2014-05100. Approval and Promulgation of Air Quality Implementation Plans; Texas; Stage II Vapor Recovery Program and Control of Air Pollution From Volatile Organic Compounds  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule.

    SUMMARY:

    The Environmental Protection Agency (EPA) is approving revisions to the Texas State Implementation Plan (SIP) that control emissions of volatile organic compounds (VOCs) at gasoline dispensing facilities (GDFs) in Texas. The revisions were submitted to the EPA by the Texas Commission on Environmental Quality (TCEQ) on October 31, 2013 and address the maintenance and removal of Stage II vapor recovery equipment at GDFs. The EPA is also approving related revisions to the Stage II SIP narrative that pertain to the maintenance and removal of Stage II vapor recovery equipment and demonstrate that the absence of Stage II equipment in the Beaumont-Port Arthur (BPA), Dallas-Fort Worth (DFW) and Houston-Galveston Brazoria (HGB) areas, and in El Paso County would not interfere with attainment of the national ambient air quality standards, reasonable further progress or any other requirement of the Clean Air Act (CAA or Act). The EPA is approving these revisions pursuant to sections 110 and 202 of the Act and consistent with the EPA's guidance.

    DATES:

    This final rule is effective on April 16, 2014.

    ADDRESSES:

    EPA has established a docket for this action under Docket ID No. EPA-R06-OAR-2013-0439. All documents in the docket are listed on the http://www.regulations.gov Web site. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through http://www.regulations.gov or in hard copy at the Air Planning Section (6PD-L), Environmental Protection Agency, 1445 Ross Avenue, Suite 700, Dallas, Texas 75202-2733. To inspect the hard copy materials, please schedule an appointment with the person listed in the FOR FURTHER INFORMATION CONTACT paragraph below or Mr. Bill Deese at 214-665-7253.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Carrie Paige, Air Planning Section (6PD-L); telephone (214) 665-6521; email address paige.carrie@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Throughout this document, “we,” “us,” and “our” means EPA.

    Table of Contents

    I. Background

    II. Final Action

    III. Statutory and Executive Order Reviews

    I. Background

    The background for today's final rule is discussed in our December 30, 2013 proposal to approve revisions to the Texas SIP (78 FR 79340). In that action, we proposed to approve the Texas SIP revisions submitted by the TCEQ on October 31, 2013, which specify that new GDFs would not be required to install Stage II equipment and provide removal (decommissioning) procedures that existing GDFs in the 16 counties [1] must complete by August 31, 2018. The revisions to the Stage II SIP describe the removal of Stage II equipment at GDFs and require maintenance of the Stage II equipment until decommissioning occurs. The revisions to the SIP narrative also include a demonstration that the removal of, or failure to install, Stage II equipment in the 16 counties is consistent with section 110(l) of the Act which precludes approval of revisions to the SIP that contribute to nonattainment or interfere with maintenance of any National Ambient Air Quality Standard.

    Our December 30, 2013 proposal provides a detailed description of the revisions and the rationale for EPA's proposed actions, together with a Start Printed Page 14612discussion of the opportunity to comment. The public comment period for these actions closed on January 29, 2014. See the Technical Support Document in the docket for this rulemaking and our proposal at 78 FR 79340 for more information. We did not receive any comments regarding our proposal. Therefore, we are finalizing our action as proposed.

    II. Final Action

    The EPA is approving revisions to the Texas SIP that control emissions of VOCs and pertain to the maintenance and removal of Stage II vapor recovery equipment submitted on October 31, 2013. We are approving revisions to the following sections within 30 TAC 115: 115.240, 115.241, 115.242, 115.243, 115.244, 115.245, 115.246, 115.247, and 115.249. The EPA is also approving related revisions to the Stage II SIP narrative that address the maintenance and removal of Stage II equipment, and demonstrate that the removal of, or failure to install Stage II equipment in the BPA, DFW, and HGB areas, and in El Paso County, meets section 110(l) of the Act. The EPA is approving these revisions in accordance with sections 110 and 202 of the Act and consistent with the EPA's guidance.

    III. Statutory and Executive Order Reviews

    Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    • Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);
    • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
    • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
    • Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
    • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
    • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
    • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
    • Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
    • Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

    In addition, this rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the SIP is not approved to apply in Indian country located in the state, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law.

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by May 16, 2014. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposed of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Incorporation by reference
    • Intergovernmental relations
    • Ozone
    • Reporting and recordkeeping requirements
    • Volatile organic compounds
    End List of Subjects Start Signature

    Dated: February 25, 2014.

    Ron Curry,

    Regional Administrator, Region 6.

