    NUCLEAR REGULATORY COMMISSION
    [Docket No. 50-498]
    
    
    Houston Lighting and Power Co., City Public Service Board of San 
    Antonio, Central Power and Light Co., City of Austin, TX; Notice of 
    Consideration of Issuance of Amendment to Facility Operating License, 
    Proposed No Significant Hazards Consideration Determination, and 
    Opportunity for a Hearing
    
        The U.S. Nuclear Regulatory Commission (the Commission) is 
    considering issuance of an amendment to Facility Operating License No. 
    NPF-6, issued to Houston Lighting & Power Company, et al., (the 
    licensee) for operation of the South Texas Project (STP), Unit 1, 
    located in Matagorda County, Texas.
        The proposed amendment would modify the steam generator tube 
    plugging criteria in Technical Specification 3/4.4.5, Steam Generators, 
    and the allowable leakage for Unit 1 in Technical Specification 3/
    4.4.6.2, Operational Leakage, and the associated Bases.
        Before issuance of the proposed license amendment, the Commission 
    will have made findings required by the Atomic Energy Act of 1954, as 
    amended (the Act), and the Commission's regulations.
        The Commission has made a proposed determination that the amendment 
    request involves no significant hazards consideration. Under the 
    Commission's regulations in 10 CFR 50.92, this means that operation of 
    the facility in accordance with the proposed amendment would not (1) 
    involve a significant increase in the probability or consequences of an 
    accident previously evaluated; or (2) create the possibility of a new 
    or different kind of accident from any accident previously evaluated; 
    or (3) involve a significant reduction in a margin of safety. As 
    required by 10 CFR 50.91(a), the licensee has provided its analysis of 
    the issue of no significant hazards consideration, which is presented 
    below:
    
        1. Does the proposed change involve a significant increase in 
    the probability or consequences of an accident previously evaluated?
    
    Structural Considerations
    
        Industry testing of model boiler and operating plant tube 
    specimens for free span tubing at room temperature conditions shows 
    typical burst pressures in excess of 5000 psi for indications of 
    outer diameter stress corrosion cracking with voltage measurements 
    at or below the structural limit of 4.0 volts. One model boiler 
    specimen with a voltage amplitude of 19 volts also exhibited a burst 
    pressure greater than 5000 psi. Burst testing performed on one 
    intersection pulled [[Page 13479]] from STP Unit 1 with a 0.51 volt 
    indication yielded a measured burst pressure of 8900 psi at room 
    temperature. It is noted that the industry burst pressure tests do 
    not reflect the effects of temperature and material properties in 
    terms of the realized reduction in strength. However, even 
    correcting for the effects of temperature on material properties 
    (which represents about 80% of the strength at room temperature from 
    ASME [American Society of Mechanical Engineers] Code Section III 
    Appendix 1 values) yields effective burst pressures of about 4000 
    psi which is above the RG [Regulatory Guide] 1.121 limit of 3790 psi 
    (1.43 times the MSLB [main steam line break] pressure differential) 
    at 4.0 volts. The STP Unit 1 data point (0.51 volt) would yield an 
    effective burst pressure of about 7100 psi, which is well above the 
    95% lower tolerance limit (LTL) prediction per the burst correlation 
    data used. Additional benefit is realized during normal operation 
    since the proximity of the TSP [tube support plate] will reinforce 
    the tube, further reducing the likelihood of tube burst.
        The projected end-of-cycle (EOC) voltage compares favorably with 
    the 4 volt structural limit considering the EPRI [Electric Power 
    Research Institute] voltage growth rate for indications at STP. 
    Using the methodology of the NRC Draft Generic Letter 94-XX, the 
    structural limit is reduced by allowances for uncertainty and growth 
    to develop a beginning-of-cycle (BOC) repair limit which should 
    preclude EOC indications from growing in excess of the structural 
    limit. The non-destructive examination (NDE) uncertainty to be 
    applied per EPRI is approximately 21 percent. The EPRI recommended 
    growth allowance of 35 percent/EFPY [effective full power years] is 
    also applied. This growth value is conservative for STP Unit 1 based 
    on previous inspection history. By adding NDE uncertainty allowances 
    and a crack growth allowance to the repair limit, the structural 
    limit can be validated. Therefore, the maximum allowable BOC repair 
    limit (RL) based on the structural limit of 4 volts can be 
    represented as:
    
    RL + (0.20  x  RL) + (0.53*  x  RL) = 4 volts, which yields RL of 
    2.3 volts.
