95-6309. Sunnyside Cogeneration Associates; Application for Commission Recertification of Qualifying Status of a Small Power Production Facility  

  • [Federal Register Volume 60, Number 50 (Wednesday, March 15, 1995)]
    [Notices]
    [Pages 13975-13976]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-6309]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. QF86-556-004]
    
    
    Sunnyside Cogeneration Associates; Application for Commission 
    Recertification of Qualifying Status of a Small Power Production 
    Facility
    
    March 9, 1995.
        On February 28, 1995, Sunnyside Cogeneration Associates 
    (applicant), c/o B&W Sunnyside L.P., 20 South Van Buren Avenue, 
    Barberton, OH 44203, and c/o NRG Sunnyside Inc., 1221 Nicollet Mall, 
    Suite 700, Minneapolis, MN 55403, submitted for filing an application 
    for recertification of a facility as a small power production facility 
    pursuant to Section 292.207(b) of the Commission's Regulations. No 
    determination has been made that the submittal constitutes a complete 
    filing.
        According to the applicant, the bituminous coal refuse-fueled small 
    power production facility is located at Carbon County, Utah, and 
    consists of a circulating fluidized bed boiler and an extraction/
    condensing steam turbine generating unit. the facility commenced 
    commercial operation on March 19, 1993.
        In Docket No. QF86-556-000, the applicant was granted certification 
    for a 45 MW topping-cycle cogeneration facility [39 FERC para.62,091 
    (1987)]. In [[Page 13976]] Docket No. QF86-556-001, the facility was 
    recertified to reflect a change in the steam host [49 FERC para.62,288 
    (1989)]. In Docket No. QF86-566-002, the facility was recertified to 
    reflect changes in the facility's design and an increase in the net 
    electric power production capacity to 51.1 MW [53 FERC para.62,029 
    (1990)]. In Docket No. QF86-566-003, the applicant was granted 
    recertification for a small power production facility with a maximum 
    net electric power production capacity of 52 MW. The instant 
    recertification is submitted to reflect a change in the ownership 
    structure.
        Any person desiring to be heard or objecting to the granting of 
    qualifying status should file a motion to intervene or protest with the 
    Federal Energy Regulatory Commission, 825 North Capitol Street NE., 
    Washington, DC 20426, in accordance with rules 211 and 214 of the 
    Commission's Rules of Practice and Procedure. All such motions or 
    protests must be filed within 30 days after the date of publication of 
    this notice in the Federal Register, and must be served on the 
    applicant. Protests will be considered by the Commission in determining 
    the appropriate action to be taken, but will not serve to make 
    protestants parties to the proceeding. Any person wishing to become a 
    party must file a petition to intervene. Copies of this filing are on 
    file with the Commission and are available for public inspection.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 95-6309 Filed 3-14-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
03/15/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-6309
Pages:
13975-13976 (2 pages)
Docket Numbers:
Docket No. QF86-556-004
PDF File:
95-6309.pdf