2014-05621. Tennessee Gas Pipeline Company, L.L.C.; Notice of Application  

  • Start Preamble

    Take notice that on February 21, 2014, Tennessee Gas Pipeline Company L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in Docket No. CP14-88-000, an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act and Part 157 of the Commission's regulations, requesting abandonment approval and a certificate of public convenience and necessity authorizing Tennessee to construct and operate its Niagara Expansion Project located in southwestern New York and northwestern Pennsylvania. Specifically, the Project consists of: (i) Installation of an approximately 3.1 miles, 30-inch diameter pipeline looping segment along Tennessee's 200 Line north of Compressor Station 224 in Chautauqua County, New York; (ii) modification of station piping at existing Compressor Station 219 in Mercer County, Pennsylvania; (iii) installation of a new pig launcher at existing Compressor Station 224 in Chautauqua County, New York, and (iv) modification of meter station facilities at the existing Hamburg Meter Station, located within Compressor Station 229 in Erie County New York, including replacement of meter tubes, installation of a filter separator, liquid storage tank, and regulation. The project will allow Tennessee to increase natural gas Start Printed Page 14504deliveries on the pipeline to provide up to an additional 158,000 dekatherms per day, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, (202) 502-8659.

    Any questions regarding this application should be directed to Jacquelyne Rocan, Assistant General Counsel, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, phone: (713) 420-4544, fax: (713) 420-1601, email: Jacquelyne_Rocan@kindermorgan.com, or Richard Siegel, Manager, Rates and Regulatory Affairs, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, phone: (713) 420-5535, fax: (713) 420-1605, email: Richard_Siegel@kindermorgan.com.

    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's FEIS or EA.

    There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.

    However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.

    Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order.

    The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426.

    There is an “eSubscription” link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Comment Date: March 28, 2014.

    Start Signature

    Dated: March 7, 2014.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2014-05621 Filed 3-13-14; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Effective Date:
3/28/2014
Published:
03/14/2014
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2014-05621
Dates:
March 28, 2014.
Pages:
14503-14504 (2 pages)
Docket Numbers:
Docket No. CP14-88-000
PDF File:
2014-05621.pdf