    
        *The 35% growth rate for 1 EFPY was scaled up to the cycle 
    length used at South Texas.
    
        This repair limit (2.3 volts) reasonably could be applied for 
    APC [alternate plugging criteria] implementation to repair bobbin 
    indications greater than the 1.0 volt criterion specified by NRC 
    Generic Letter 94-XX and is independent of RPC [rotating pancake 
    coil] confirmation of the indications. Houston Lighting & Power has 
    chosen to use a steam generator tube upper repair limit of 2.3 volts 
    to assess tube integrity for those bobbin indications which are 
    above 1.0 volt but do not have confirming RPC calls. This 2.3 volt 
    upper limit for non-confirmed RPC calls is consistent with the NRC 
    Generic Letter 94-XX which establishes 2.7 volts as the upper limit 
    for 3/4 tubing. Since the upper bound for repair of non-confirmed 
    RPC is limited to a value far less than the structural limit 
    associated with full alternate criteria, the establishment of the 
    repair limits are determined to be reasonable and conservative with 
    respect to the industry pulled tube data base used.
    
    Leakage Considerations
    
        As part of the implementation of APC, the distribution of EOC 
    cracking indications at the TSP intersections has been used to 
    calculate the primary to secondary leakage which is bounded by the 
    maximum leakage required to remain within applicable dose limits (10 
    CFR 100, NUREG-0800 and GDC [General Design Criterion] 19). This 
    limit was calculated using the Technical Specification RCS [reactor 
    coolant system] Iodine-131 transient spiking values consistent with 
    NUREG-0800. Applications of the APC criteria requires the projection 
    of postulated MSLB leakage based on the projected EOC voltage 
    distribution for the beginning of the cycle. Projected EOC voltage 
    distribution is developed using the most recent EOC eddy current 
    results and a voltage measurement uncertainty. Draft NUREG-1477 
    requires that all indications to which APC is applied must be 
    included in the leakage projection.
        The projected MSLB leakage rate calculation methodology 
    prescribed in EPRI TR-100407 will be used to calculate the EOC 
    leakage. A Monte Carlo approach will be used to determine the EOC 
    leakage, accounting for all of the ECT [eddy current testing] 
    uncertainties, voltage growth, and an assumed probability of 
    detection (POD) of 0.6 for a 1.0 volt repair limit. The fitted 
    logarithmic function probability of leakage correlation will be used 
    to establish the STP MSLB leak rate used for comparison with a 
    bounding allowable leak rate in the faulted loop which would result 
    in radiological consequences which are within applicable dose 
    limits. Due to the relatively low voltage levels of indications at 
    STP and low voltage growth rates, it is expected that the actual 
    calculated leakage values will be far less than this limit. 
