2012-5845. Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization  

  • Start Preamble

    Take notice that on February 21, 2012 Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro, Kentucky 42301, filed in Docket No. CP12-73-000, a Prior Notice request pursuant to sections 157.205 and 157.216 of the Commission's Regulations under the Natural Gas Act for authorization to replace approximately 3 miles of certain pipeline facilities located in Johnson City, Missouri. Specifically, Southern Star proposes to replace 3 miles of 12-inch diameter XT pipeline by constructing approximately 3 miles of 20-inch diameter XM pipeline which is a continuation of the multi-year program initiated in 2008 to construct the Sedalia 20-inch diameter XM pipeline. The proposed replacement will allow Southern Star to meet a requirement from the Department of Transportation for safety reasons and to eliminate obsolete, acetylene-welded pipeline, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, (202) 502-8659.

    Any questions regarding this Application should be directed to Phyllis Medley, Senior Analyst, Regulatory Affairs, Southern Star Central Gas Pipeline, Inc., 4700 State Highway 56, Owensboro, Kentucky 42301, or call (270) 852-4653, or fax (270) 852-5010, or by email Phyllis.k.medley@sscgp.com.

    Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission's staff may, pursuant to section 157.205 of the Commission's Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA.

    Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter's will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with he Commission's environmental review process. Environmental commenter's will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order.

    The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (www.ferc.gov) under the “e-Filing” link.

    Start Signature

    Dated: March 5, 2012.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2012-5845 Filed 3-9-12; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
03/12/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2012-5845
Pages:
14517-14517 (1 pages)
Docket Numbers:
Docket No. CP12-73-000
PDF File:
2012-5845.pdf