-
Start Preamble
Start Printed Page 10617
AGENCY:
Coast Guard, DHS.
ACTION:
Final rule.
SUMMARY:
The Coast Guard is modifying the operating schedule that governs the Military Street Bridge, mile 0.33, the Seventh Street Bridge, mile 0.50, the Tenth Street Bridge, mile 0.94, and the Canadian National Railroad Bridge, mile 1.56, across the Black River at Port Huron, MI. This rule will modify the operating schedules of the bridges by expanding winter hours, and also modifies the operating schedule of all City of Port Huron drawbridges.
DATES:
This rule is effective April 11, 2018.
ADDRESSES:
To view documents mentioned in this preamble as being available in the docket, go to http://www.regulations.gov. Type USCG-2017-1047 in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this rulemaking.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this rule, call or email Mr. Lee D. Soule, Bridge Management Specialist, Ninth Coast Guard District; telephone 216-902-6085, email Lee.D.Soule@uscg.mil.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Table of Abbreviations
CFR Code of Federal Regulations
DHS Department of Homeland Security
FR Federal Register
IGLD85 International Great Lakes Datum of 1985
LWD Low Water Datum based on IGLD85
OMB Office of Management and Budget
NPRM Notice of Proposed Rulemaking (Advance, Supplemental)
§ Section
U.S.C. United States Code
II. Background Information and Regulatory History
On December 11, 2017, we published a notice of proposed rulemaking entitled Drawbridge Operation Regulation; Black River, Port Huron, MI in the Federal Register (82 FR 58145). We did not receive any comments on this proposed rule.
III. Legal Authority and Need for Rule
The Coast Guard is issuing this rule under authority 33 U.S.C. 499.
The Black River flows southwest through the City of Port Huron, MI and empties into the St. Clair River just below the south end of Lake Huron. Large commercial freighters once traveled up the Black River to facilities past the Canadian National Railroad Bridge, but currently the river is mostly used by recreational vessels with a few small commercial vessels operating in the river. Large commercial vessels do not currently trade in the Black River.
The Military Street Bridge provides a horizontal clearance of 73 feet and a vertical clearance of 13 feet above LWD in the closed position.
The Seventh Street Bridge provides a horizontal clearance of 83 feet and a vertical clearance of 12 feet above LWD in the closed position.
The Tenth Street Bridge provides a horizontal clearance of 90 feet and a vertical clearance of 18 feet above LWD in the closed position.
The Canadian National Railroad Bridge provides a horizontal clearance of 80 feet and a vertical clearance of 14 feet above LWD in the closed position.
The CSX Railroad Bridge, mile 0.09, is out of service and locked in the fully open position.
All five drawbridges provide an unlimited vertical clearance in the open position.
The CSX Railroad Bridge and Canadian National Railroad Bridge are not included in the existing regulation.
The current regulation allows the Military Street Bridge and the Seventh Street Bridge to operate on the hour and half-hour between May 1 and October 31, from 9 a.m. to 5:30 p.m., Monday through Saturday, except Federal Holidays. In April and November, between the hours of 4 p.m. and 8 a.m., both bridges require a 3-hour advance notice for openings.
The Tenth Street Bridge is currently required to open on signal from May 1 through October 31, except from 11 p.m. to 8 a.m. a 1-hour advance notice is required for openings. In April and November the bridge requires a 3-hour advance notice for openings at all times.
From December 1 through March 31 all three highway bridges requires at least 24 hours notice for openings.
As noted above, both the CSX Railroad and Canadian National Railroad bridges are not included in the existing regulation.
IV. Discussion of Comments, Changes and the Final Rule
The Coast Guard provided a comment period of 30 days and no comments were received. The City of Port Huron operates the three highway bridges and requested the winter operating dates to be expanded due to a lack of openings, use of the waterway has substantially changed, and early development of ice in the river that prevents most recreational vessels from transiting the waterway between November 1 and April 30. They requested the winter operating schedules (with 12-hours advance notice from vessels) to apply November 1 through April 30 each year.
In addition to reviewing winter operating dates we have reviewed the current operating schedules for all drawbridges on the waterway. During our coordination with the City of Port Huron and stakeholders, concerns were also received regarding vehicle congestion and predictable bridge openings when the Military Street and Seventh Street Bridges are opened simultaneously for vessels. Both bridges currently open on the hour and half-hour.
This rule alternates, or staggers, openings of the three highway bridges with Military Street and Tenth Street opening on the hour and half-hour, and Seventh Street (the middle highway bridge), on the quarter and three-quarter-hour, thereby providing predictable bridge openings and avoiding all of the highway bridges opening simultaneously, and allowing continuous vessel movements through the highway bridges. To prevent congestion at the bridges, the drawbridges will open at any time five or more vessels are waiting for an opening. This rule is expected to reduce vehicular traffic congestion and delays, and reduce the chance vessels will be stuck between the highway bridges and waiting for extended times for bridge openings.