    Currently, the leakage projected for EOC-05 at STP Unit 1 is 0.02 
    gpm [gallons per minute] (<21 gpd="" [gallons="" per="" day])="" which="" is="" negligible="" in="" comparison="" to="" the="" allowable="" limit.="" therefore,="" implementation="" of="" apc="" does="" not="" adversely="" affect="" steam="" generator="" tube="" integrity="" and="" implementation="" will="" be="" shown="" to="" result="" in="" acceptable="" does="" consequences.="" the="" proposed="" amendment="" does="" not="" result="" in="" any="" increase="" in="" the="" probability="" of="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" implementation="" of="" the="" proposed="" steam="" generator="" tube="" alternate="" plugging="" criteria="" for="" odscc="" [outer="" diameter="" stress="" corrosion="" cracking]="" at="" the="" tsp="" intersections="" does="" not="" introduce="" any="" significant="" changes="" to="" the="" plant="" design="" basis.="" use="" of="" the="" criteria="" does="" not="" provide="" a="" mechanism="" which="" could="" result="" in="" an="" accident="" outside="" of="" the="" region="" of="" the="" tsp="" elevations="" since="" no="" odscc="" has="" been="" identified="" outside="" the="" thickness="" of="" the="" tsps.="" it="" is="" therefore="" expected="" that="" for="" all="" plant="" conditions,="" neither="" a="" single="" nor="" multiple="" tube="" rupture="" event="" would="" occur="" in="" a="" steam="" generator="" where="" apc="" has="" been="" applied.="" specifically,="" houston="" lighting="" &="" power="" will="" implement,="" for="" unit="" 1,="" a="" maximum="" leakage="" rate="" of="" 150="" gpd="" per="" steam="" generator="" (sg)="" to="" help="" preclude="" the="" potential="" for="" excessive="" leakage="" during="" all="" plant="" conditions.="" the="" current="" technical="" specification="" limits="" on="" primary-="" to-secondary="" leakage="" at="" operating="" conditions="" are="" 1="" gpm="" for="" all="" steam="" generators="" or="" 500="" gpd="" for="" any="" one="" sg.="" the="" rg="" 1.121="" criterion="" for="" establishing="" operational="" leakage="" rate="" limits="" governing="" plant="" shutdown="" be="" based="" [sic]="" upon="" leak-before-break="" (lbb)="" considerations="" to="" detect="" a="" free="" span="" crack="" before="" potential="" tube="" rupture="" as="" a="" result="" of="" faulted="" plant="" conditions.="" the="" 150="" gpd="" limit="" is="" intended="" to="" provide="" for="" leakage="" detection="" and="" plant="" shutdown="" in="" the="" event="" of="" an="" unexpected="" crack="" propagation="" resulting="" in="" excessive="" leakage.="" rg="" 1.121="" acceptance="" criteria="" for="" establishing="" operating="" leakage="" limits="" are="" based="" on="" lbb="" considerations="" such="" that="" plant="" shutdown="" is="" initiated="" if="" the="" permissible="" crack="" is="" exceeded.="" the="" predicted="" eoc="" leakage="" for="" stp="" is="" based="" on="" a="" 35%="" growth="" rate="" and="" does="" not="" take="" credit="" for="" the="" tsp="" proximity="" during="" normal="" operation.="" the="" total="" current="" projected="" leakage="" for="" eoc="" 05="" is="" 20.5="" gpd="" for="" the="" limiting="" sg="" (c)="" at="" stp="" unit="" 1="" which="" is="" considerably="" less="" than="" the="" 150="" gpd="" limit.="" thus,="" the="" 150="" gpd="" limit="" provides="" for="" plant="" shutdown="" prior="" to="" reaching="" critical="" crack="" lengths.="" additionally,="" this="" leak-before-break="" evaluation="" assumes="" that="" the="" entire="" crevice="" area="" is="" uncovered="" during="" the="" secondary="" side="" blowdown="" of="" a="" mslb.="" typically,="" it="" is="" expected="" for="" the="" vast="" majority="" of="" intersections="" that="" only="" partial="" uncovery="" will="" occur.="" thus,="" the="" proximity="" of="" the="" tsp="" will="" enhance="" the="" burst="" capacity="" of="" the="" tube.