96-6127. NRC Bulletin 96-01, Control Rod Insertion Problems Issuance of Bulletin
[Federal Register Volume 61, Number 51 (Thursday, March 14, 1996)]
[Notices]
[Page 10601]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-6127]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
NRC Bulletin 96-01, Control Rod Insertion Problems Issuance of
Bulletin
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of issuance.
-----------------------------------------------------------------------
SUMMARY: The Nuclear Regulatory Commission (NRC) has issued Bulletin
96-01 to alert holders of pressurized water reactor (PWR) licenses
(except those licenses that have been amended to possession-only
status) to several recent events in which control rods have failed to
completely insert into the reactor core after receiving a scram signal,
and assess the operability of control rods, particularly in high burnup
fuel assemblies. It is expected that all PWR license holders will
review the information for applicability to their facilities and
consider actions, as appropriate, to avoid similar problems. However,
action is only requested from PWR license holders of Westinghouse-
designed plants. This bulletin is available in the NRC Public Document
Room under accession number 9603120001. This bulletin is discussed in
Commission information paper SECY-96-048 which is also available in the
NRC Public Document Room.
DATES: The bulletin was issued on March 8, 1996.
ADDRESSES: Not applicable.
FOR FURTHER INFORMATION CONTACT: Laurence I. Kopp, (301) 415-2879 (or
Internet:lik@nrc.gov).
SUPPLEMENTARY INFORMATION: Several recent events in domestic reactors,
as well as similar events in foreign reactors, have raised concerns
about the operability of control rods in high burnup fuel assemblies,
and may be precursors of more significant control rod binding problems
in which required shutdown margins and rod drop times may be violated.
Therefore, the NRC issued this bulletin to request that licensees
promptly inform operators of recent events in which control rods did
not fully insert and subsequently provide necessary training in
required emergency response procedures. The bulletin also requests
licensees to promptly determine the continued operability of control
rods based on current information, to measure and evaluate control rod
performance characteristics at each outage of sufficient duration
during 1996, and assess the operability and performance trend of the
rods, in particular those which do not fully insert promptly, for each
reactor trip during 1996.
Dated at Rockville, Maryland, this 8th day of March, 1996.
For the Nuclear Regulatory Commission.
Dennis M. Crutchfield,
Director, Division of Program Management, Office of Nuclear Reactor
Regulation.
[FR Doc. 96-6127 Filed 3-13-96; 8:45 am]
BILLING CODE 7590-01-P
Document Information
- Published:
- 03/14/1996
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Notice
- Action:
- Notice of issuance.
- Document Number:
- 96-6127
- Dates:
- The bulletin was issued on March 8, 1996.
- Pages:
- 10601-10601 (1 pages)
- PDF File:
-
96-6127.pdf