[Federal Register Volume 61, Number 51 (Thursday, March 14, 1996)]
[Notices]
[Pages 10572-10574]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-6118]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. ER95-139-001, et al.]
Southern California Edison Company, et al.; Electric Rate and
Corporate Regulation Filings
March 7, 1996.
Take notice that the following filings have been made with the
Commission:
1. Southern California Edison Company
[Docket No. ER95-139-001]
Take notice that on March 1, 1996, Southern California Edison
Company tendered for filing its refund report in the above-referenced
docket.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
2. Texas-Ohio Power Marketing, Inc., Audit Pro Incorporated, Gateway
Energy Inc., Alliance Strategies, IGM, Inc., ConAgra Energy Services,
Inc.
[Docket Nos. ER94-1676-006, ER95-878-003, ER95-1049-002, ER95-1381-001,
ER95-1439-001, ER95-1751-001 (not consolidated)]
Take notice that the following informational filings have been made
with the Commission and are on file and available for inspection and
copying in the Commission's Public Reference Room:
On February 28, 1996, Texas-Ohio Power Marketing, Inc. filed
certain information as required by the Commission's October 31, 1994
order in Docket No. ER94-1676-000.
On February 1, 1996, Audit Pro Incorporated filed certain
information as required by the Commission's June 2, 1995 order in
Docket No. ER95-878-000.
On February 23, 1996, Gateway Energy Inc. filed certain information
as required by the Commission's August 4, 1995 order in Docket No.
ER95-1049-000.
On February 26, 1996, Alliance Strategies filed certain information
as required by the Commission's August 25, 1995 order in Docket No.
ER95-1381-000.
On February 16, 1996, IGM, Inc. filed certain information as
required by the Commission's August 28, 1995 order in Docket No. ER95-
1439-000.
On February 23, 1996, ConAgra Energy Services, Inc. filed certain
information as required by the Commission's October 23, 1995 order in
Docket No. ER95-1751-000.
3. Public Serivce Company of Oklahoma; Southwestern Electric Power
Company
[Docket No. ER96-1182-000]
Take notice that on February 27, 1996, Public Service Company of
Oklahoma (PSO) and Southwestern Electric Power Company (SWEPCO)
(jointly, the Companies) submitted two Transmission Service Agreements
dated February 7, and February 19, 1996, establishing Destec Power
Services, Inc. (Destec) and Entergy Power, Inc. (Entergy),
respectively, as customers under the terms of the Companies' SPP
Interpool Transmission Service Tariff.
The Companies request waiver of the Commission's notice
requirements. Copies of this filing were served upon Destec and
Entergy.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
4. Florida Power Corporation
[Docket No. ER96-1183-000]
Take notice that on February 27, 1996, Florida Power Corporation
(FPC) tendered for filing Amendment No. 1 to its contract for
interchange service between itself and City of Tallahassee
(Tallahassee). The amendment provides for the addition of the service
schedule to the contract. FPC requests Commission waiver of the 60-day
notice requirement in order to allow the amendment to become effective
on February 28, 1996. Waiver is appropriate because this filing does
not change the rate under this commission accepted, existing rate
schedule.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
5. Florida Power Corporation
[Docket No. ER96-1184-000]
Take notice that on February 27, 1996, Florida Power Corporation
(FPC) tendered for filing Amendment No. 1 to its contract for
interchange service between itself and City of Homestead (Homestead).
The amendment provides for the addition of the service schedule to the
contract.
FPC requests Commission waiver of the 60-day notice requirement in
order to allow the amendment to become effective on February 28, 1996.
Waiver is appropriate because this filing does not change the rate
under this commission accepted, existing rate schedule.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
6. Florida Power Corporation
[Docket No. ER96-1185-000]
Take notice that on February 27, 1996, Florida Power Corporation
(FPC) tendered for filing Amendment No. 1 to its contract for
interchange service between itself and City of Vero Beach (Vero Beach).
The amendment provides for the addition of the service schedule to the
contract.
FPC requests Commission waiver of the 60-day notice requirement in
order to allow the amendment to become effective on February 28, 1996.