="" steam="" generator="" tube="" integrity="" is="" continually="" maintained="" through="" inservice="" inspection="" and="" primary-to-secondary="" leakage="" monitoring.="" any="" tubes="" falling="" outside="" the="" apc="" repair="" limits="" are="" removed="" from="" service.="" therefore,="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" developed="" is="" not="" created.="" 3.="" does="" the="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" use="" of="" the="" voltage="" based="" bobbin="" probe="" for="" dispositioning="" odscc="" degraded="" tubes="" within="" tsp="" intersections="" by="" apc="" is="" demonstrated="" to="" maintain="" steam="" generator="" tube="" integrity="" in="" accordance="" with="" the="" requirements="" of="" rg="" 1.121.="" rg="" 1.121="" describes="" a="" method="" acceptable="" to="" the="" nrc="" staff="" for="" meeting="" gdcs="" 14,="" 15,="" 31,="" and="" 32="" by="" reducing="" the="" probability="" or="" the="" consequences="" of="" steam="" generator="" tube="" rupture.="" this="" is="" accomplished="" by="" determining="" the="" limiting="" conditions="" of="" degradation="" of="" steam="" generator="" tubing,="" as="" established="" by="" inservice="" inspection,="" for="" which="" tubes="" with="" unacceptable="" cracking="" are="" removed="" from="" service.="" upon="" implementation="" of="" the="" criteria,="" even="" under="" the="" worst="" case="" conditions,="" the="" occurrence="" of="" odscc="" at="" the="" tsp="" elevation="" is="" not="" expected="" to="" leak="" to="" a="" steam="" generator="" tube="" rupture="" event="" during="" normal="" or="" faulted="" plant="" conditions.="" the="" eoc="" distribution="" of="" crack="" indications="" at="" the="" tsp="" elevations="" will="" be="" confirmed="" to="" result="" in="" acceptable="" primary-to-secondary="" leakage="" during="" all="" plant="" conditions="" and="" that="" radiological="" consequences="" are="" not="" adversely="" impacted.="" in="" addressing="" the="" combined="" effects="" of="" loss="" of="" coolant="" accident="" (loca)="" and="" safe="" [[page="" 13480]]="" shutdown="" earthquake="" (sse)="" on="" the="" steam="" generator="" component="" (as="" required="" by="" gdc="" 2),="" it="" has="" been="" determined="" that="" tube="" collapse="" may="" occur="" in="" the="" steam="" generators="" at="" some="" plants.="" this="" is="" the="" case="" at="" stp="" as="" the="" tsp="" may="" become="" deformed="" as="" a="" result="" of="" lateral="" loads="" at="" the="" wedge="" supports="" at="" the="" periphery="" of="" the="" plate="" due="" to="" the="" combined="" effects="" of="" the="" loca="" [loss="" of="" coolant="" accident]="" rarefaction="" wave="" and="" sse="" loadings.="" the="" resulting="" secondary-to-primary="" pressure="" differential="" on="" the="" deformed="" tubes="" may="" cause="" some="" of="" the="" tube="" to="" collapse.="" there="" are="" two="" concerns="" associated="" with="" steam="" generator="" tube="" collapse.="" first,="" the="" collapse="" of="" steam="" generator="" tubing="" reduces="" the="" rcs="" flow="" area="" through="" the="" tubes.="" the="" reduction="" on="" flow="" area="" increases="" the="" resistance="" to="" flow="" of="" steam="" from="" the="" core="" during="" a="" loca="" which,="" in="" turn,="" may="" potentially="" increase="" peak="" clad="" temperature="" (pct).="" second,="" there="" is="" a="" potential="" that="" through="" wall="" cracks="" in="" tubes="" could="" sufficiently="" enlarge="" during="" tube="" deformation="" or="" collapse,="" causing="" sufficient="" in-leakage="" of="" secondary="" water="" back="" to="" the="" core="" which="" dilutes="" the="" poisoning="" effect="" of="" boron="" injection="" from="" the="" emergency="" cooling="" system.="" again,="" an="" increase="" in="" core="" pct="" may="" result.="" consequently,="" since="" the="" lbb="" methodology="" is="" applicable="" to="" the="" stp="" reactor="" coolant="" loop="" piping,="" the="" probability="" of="" breaks="" in="" the="" primary="" loop="" piping="" is="" sufficiently="" low="" that="" they="" need="" not="" be="" considered="" in="" the="" structural="" design="" of="" the="" plant.