2019-04746. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • Start Preamble

    Take notice that on February 27, 2019, ANR Pipeline Company (ANR), 700 Louisiana Street, Houston, Texas 77002-2700, filed in Docket No. CP19-102-000 a prior notice request pursuant to sections 157.205, 157.208, and 157.216 of the Commission's regulations under the Natural Gas Act (NGA) and ANR's blanket certificate issued in Docket No. CP82-480-000. ANR proposes to replace segments of its existing 22-inch mainline (Line 301), 24-inch loop line (Line 1-301), and 30-inch loop line (Line 2-301), all located in Kane County, Illinois. Due to residential housing and recreational development along discrete sections of the pipelines, ANR is required, pursuant to Part 192 of the U.S. Department of Transportation regulations, to either upgrade the pipe or lower the Maximum Allowable Operating Pressure in those sections by June 30, 2019, all as more fully set forth in the request which is on file with the Commission and open to public inspection.

    The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's website web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, (202) 502-8659.

    Any questions regarding this application should be directed to Linda Farquhar, Manager, Project Determinations & Regulatory Administration, ANR Pipeline Company, 700 Louisiana Street, Suite 700, Houston, Texas, 77002-2700, at (832) 320-5685 or fax (832) 320-6685 or linda_farquhar@transcanada.com.

    Any person or the Commission's staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA.

    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, Start Printed Page 9320within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's EA.

    Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list and will be notified of any meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission's final order.

    The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426.

    Start Signature

    Dated: March 8, 2019.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2019-04746 Filed 3-13-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
03/14/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2019-04746
Pages:
9319-9320 (2 pages)
Docket Numbers:
Docket No. CP19-102-000
PDF File:
2019-04746.Pdf