97-6281. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 49 (Thursday, March 13, 1997)]
[Notices]
[Page 11855]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-6281]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP97-274-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
March 7, 1997.
Take notice that on March 3, 1997, NorAm Gas Transmission Company
(NorAm), 525 Milam Street, Shreveport, Louisiana 71151, filed in Docket
No. CP97-274-000 a request pursuant to Sections 157.205 and 157.212 of
the Commission's Regulations (18 CFR 157.205, 157.212) under the
Natural Gas Act (NGA) for authorization to construct and operate a
delivery tap to Quincy Soybean Corporation (Quincy) located in Phillips
County, Arkansas under the authorization of Section 7 of the Natural
Gas Act (NGA), for Part 284 transportation services by NorAm, under
NorAm's blanket certificate issued in Docket Nos. CP82-384-000 and
CP82-384-001, all as more fully set forth in the request that is on
file with the Commission and open to public inspection.
NorAm proposes to install a two-inch L-shaped meter station, a
four-inch tap, relief valve, electronic flow measurement and 425 feet
of 8\5/8\ nominal piping that will extend from NorAm's Line TM-2
through the Quincy yard to the cogeneration plant in Phillips County,
Arkansas. NorAm indicates that the cost of these facilities is $36,274.
NorAm asserts that Quincy has contracted for an additional 1,000 MMBtu
per day with estimated deliveries of 365,000 MMBtu on an annual basis.
NorAm states that it will transport gas to Quincy and provide
service under Rate Schedule FT of NorAm's FERC Gas Tariff. NorAm
further states that its tariff does not prohibit the addition of
delivery points and that NorAm has sufficient capacity to accomplish
the deliveries without detriment or disadvantage to its other
customers.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-6281 Filed 3-12-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 03/13/1997
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 97-6281
- Pages:
- 11855-11855 (1 pages)
- Docket Numbers:
- Docket No. CP97-274-000
- PDF File:
-
97-6281.pdf