="" the="" limiting="" loca="" event="" becomes="" either="" the="" accumulator,="" rhr="" [residual="" heat="" removal],="" or="" the="" pressurizer="" surge="" line="" break.="" the="" analysis="" identifies="" tube="" located="" adjacent="" to="" wedge="" regions="" that="" are="" subject="" to="" potential="" collapse="" during="" combined="" loca="" and="" sse.="" these="" tubes="" will="" be="" excluded="" from="" application="" of="" apc.="" thus,="" existing="" tube="" integrity="" requirements="" apply="" to="" these="" tubes="" and="" the="" margin="" of="" safety="" is="" not="" reduced.="" implementation="" practices="" using="" the="" bobbin="" probe="" voltage="" based="" tube="" plugging="" criteria="" bounds="" rg="" 1.83="" considerations="" by:="" (1)="" using="" enhanced="" eddy="" current="" inspection="" guidelines="" consistent="" with="" those="" used="" by="" epri="" in="" developing="" the="" correlations.="" this="" provides="" consistency="" in="" voltage="" normalization,="" (2)="" performing="" a="" 100="" percent="" bobbin="" coil="" inspection="" for="" all="" hot="" leg="" tube="" support="" plate="" intersections="" and="" all="" cold="" leg="" intersections="" down="" to="" the="" lowest="" cold="" leg="" tube="" support="" plate="" with="" outer="" diameter="" stress="" corrosion="" cracking="" (odscc)="" indications.="" the="" determination="" of="" the="" tube="" support="" plate="" intersections="" having="" odscc="" indications="" shall="" be="" based="" on="" the="" performance="" of="" at="" least="" a="" 20%="" random="" sampling="" of="" tubes="" inspected="" over="" their="" full="" length,="" and="" (3)="" incorporating="" rpc="" inspection="" for="" all="" tubes="" with="" larger="" indications="" left="" inservice.="" this="" further="" establishes="" the="" principal="" degradation="" morphology="" as="" odscc.="" implementation="" of="" apc="" at="" tsp="" intersections="" will="" decrease="" the="" number="" of="" tubes="" which="" must="" be="" repaired.="" since="" the="" installation="" of="" tube="" plugs="" (to="" remove="" odscc="" degraded="" tubes="" from="" service)="" reduces="" the="" rcs="" flow="" margin,="" apc="" implementation="" will="" help="" preserve="" the="" margin="" of="" flow="" that="" would="" otherwise="" be="" reduced.="" the="" projected="" eoc="" primary-to-secondary="" leakage="" rate="" allowed="" is="" bounded="" by="" a="" leak="" rate="" which="" limits="" the="" radiological="" consequences="" of="" a="" eoc="" mslb="" to="" within="" applicable="" dose="" limits.="" therefore,="" this="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" the="" margin="" to="" safety.="" it="" is="" therefore="" concluded="" that="" the="" proposed="" license="" amendment="" request="" does="" not="" result="" in="" a="" significant="" reduction="" in="" the="" margin="" of="" safety="" as="" defined="" in="" the="" plant="" final="" safety="" analysis="" report="" or="" technical="" specifications.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" the="" commission="" is="" seeking="" public="" comments="" on="" this="" proposed="" determination.="" any="" comments="" received="" within="" 30="" days="" after="" the="" date="" of="" publication="" of="" this="" notice="" will="" be="" considered="" in="" making="" any="" final="" determination.="" normally,="" the="" commission="" will="" not="" issue="" the="" amendment="" until="" the="" expiration="" of="" the="" 30-day="" notice="" period.="" however,="" should="" circumstances="" change="" during="" the="" notice="" period="" such="" that="" failure="" to="" act="" in="" a="" timely="" way="" would="" result,="" for="" example,="" in="" derating="" or="" shutdown="" of="" the="" facility,="" the="" commission="" may="" issue="" the="" license="" amendment="" before="" the="" expiration="" of="" the="" 30-day="" notice="" period,="" provided="" that="" its="" final="" determination="" is="" that="" the="" amendment="" involves="" no="" significant="" hazards="" consideration.