2019-04683. The Nevada Hydro Company, Inc. ; Notice of Tribal Consultation Meeting  

  • Start Preamble

    a. Date of Meeting: Wednesday, March 20, 2019.

    b. FERC Contact: Jim Fargo, (202) 502-6095 or james.fargo@ferc.gov.

    c. Purpose of Meeting: Commission staff will meet with the Pechanga Band of Luiseno Mission Indians (Pechanga Tribe) at 888 First Street NE, Washington DC to discuss Nevada Hydro's Corporation's application to license the proposed Lake Elsinore Advanced Pumped Storage Project No 14227.

    d. The meeting will be limited to tribal representatives of the Pechanga Tribe and the Commission's representatives. A summary of the meeting will be prepared and placed in the public record of these proceedings.

    Start Signature

    Dated: March 7, 2019.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2019-04683 Filed 3-13-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
03/14/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2019-04683
Pages:
9325-9325 (1 pages)
Docket Numbers:
Project No. 14227-003
PDF File:
2019-04683.pdf