Waiver is appropriate because this filing does not change the rate
under this commission accepted, existing rate schedule.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
[[Page 10573]]
7. Florida Power Corporation
[Docket No. ER96-1186-000]
Take notice that on February 27, 1996, Florida Power Corporation
(FPC) tendered for filing Amendment No. 1 to its contract for
interchange service between itself and Utilities Commission, City of
New Smyrna Beach (Commission). The amendment provides for the addition
of the service schedule to the contract.
FPC requests Commission waiver of the 60-day notice requirement in
order to allow the amendment to become effective on February 28, 1996.
Waiver is appropriate because this filing does not change the rate
under this commission accepted, existing rate schedule.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
8. Florida Power Corporation
[Docket No. ER96-1187-000]
Take notice that on February 27, 1996, Florida Power Corporation
(FPC) tendered for filing Amendment No. 1 to its contract for
interchange service between itself and Gainesville Regional Utilities
(Gainesville). The amendment provides for the addition of the service
schedule to the contract.
FPC requests Commission waiver of the 60-day notice requirement in
order to allow the amendment to become effective on February 28, 1996.
Waiver is appropriate because this filing does not change the rate
under this commission accepted, existing rate schedule.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
9. Florida Power Corporation
[Docket No. ER96-1188-000]
Take notice that on February 27, 1996, Florida Power Corporation
(FPC) tendered for filing Amendment No. 1 to its contract for
interchange service between itself and City of Lake Worth (Lake Worth).
The amendment provides for the addition of the service schedule to the
contract.
FPC requests Commission waiver of the 60-day notice requirement in
order to allow the amendment to become effective on February 28, 1996.
Waiver is appropriate because this filing does not change the rate
under this commission accepted, existing rate schedule.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
10. Florida Power Corporation
[Docket No. ER96-1189-000]
Take notice that on February 27, 1996, Florida Power Corporation
(FPC) tendered for filing service agreements providing for service to
Delhi energy Services, Inc. pursuant to its open access transmission
tariff (the T-2 Tariff). Florida Power requests that the Commission
waive its notice of filing requirements and allow the agreements to
become effective February 28, 1996.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
11. Florida Power Corporation
[Docket No. ER96-1190-000]
Take notice that on February 27, 1996, Florida Power Corporation
(FPC) tendered for filing a contract for the provision of interchange
service between itself and Delhi Energy Services Inc. The contract
provides for service under Schedule J, Negotiated Interchange Service
and OS, Opportunity Sales. Cost support for both schedules has been
previously filed and approved by the Commission. No specifically
assignable facilities have been or will be installed or modified in
order to supply service under the proposed rates.
FPC requests Commission waiver of the 60-day notice requirement in
order to allow the contract to become effective as a rate schedule
February 28, 1996. Waiver is appropriate because this filing does not
change the rate under these two Commission accepted, existing rate
schedules.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
12. Jersey Central Power & Light Company, Metropolitan Edison Company,
Pennsylvania Electric Company
[Docket No. ER96-1191-000]
Take notice that on February 27, 1996, GPU Service Corporation
(GPU), on behalf of Jersey Central Power & Light Company, Metropolitan
Edison Company and Pennsylvania Electric Company (jointly referred to
as the ``GPU Operating Companies'') filed an executed Service Agreement
between GPU and Global Petroleum Corporation (GPC), dated February 6,
1996. This Service Agreement specifies that GPC has agreed to the
rates, terms and conditions of the GPU Operating Companies' Operating
Capacity and/or Energy Sales Tariff (``Sales Tariff'') designated as
FERC Electric Tariff, Original Volume No. 1. The Sales Tariff was
accepted by the Commission by letter order issued on February 10, 1995
in Jersey Central Power & Light Co., Metropolitan Edison Co. and
Pennsylvania Electric Co., Docket No. ER95-276-000 and allows GPU and
GPC to enter into separately scheduled transactions under which the GPU
Operating Companies will make available for sale, surplus operating
capacity and/or energy at negotiated rates that are no higher than the
GPU Operating Companies' cost of service.
GPU requests a waiver of the Commission's notice requirements for
good cause shown and an effective date of February 6, 1996 for the
Service Agreement.