="" the="" final="" determination="" will="" consider="" all="" public="" and="" state="" comments="" received.="" should="" the="" commission="" take="" this="" action,="" it="" will="" publish="" in="" the="" federal="" register="" a="" notice="" of="" issuance="" and="" provide="" for="" opportunity="" for="" a="" hearing="" after="" issuance.="" the="" commission="" expects="" that="" the="" need="" to="" take="" this="" action="" will="" occur="" very="" infrequently.="" written="" comments="" may="" be="" submitted="" by="" mail="" to="" the="" rules="" review="" and="" directives="" branch,="" division="" of="" freedom="" of="" information="" and="" publications="" services,="" office="" of="" administration,="" u.s.="" nuclear="" regulatory="" commission,="" washington,="" dc="" 20555,="" and="" should="" cite="" the="" publication="" date="" and="" page="" number="" of="" this="" federal="" register="" notice.="" written="" comments="" may="" also="" be="" delivered="" to="" room="" 6d22,="" two="" white="" flint="" north,="" 11545="" rockville="" pike,="" rockville,="" maryland,="" from="" 7:30="" a.m.="" to="" 4:15="" p.m.="" federal="" workdays.="" copies="" of="" written="" comments="" received="" may="" be="" examined="" at="" the="" nrc="" public="" document="" room,="" the="" gelman="" building,="" 2120="" l="" street,="" washington,="" dc.="" the="" filing="" of="" requests="" for="" hearing="" for="" petitions="" for="" leave="" to="" intervene="" is="" discussed="" below.="" by="" april="" 12,="" 1995,="" the="" licensee="" may="" file="" a="" request="" for="" a="" hearing="" with="" respect="" to="" issuance="" of="" the="" amendment="" to="" the="" subject="" facility="" operating="" license="" and="" any="" person="" whose="" interest="" may="" be="" affected="" by="" this="" proceeding="" and="" who="" wishes="" to="" participate="" as="" a="" party="" in="" the="" proceeding="" must="" file="" a="" written="" request="" for="" a="" hearing="" and="" a="" petition="" for="" leave="" to="" intervene.="" requests="" for="" a="" hearing="" and="" a="" petition="" for="" leave="" to="" intervene="" shall="" be="" filed="" in="" accordance="" with="" the="" commission's="" ``rules="" of="" practice="" for="" domestic="" licensing="" proceedings''="" in="" 10="" cfr="" part="" 2.="" interested="" persons="" should="" consult="" a="" current="" copy="" of="" 10="" cfr="" 2.714="" which="" is="" available="" at="" the="" commission's="" public="" document="" room,="" the="" gelman="" building,="" 2120="" l="" street,="" nw.,="" washington,="" dc,="" and="" at="" the="" local="" public="" document="" room="" located="" at="" the="" wharton="" county="" junior="" college,="" j.m.="" hodges="" learning="" center,="" 911="" boling="" highway,="" wharton,="" texas="" 77488.="" if="" a="" request="" for="" a="" hearing="" or="" petition="" for="" leave="" to="" intervene="" is="" filed="" by="" the="" above="" date,="" the="" commission="" or="" an="" atomic="" safety="" and="" licensing="" board,="" designated="" by="" the="" commission="" or="" by="" the="" chairman="" of="" the="" atomic="" safety="" and="" licensing="" board="" panel,="" will="" rule="" on="" the="" request="" and/or="" petition;="" and="" the="" secretary="" or="" the="" designated="" atomic="" safety="" and="" licensing="" board="" will="" issue="" a="" notice="" of="" hearing="" or="" an="" appropriate="" order.="" as="" required="" by="" 10="" cfr="" 2.714,="" a="" petition="" for="" leave="" to="" intervene="" shall="" be="" set="" forth="" with="" particularly="" the="" interest="" of="" the="" petitioner="" in="" the="" proceeding,="" and="" how="" that="" interest="" may="" be="" affected="" by="" the="" results="" of="" the="" proceeding.