firm point-to-
    point transmission services to Columbia Power Marketing Corporation 
    under its point-to-point transmission tariff.
        CLECO states that a copy of the filing has been served on Columbia 
    Power Marketing Corporation.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    41. CSW Energy Services, Inc.
    
    [Docket No. ER98-2075-000]
    
        Take notice that on March 3, 1998, CSW Energy Services, Inc. (ESI), 
    filed with the Federal Energy Regulatory Commission a Market-Based Rate 
    Power Sales Tariff to sell power at market-based rates, an application 
    for blanket authorizations and for certain waivers of the Commission's 
    Regulations. ESI intends to engage in transactions in which ESI will 
    sell electricity at rates and on terms and conditions that are 
    negotiated with the purchasing party.
        ESI has requested expedited action on its filing so that the 
    Commission may accept ESI's rate schedule for filing to become 
    effective as of March 31, 1998.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    42. Hawkeye Power Partners, LLC
    
    [Docket No. ER98-2076-000]
    
        Take notice that on March 3, 1998, Hawkeye Power Partners, LLC 
    (Hawkeye Power), petitioned the Commission for acceptance for filing of 
    the power purchase agreement between Hawkeye Power and Interstate Power 
    Company and to accept the rates thereunder as just and reasonable under 
    Section 205(a) of the Federal Power Act, 16 U.S.C. Sec. 824d(a); for 
    the granting of certain blanket approvals, including the authority to 
    sell electricity at market-based rates; and for the waiver of certain 
    Commission regulations. Hawkeye Power is a limited liability company 
    that proposes to engage in the wholesale sale of electric power in the 
    state of Iowa and is headquartered in Cerro Gordo County, Iowa.
        Comment date: March 23, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of these filings are on file with 
    the Commission and are available for public inspection.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-6376 Filed 3-11-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
03/12/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-6376
Dates:
March 26, 1998, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
12087-12091 (5 pages)
Docket Numbers:
Docket No. EG98-35-000, et al.
PDF File:
98-6376.pdf