The Tenth Street Bridge is the furthest upriver highway bridge and provides a higher vertical clearance than the Military Street or the Seventh Street drawbridges, allowing most vessels to pass under the bridge without an opening. The volume of marine traffic and upriver marine facilities that require Tenth Street Bridge openings is significantly lower than Military and Seventh Street Bridges but the vehicular traffic is considerably higher than the other highway bridges. Between May 1 and October 31 this rule will allow the Tenth Street Bridge to open on the hour and half-hour from 8 a.m. to 11 p.m. From 11 p.m. to 8 a.m. the bridge will require a 1-hour advance notice for openings. This schedule will provide predictable bridge openings for vehicles to cross the river at any time while still providing for the reasonable needs of Start Printed Page 10618navigation. Between November 1 and April 30 the bridge will require a 12-hours advance notice to open.
The Canadian National Railroad Bridge normally remains in the open to navigation position and only closes to navigation to accommodate the passage of trains. This rule will add the Canadian National Bridge to the current regulation. The bridge will open on signal at all times between May 1 and October 31, and will open if 12-hours advance notice is provided between November 1 and April 30, matching the winter schedules of the highway bridges.
This rule was coordinated with the City of Port Huron, MI, local marine facilities, local emergency responders (including Coast Guard units), and local marine stakeholders. It is expected to reflect the current usage of the waterway by marine entities during the navigation season and winter periods, improve both marine and vehicular traffic mobility by reducing congestion and delays, simplify the schedules and language in the existing regulation, and provide for the reasonable needs of navigation.
V. Regulatory Analyses
We developed this rule after considering numerous statutes and Executive Orders related to rulemaking. Below we summarize our analyses based on a number of these statutes and Executive Orders, and we discuss First Amendment rights of protesters.
A. Regulatory Planning and Review
Executive Orders 12866 and 13563 direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits. This rule has not been designated a “significant regulatory action,” under Executive Order 12866. Executive order 13771 directs agencies to control regulatory costs through a budgeting process. Accordingly, it has not been reviewed by the Office of Management and Budget (OMB) and pursuant to OMB guidance it is exempt from the requirements of Executive Order 13771.
This regulatory action determination is based on the ability that vessels can still transit the bridge given advanced notice.
B. Impact on Small Entities
The Regulatory Flexibility Act of 1980 (RFA), 5 U.S.C. 601-612, as amended, requires federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. The Coast Guard did not receive any comments from the Small Business Administration on this rule. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.
While some owners or operators of vessels intending to transit the bridge may be small entities, for the reasons stated in section IV above this final rule would not have a significant economic impact on any vessel owner or operator .
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we want to assist small entities in understanding this rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the person listed in the FOR FURTHER INFORMATION CONTACT, above.
Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.
C. Collection of Information
This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
D. Federalism and Indian Tribal Government
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and have determined that it is consistent with the fundamental federalism principles and preemption requirements described in Executive Order 13132.
Also, this rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.
E. Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
F. Environment
We have analyzed this rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have made a determination that this action is one of a category of actions which do not individually or cumulatively have a significant effect on the human environment. This rule simply promulgates the operating regulations or procedures for drawbridges. This action is categorically excluded from further review, under figure 2-1, paragraph (32)(e), of the Instruction.
A Record of Environmental Consideration and a Memorandum for the Record are not required for this rule.
G. Protest Activities
The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels.
Start List of SubjectsList of Subjects in 33 CFR Part 117 Bridges
End List of SubjectsFor the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 117 as follows:
Start Part Start Printed Page 10619PART 117—DRAWBRIDGE OPERATION REGULATIONS
End Part Start Amendment Part1. The authority citation for part 117 continues to read as follows:
End Amendment Part Start Amendment Part2. Revise § 117.625 to read as follows:
End Amendment PartBlack River (Port Huron).(a) The draw of the Military Street Bridge, mile 0.33, shall open on signal; except that, from May 1 through October 31, from 8 a.m. to 11 p.m., seven days a week, the draw need open only on the hour and half-hour for recreational vessels, or at any time when there are more than five vessels waiting for an opening, and from November 1 through April 30 if at least 12-hours advance notice is given.
(b) The draw of the Seventh Street Bridge, mile 0.50, shall open on signal; except that, from May 1 through October 31, from 8 a.m. to 11 p.m., seven days a week, the draw need open only on the quarter-hour and three-quarter-hour for recreational vessels, or at any time when there are more than five vessels waiting for an opening, and from November 1 through April 30 if at least 12-hours advance notice is given.
(c) The draw of the Tenth Street Bridge, mile 0.94, shall open on signal; except that, from May 1 through October 31, from 8 a.m. to 11 p.m., seven days a week, the draw need open only on the hour and half-hour for recreational vessels, or at any time when there are more than five vessels waiting for an opening, and from 11 p.m. to 8 a.m. if at least 1-hour advance notice is provided, and from November 1 through April 30 if at least 12-hours notice is given.
(d) The draw of the Canadian National Railroad Bridge, mile 1.56, shall open on signal; except from November 1 through April 30 if at least 12-hours advance notice is given.
Dated: Febuary 23, 2018.
J.M. Nunan
Rear Admiral, U.S. Coast Guard, Commander, Ninth Coast Guard District.
[FR Doc. 2018-04914 Filed 3-9-18; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Effective Date:
- 4/11/2018
- Published:
- 03/12/2018
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2018-04914
- Dates:
- This rule is effective April 11, 2018.
- Pages:
- 10617-10619 (3 pages)
- Docket Numbers:
- Docket No. USCG-2017-1047
- RINs:
- 1625-AA09: Drawbridge Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
- PDF File:
- 2018-04914.pdf
- CFR: (1)
- 33 CFR 117.625