="" the="" petition="" should="" specifically="" explain="" the="" reasons="" why="" intervention="" should="" be="" permitted="" with="" particular="" reference="" to="" the="" following="" factors:="" (1)="" the="" nature="" of="" the="" petitioner's="" right="" under="" the="" act="" to="" be="" made="" party="" to="" the="" proceeding;="" (2)="" the="" nature="" and="" extent="" of="" the="" petitioner's="" property,="" financial,="" or="" other="" interest="" in="" the="" proceeding;="" and="" (3)="" the="" possible="" effect="" of="" any="" order="" which="" may="" be="" entered="" in="" the="" proceeding="" on="" the="" petitioner's="" interest.="" the="" petition="" should="" also="" identify="" the="" specific="" aspect(s)="" of="" the="" subject="" matter="" of="" the="" proceeding="" as="" to="" which="" petitioner="" wishes="" to="" intervene.="" any="" person="" who="" has="" filed="" a="" petition="" for="" leave="" to="" intervene="" or="" who="" has="" been="" admitted="" as="" a="" party="" may="" amend="" the="" petition="" without="" requesting="" leave="" of="" the="" board="" up="" to="" 15="" days="" prior="" to="" the="" first="" prehearing="" conference="" scheduled="" in="" the="" proceeding,="" but="" such="" an="" amended="" petition="" must="" satisfy="" the="" specificity="" requirements="" described="" above.="" not="" later="" than="" 15="" days="" prior="" to="" the="" first="" prehearing="" conference="" scheduled="" in="" the="" proceeding,="" a="" petitioner="" shall="" file="" a="" supplement="" to="" the="" petition="" to="" intervene="" [[page="" 13481]]="" which="" must="" include="" a="" list="" of="" the="" contentions="" which="" are="" sought="" to="" be="" litigated="" in="" the="" matter.="" each="" contention="" must="" consist="" of="" a="" specific="" statement="" of="" the="" issue="" of="" law="" or="" fact="" to="" be="" raised="" or="" controverted.="" in="" addition,="" the="" petitioner="" shall="" provide="" a="" brief="" explanation="" of="" the="" bases="" of="" the="" contention="" and="" a="" concise="" statement="" of="" the="" alleged="" facts="" or="" expert="" opinion="" which="" support="" the="" contention="" and="" on="" which="" the="" petitioner="" intends="" to="" rely="" in="" proving="" the="" contention="" at="" the="" hearing.="" the="" petitioner="" must="" also="" provide="" references="" to="" those="" specific="" sources="" and="" documents="" of="" which="" the="" petitioner="" is="" award="" and="" on="" which="" the="" petitioner="" intends="" to="" rely="" to="" establish="" those="" facts="" or="" expert="" opinion.="" petitioner="" must="" provide="" sufficient="" information="" to="" show="" that="" a="" genuine="" dispute="" exists="" with="" the="" applicant="" on="" a="" material="" issue="" of="" law="" or="" fact.="" contentions="" shall="" be="" limited="" to="" matters="" within="" the="" scope="" of="" the="" amendment="" under="" consideration.="" the="" contention="" must="" be="" one="" which,="" if="" proven,="" would="" entitle="" the="" petitioner="" to="" relief.="" a="" petitioner="" who="" fails="" to="" file="" such="" a="" supplement="" which="" satisfies="" these="" requirements="" with="" respect="" to="" at="" least="" one="" contention="" will="" not="" be="" permitted="" to="" participate="" as="" a="" party.="" those="" permitted="" to="" intervene="" become="" parties="" to="" the="" proceeding,="" subject="" to="" any="" limitations="" in="" the="" order="" granting="" leave="" to="" intervene,="" and="" have="" the="" opportunity="" to="" participate="" fully="" in="" the="" conduct="" of="" the="" hearing,="" including="" the="" opportunity="" to="" present="" evidence="" and="" cross-="" examine="" witnesses.="" if="" a="" hearing="" is="" requested,="" the="" commission="" will="" make="" a="" final="" determination="" on="" the="" issue="" of="" no="" significant="" hazards="" consideration.="" the="" final="" determination="" will="" serve="" to="" decide="" when="" the="" hearing="" is="" held.