GPU has served copies of the filing on regulatory agencies in New
Jersey and Pennsylvania.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
13. Nevada Power Company
[Docket No. ER96-1193-000]
Take notice that on February 27, 1996, Nevada Power Company (Nevada
Power) tendered for filing a proposed Supplement to the Non-Firm Energy
Agreement between Nevada Power Company and the Colorado River
Commission (CRC) (Schedule A) having a proposed effective date of May
1, 1996.
The Supplemental Agreement provides for the sale of economy energy
to CRC during any calendar month in which CRC agrees to purchase from
Nevada Power all of its economy energy requirements. Such economy
energy is to be delivered using CRC's contractual allocation of Federal
Colorado River hydroelectric capacity. The total monthly amount of
economy energy under Schedule A shall not exceed the amount of energy
that, when added to CRC's contractual allocation of Federal
hydroelectric energy, would provide 100 percent capacity factor
utilization of these Federal hydroelectric resources.
The price of economy energy sold by Nevada Power and purchased by
CRC pursuant to Schedule A shall be at Nevada Power's Average Hourly
Marginal Cost of energy for each calendar month plus 1 mill per
kilowatt-hour. Average Hourly Marginal Cost is defined as the monthly
sum of the hourly incremental cost of the next cheapest megawatt-hour
available to generate or purchase (excluding generation at Hoover Dam)
to meet load in Nevada Power's control area divided by the number of
hours in the month.
Copies of this filing have been served on CRC and the Nevada Public
Service Commission.
[[Page 10574]]
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
14. Public Service Electric and Gas Company
[Docket No. ER96-1194-000]
Take notice that on February 27, 1996, Public Service Electric and
Gas Company (PSE&G) tendered for filing an initial rate schedule to
provide fully interruptible transmission service to Louis Dreyfus
Electric Power Inc., for delivery of non-firm wholesale electrical
power and associated energy output utilizing the PSE&G bulk power
transmission system.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
15. ANP Energy Direct Company
[Docket No. ER96-1195-000]
Take notice that on February 27, 1996, ANP Energy Direct Company
(ANP) tendered for filing a petition seeking waivers and blanket
approvals under various regulations of the Commission, and an order
accepting its FERC Electric Rate Schedule No. 1, to be effective on the
date of the Commission's order on such petition.
ANP intends to engage in electric power and energy transactions as
a marketer and a broker. In transactions where ANP purchases power,
including capacity and related services from electric utilities,
qualifying facilities, and independent power producers, and resells
such power to other purchasers, ANP will be functioning as a marketer.
In ANP's marketing transactions, ANP proposes to charge rates mutually
agreed upon by the parties. In transactions where ANP does not take
title to the electric power and/or energy, ANP's role will be limited
to that of a broker. ANP is not in the business of generating or
transmitting electric power, and does not currently have or contemplate
acquiring title to any electric power generation or transmission
facilities.
FERC Electric Rate Schedule No. 1 provides for the sale of energy
and capacity at agreed prices. Rate Schedule No. 1 also provides that
no sales may be made to affiliates.
Comment date: March 21, 1996, in accordance with Standard Paragraph
E at the end of this notice.
16. Cherokee County Cogeneration Partners, L.P.
[Docket No. QF94-160-001]
On February 16, 1996, Cherokee County Cogeneration Partners, L.P.
(Applicant), 30 Rockefeller Plaza, 38th Floor, New York, New York
10112, submitted for filing an application for certification of a
facility as a qualifying cogeneration facility pursuant to Section
292.207(b) of the Commission's Regulations. No determination has been
made that the submittal constitutes a complete filing.
According to the applicant, the topping-cycle cogeneration facility
will be located near the town of Gaffney in Cherokee County, South
Carolina, and will consist of one combustion turbine generator, one
unfired heat recovery boiler, and an extraction/condensing steam
turbine generator. Steam recovered from the facility will be used in an
ammonia refrigerant plant. Refrigerant will be used in an ice
production plant and liquified natural gas production plant. The power
output of the facility will be sold to Duke Power Company. The primary
energy source will be natural gas. The maximum net electric power
production capacity of the facility will be approximately 98.5 MW.
Construction of the facility was scheduled to begin in February, 1996.
Comment date: Thirty days after the date of publication of this
notice in the Federal Register, in accordance with Standard Paragraph E
at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 96-6118 Filed 3-13-96; 8:45 am]
BILLING CODE 6717-01-P