2010-5761. Drawbridge Operation Regulation; Bullards Ferry Bridge, Coquille River, Bandon, OR  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Temporary rule.

    SUMMARY:

    The Coast Guard is temporarily changing the drawbridge operation regulation for the U.S. Highway 101 Bullards Ferry Bridge that crosses over the Coquille River at mile 3.5 near Bandon, Oregon so that the vertical lift span will not need to open for ten months while the bridge is being painted. The rule is necessary to ensure that the painting operation will not be disrupted by bridge openings. The bridge has not had to be opened for a vessel in seven years.

    DATES:

    This temporary final rule is effective from May 1, 2010 until on March 1, 2011.

    ADDRESSES:

    Comments and related materials received from the public, as well as documents mentioned in this preamble as being available in the docket, are part of docket USCG-2009-0839 and are available online by going to http://www.regulations.gov,, inserting USCG-2009-0839 in the “Keyword” box, and then clicking “Search.” This material is also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this temporary rule, call or email Austin Pratt, Chief, Bridge Section, Waterways Management Branch, Thirteenth Coast Guard District; telephone 206-220-7282, e-mail william.a.pratt@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Regulatory Information

    On December 10, 2009, we published a notice of proposed rulemaking (NPRM) entitled Drawbridge Operation Regulation; Bullards Ferry Bridge, Bandon, OR, in the Federal Register (74 Start Printed Page 12687FR 65497). We received no comments on the proposed rule. No public meeting was requested, and none was held.

    Background and Purpose

    The temporary rule enables the Oregon Department of Transportation to install debris containment on the U.S. Highway 101 Bullards Ferry Bridge that crosses over the Coquille River at mile 3.5 near Bandon, Oregon, including the vertical lift towers, while it is being painted. By keeping the drawspan closed, no part of this containment system would need to be dismantled during the painting operation. This would also affect the design of the containment.

    Normally, the Coast Guard does not authorize closures of this duration. However, the vertical lift span of this bridge has not been requested to open for a vessel in more than seven years. The recreational boating traffic that plies the Coquille River is able to pass under the lift span in its closed position. The span provides approximately 28 feet of clearance at high water and 35 feet at low. When open the draw span can provide more than 45 additional feet of clearance.

    The operating regulations currently in effect for the bridge are found at 33 CFR 117.875. The regulation requires that at least two hours notice be given for all openings.

    Discussion of Comments and Changes

    No comments on this temporary rule were received and no changes were made to the rule as proposed in the NPRM.

    Regulatory Analyses

    We developed this rule after considering numerous statutes and executive orders related to rulemaking. Below we summarize our analyses based on 13 of these statutes or excutive orders.

    Regulatory Planning and Review

    This rule is not a significant regulatory action under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. The Coast Guard has made this finding based on the fact that the rule will have no known impact on the maritime public.

    Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.

    The Coast Guard certifies under 5 U.S.C. 605(b) that this proposed rule would not have a significant economic impact on a substantial number of small entities because it will have no known impact on any vessel traffic.

    Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we offered to assist small entities in understanding the rule so that they could better evaluate its effects on them and participate in the rulemaking process.

    Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.

    Collection of Information

    This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520.).

    Federalism

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.

    Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.

    Taking of Private Property

    This rule would not effect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and would not create an environmental risk to health or risk to safety that might disproportionately affect children.

    Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it would not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    Energy Effects

    We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a significant energy action under that order because it is not a significant regulatory action under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of Information and Regulatory Affairs has not designated this as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.

    Technical Standards

    The National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use Start Printed Page 12688voluntary consensus standards in their regulatory activities unless the agency provides Congress, through the Office of Management and Budget, with an explanation of why using these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies.

    This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.

    Environment

    We have analyzed this rule under Department of Homeland Security Management Directive 023-01, and Commandant Instruction M16475.lD, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that this action is one of a category of actions which do not individually or cumulatively have a significant effect on the human environment. This rule is categorically excluded under figure 2-1, paragraph (32)(e), of the Instruction.

    Under figure 2-1, paragraph (32)(e), of the Instruction, an environmental analysis checklist and a categorical exclusion determination are not required for this rule.

    Start List of Subjects

    List of Subjects in 33 CFR Part 117

    • Bridges
    End List of Subjects Start Amendment Part

    For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 117 as follows:

    End Amendment Part Start Part

    PART 117—DRAWBRIDGE OPERATION REGULATIONS

    End Part Start Amendment Part

    1. The authority citation for part 117 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 33 U.S.C. 499; 33 CFR 1.05-1; Department of Homeland Security Delegation No. 0170.1.

    End Authority Start Amendment Part

    2. From May 1, 2010 to March 1, 2011, temporarily suspend § 117.875 and temporarily add § 117.876T to read as follows:

    End Amendment Part
    Coquille River.

    The draws of the U.S. 101 highway bridge, mile 3.5 at Bandon, Oregon, need not open for the passage of vessels from May 1, 2010 to March 1, 2011.

    Start Signature

    Dated: March 2, 2010.

    G.T. Blore,

    Rear Admiral, U.S. Coast Guard, Commander, Thirteenth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2010-5761 Filed 3-16-10; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
5/1/2010
Published:
03/17/2010
Department:
Coast Guard
Entry Type:
Rule
Action:
Temporary rule.
Document Number:
2010-5761
Dates:
This temporary final rule is effective from May 1, 2010 until on March 1, 2011.
Pages:
12686-12688 (3 pages)
Docket Numbers:
Docket No. USCG-2009-0839
RINs:
1625-AA09: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
Topics:
Bridges
PDF File:
2010-5761.pdf
CFR: (1)
33 CFR 117.876T