="" if="" the="" final="" determination="" is="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration,="" the="" commission="" may="" issue="" the="" amendment="" and="" make="" it="" immediately="" effective,="" notwithstanding="" the="" request="" for="" a="" hearing.="" any="" hearing="" held="" would="" take="" place="" after="" issuance="" of="" the="" amendment.="" if="" the="" final="" determination="" is="" that="" the="" amendment="" request="" involves="" a="" significant="" hazards="" consideration,="" any="" hearing="" held="" would="" take="" place="" before="" the="" issuance="" of="" any="" amendment.="" a="" request="" for="" a="" hearing="" or="" a="" petition="" for="" leave="" to="" intervene="" must="" be="" filed="" with="" the="" secretary="" of="" the="" commission,="" u.s.="" nuclear="" regulatory="" commission,="" washington,="" dc="" 20555,="" attention:="" docketing="" and="" services="" branch,="" or="" may="" be="" delivered="" to="" the="" commission's="" public="" document="" room,="" the="" gelman="" building,="" 2120="" l="" street,="" nw.,="" washington,="" dc,="" by="" the="" above="" date.="" where="" petitions="" are="" filed="" during="" the="" last="" 10="" days="" of="" the="" notice="" period,="" it="" is="" requested="" that="" the="" petitioner="" promptly="" so="" inform="" the="" commission="" by="" a="" toll-free="" telephone="" call="" to="" western="" union="" at="" 1-(800)="" 248-5100="" (in="" missouri="" 1-(800)="" 342-6700).="" the="" western="" union="" operator="" should="" be="" given="" datagram="" identification="" number="" n1023="" and="" the="" following="" message="" addressed="" to="" william="" d.="" beckner,="" director,="" project="" directorate="" iv-1:="" petitioner's="" name="" and="" telephone="" number,="" date="" petition="" was="" mailed,="" plant="" name,="" and="" publication="" date="" and="" page="" number="" of="" this="" federal="" register="" notice.="" a="" copy="" of="" the="" petition="" should="" also="" be="" sent="" to="" the="" office="" of="" the="" general="" counsel,="" u.s.="" nuclear="" regulatory="" commission,="" washington,="" dc="" 20555,="" and="" to="" jack="" r.="" newman,="" esq.,="" newman="" &="" holtzinger,="" p.c.,="" 1615="" l="" street,="" nw.,="" washington,="" dc="" 20036,="" attorney="" for="" the="" licensee.="" nontimely="" filings="" of="" petitions="" for="" leave="" to="" intervene,="" amended="" petitions,="" supplemental="" petitions="" and/or="" requests="" for="" hearing="" will="" not="" be="" entertained="" absent="" a="" determination="" by="" the="" commission,="" the="" presiding="" officer="" or="" the="" presiding="" atomic="" safety="" and="" licensing="" board="" that="" the="" petition="" and/or="" request="" should="" be="" granted="" based="" upon="" a="" balancing="" of="" the="" factors="" specified="" in="" 10="" cfr="" 2.714(a)(1)(i)-(v)="" and="" 2.714(d).="" for="" further="" details="" with="" respect="" to="" this="" action,="" see="" the="" application="" for="" amendment="" dated="" march="" 1,="" 1995,="" which="" is="" available="" for="" public="" inspection="" at="" the="" commission's="" public="" document="" room,="" the="" gelman="" building,="" 2120="" l="" street,="" nw.,="" washington,="" dc,="" and="" at="" the="" local="" public="" document="" room="" located="" at="" the="" wharton="" county="" junior="" college,="" j.m.="" hodges="" learning="" center,="" 911="" boling="" highway,="" wharton,="" texas="" 77488.="" dated="" at="" rockville,="" maryland,="" this="" 7th="" day="" of="" march="" 1995.="" for="" the="" nuclear="" regulatory="" commission.="" thomas="" w.="" alexion,="" project="" manager,="" project="" directorate="" iv-1,="" division="" of="" reactor="" projects="" iii/iv,="" office="" of="" nuclear="" reactor="" regulation.="" [fr="" doc.="" 95-6067="" filed="" 3-10-95;="" 8:45="" am]="" billing="" code="" 7590-01-m="">

Document Information

Published:
03/13/1995