2019-04745. Renewable Energy Aggregators; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications  

  • Start Preamble Start Printed Page 9328

    On January 10, 2019, Renewable Energy Aggregators, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Eastern Industries Pumped Storage Hydroelectric Project to be located in Lehigh County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.

    The proposed project would consist of the following: (1) A new upper reservoir with a surface area of 62 acres and a storage capacity of 929.9 acre-feet at a surface elevation of approximately 1,343 feet above mean sea level (msl) created through construction of a new roller-compacted concrete or rock-filled dam; (2) a new lower reservoir with a surface area of 22.3 acres and a total storage capacity of 1,337.9 acre-feet at a surface elevation of 1,057 feet msl; (3) a new 834-foot-long, 48-inch-diameter penstock connecting the upper and lower reservoirs; (4) a new 150-foot-long, 50-foot-wide powerhouse containing one turbine-generator unit with a total rated capacity of 20 megawatts; (5) a new transmission line connecting the powerhouse to a nearby electric grid interconnection point with options to evaluate multiple grid interconnection locations; and (6) appurtenant facilities. The proposed project would have an annual generation of 88,434 megawatt-hours.

    Applicant Contact: Adam Rousselle II, Renewable Energy Aggregators, 5710 Oak Crest Drive, Doylestown, PA 18902; phone: 215-485-1708.

    FERC Contact: Monir Chowdhury; phone: (202) 502-6736.

    Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36.

    The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-14961-000.

    More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of the Commission's website at http://www.ferc.gov/​docs-filing/​elibrary.asp. Enter the docket number (P-14961) in the docket number field to access the document. For assistance, contact FERC Online Support.

    Start Signature

    Dated: March 8, 2019.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2019-04745 Filed 3-13-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
03/14/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2019-04745
Pages:
9328-9328 (1 pages)
Docket Numbers:
Project No. 14961-000
PDF File:
2019-04745.pdf