    End Signature

    40 CFR part 52 is amended as follows:

    Start Part

    PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

    End Part Start Amendment Part

    1. The authority citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority

    Subpart SS—Texas

    Start Amendment Part

    2. In § 52.2270:

    End Amendment Part Start Amendment Part

    a. In paragraph (c) the table titled “EPA Approved Regulations in the Texas SIP” is amended by revising the entries for Sections 115.240—115.247 and Section 115.249.

    End Amendment Part Start Amendment Part

    b. In paragraph (e) the second table titled “EPA Approved Nonregulatory Provisions and Quasi-Regulatory Measures in the Texas SIP” is amended by adding a new entry to the end of the table for “Stage II Vapor Recovery Program SIP.”

    End Amendment Part

    The revisions and additions read as follows:

    Identification of plan.
    * * * * *

    (c) * * *

    Start Printed Page 14613

    EPA Approved Regulations in the Texas SIP

    State citationTitle/subjectState approval/submittal dateEPA approval dateExplanation
    *         *         *         *         *          *         *
    Section 115.240Stage II Vapor Recovery Definitions and List of California Air Resources Board Certified Stage II Equipment10/9/20133/17/14 [Insert FR page number where document begins]
    Section 115.241Emission Specifications10/9/20133/17/14 [Insert FR page number where document begins]
    Section 115.242Control Requirements10/9/20133/17/14 [Insert FR page number where document begins]
    Section 115.243Alternate Control Requirements10/9/20133/17/14 [Insert FR page number where document begins]
    Section 115.244Inspection Requirements10/9/20133/17/14 [Insert FR page number where document begins]
    Section 115.245Testing Requirements10/9/20133/17/14 [Insert FR page number where document begins]
    Section 115.246Recordkeeping Requirements10/9/20133/17/14 [Insert FR page number where document begins]
    Section 115.247Exemptions10/9/20133/17/14 [Insert FR page number where document begins]
    *         *         *         *         *          *         *
    Section 115.249Counties and Compliance Schedules10/9/20133/17/14 [Insert FR page number where document begins]
    *         *         *         *         *          *         *
    * * * * *

    (e) * * *

    EPA Approved Nonregulatory Provisions and Quasi-Regulatory Measures in the Texas SIP

    Name of SIP provisionApplicable geographic or non-attainment areaState submittal/effective dateEPA approval dateComments
    *         *         *         *         *          *         *
    Stage II Vapor Recovery Program SIPStatewide10/9/20133/17/14 [Insert FR page number where document begins]
    End Supplemental Information

    Footnotes

    1.  The four areas in Texas where Stage II is required comprise 16 counties: BPA, containing Hardin, Jefferson and Orange counties; DFW, involving Collin, Dallas, Denton and Tarrant counties; El Paso County; and HGB, containing Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery, and Waller counties.

    Back to Citation

    [FR Doc. 2014-05100 Filed 3-14-14; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
4/16/2014
Published:
03/17/2014
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
2014-05100
Dates:
This final rule is effective on April 16, 2014.
Pages:
14611-14613 (3 pages)
Docket Numbers:
EPA-R06-OAR-2013-0439, FRL-9907-55-Region 6
Topics:
Air pollution control, Environmental protection, Incorporation by reference, Intergovernmental relations, Ozone, Reporting and recordkeeping requirements, Volatile organic compounds
PDF File:
2014-05100.pdf
Supporting Documents:
» TX151.06 EPA Technical Support Document. 21 pages tzw
» TX151.05 Texas Revisions to 30 TAC Chapter 115, Control of Air Pollution from Volatile Organic Compounds, RE: Stage II Vapor Recovery Decommissioning Rulemaking, submitted to EPA October 31, 2013 (TX-349, 5-93). 114 pages 4.1 MB tzx
» TX151.04 Texas Revisions to Texas Stage II Vapor Recovery Program State Implementation Plan, submitted to EPA October 31, 2013 (TX-348, SIP). 289 pages 17.3 MB tzw
» TX151.03 Texas Revisions to 30 TAC Chapter 115, Control of Air Pollution from Volatile Organic Compounds, RE: Stage II Vapor Recovery Rule Revisions -- Amendments to §115.247, Exemptions, submitted to EPA July 25, 2007 (TX-251, 5-86). 52 pages 1.3 MB tzw
» TX151.02 Texas Revisions to 30 TAC Chapter 115, Control of Air Pollution form Volatile Organic Compounds, and Revisions to Texas Stage II Vapor Recovery Program State Implementation Plan, RE: Gasoline Stage I and Stage II Vapor Control Rules and SIP, subm
CFR: (1)
40 CFR 52.2270