-
Start Preamble
March 12, 2009.
The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 U.S.C. 552b:
Agency Holding Meeting:
Federal Energy Regulatory Commission.
Date and Time:
March 19, 2009. 10 a.m.
Place:
Room 2C, 888 First Street, NE., Washington, DC 20426.
Status:
Open.
Matters to be Considered:
Agenda.
* Note—
Items listed on the agenda may be deleted without further notice.
Contact Person for More Information:
Kimberly D. Bose, Secretary, Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.
Start Signature946th—Meeting
Item No. Docket No. Company Administrative A-1 AD02-1-000 Agency Administrative Matters. A-2 AD02-7-000 Customer Matters, Reliability, Security and Market Operations. Electric E-1 OMITTED. E-2 OMITTED. E-3 RM05-17-004, RM05-25-004 Preventing Undue Discrimination and Preference in Transmission Service. E-4 RM05-5-013 Standards for Business Practices and Communication Protocols for Public Utilities. E-5 RM08-19-000, RM09-5-000, RM06-16-005 Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System. E-6 RM06-22-000 Mandatory Reliability Standards for Critical Infrastructure Protection. E-7 OMITTED. E-8 RM06-8-002 Long-Term Firm Transmission Rights in Organized Electricity Markets. E-9 RM08-11-000 Version Two Facilities Design, Connections and Maintenance Reliability Standards. E-10 EL03-180-035 Enron Power Marketing, Inc. and Enron Energy Services, Inc. EL03-154-028 Enron Power Marketing, Inc. and Enron Energy Services, Inc. EL02-114-029 Portland General Electric Company. EL02-115-033 Enron Power Marketing, Inc. EL02-113-031 El Paso Electric Company, Enron Power Marketing, Inc., Enron Capital and Trade Resource Corp. E-11 EC08-111-000 Franklin Resources, Inc. and its Investment Management Subsidiaries and Applicant Funds. E-12 OMITTED. E-13 ER08-1569-001 PJM Interconnection, L.L.C. E-14 ER08-1065-001 PJM Interconnection, L.L.C. E-15 OA08-5-003 Southwest Power Pool, Inc. E-16 OA08-5-001, OA08-5-002 Southwest Power Pool, Inc. E-17 EL06-80-004 Michigan Public Power Agency v. Midwest Independent Transmission System Operator, Inc. E-18 EL00-95-000, EL00-98-000 San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange Corporation, Investigation of Practices of the California Independent System Operator Corporation and California Power Exchange Corporation. Start Printed Page 11537 E-19 ER07-869-003, ER07-475-004, ER06-615-029 California Independent System Operator Corporation. E-20 EL03-152-007 Duke Energy Trading and Marketing, L.L.C. EL03-141-005, EL03-141-006 Bonneville Power Administration. EL03-143-004 California Power Exchange. EL03-144-004 Cargill-Alliant, L.L.C. EL03-145-005 City of Anaheim, California. EL03-146-006 City of Azusa, California. EL03-147-007 City of Glendale, California. EL03-148-004 City of Pasadena, California. EL03-150-006 City of Riverside, California. EL03-151-007 Coral Power, L.L.C. EL03-153-007 Dynegy Power Marketing, Inc., Dynegy Power Corporation, El Segundo Power L.L.C., Long Beach Generation L.L.C., Cabrillo Power I, L.L.C., and Cabrillo Power II, L.L.C. EL03-154-029 Enron Power Marketing, Inc. and Enron Energy Services, Inc. EL03-155-004 FP&L Energy. EL03-157-005 Los Angeles Department of Water and Power. EL03-161-004 Northern California Power Agency. EL03-164-004 PGE Energy Services. EL03-167-006 Public Service Company of Colorado. EL03-168-005, EL03-168-006 Public Service Company of New Mexico. EL03-171-004, EL03-171-005 Salt River Project Agricultural Improvement and Power District. EL03-174-004 Sierra Pacific Power Company. EL03-176-005 TransAlta Energy Marketing (U.S.), Inc. and TransAlta Energy Marketing (California), Inc. EL03-177-005, EL03-177-006 Tucson Electric Power Company. EL03-178-004, EL03-178-005 Western Area Power Administration. EL03-137-010 American Electric Power Services Corporation. EL03-138-009 Aquila Merchant Services, Inc. EL03-139-007, EL03-139-008 Arizona Public Service, Inc. EL03-140-004, EL03-140-005 Automated Power Exchange, Inc. EL03-142-004 California Department of Water Resources. EL03-149-006 City of Redding, California. EL03-156-007 Idaho Power Company. EL03-158-007 Mirant Americas Energy Marketing, L.P., Mirant California, L.L.C., Mirant Delta, L.L.C. and Mirant Potrero, L.L.C. EL03-159-007 Modesto Irrigation District. EL03-160-006 Morgan Stanley Capital Group. EL03-162-003, EL03-162-004 Pacific Gas and Electric Company. EL03-163-006 PacifiCorp. EL03-165-009, EL03-165-010 Portland General Electric Company. EL03-166-008 Powerex Corporation (f/k/a British Columbia Power Exchange Corporation). EL03-169-006, EL03-169-007 Puget Sound Energy, Inc. EL03-170-007 Reliant Resources, Inc. Reliant Energy Power Generation, and Reliant Energy Services, Inc. EL03-172-004, EL03-172-005 San Diego Gas & Electric Company. EL03-173-007 Sempra Energy Trading Corporation. EL03-175-004, EL03-175-005 Southern California Edison Company. EL03-179-008 Williams Energy Services Corporation. EL03-180-039 Enron Power Marketing, Inc. and Enron Energy Services, Inc. EL03-181-010 Aquila, Inc. EL03-182-009 City of Glendale, California. EL03-183-005 City of Redding, California. EL03-184-006 Colorado River Commission. EL03-185-006 Constellation Power Source, Inc. EL03-186-008 Coral Power, L.L.C. EL03-187-008 El Paso Merchant Energy, L.P. EL03-188-007 Eugene Water and Electricity Board. EL03-189-009 Idaho Power Company. EL03-190-006 Koch Energy Trading, Inc. EL03-191-005 Las Vegas Cogeneration, L.P. EL03-192-006 MIECO. EL03-193-008 Modesto Irrigation District. EL03-194-005 Montana Power Company. EL03-195-007 Morgan Stanley Capital Group. EL03-196-008 Northern California Power Agency. EL03-197-009 PacifiCorp. EL03-198-006 PEPCO. EL03-199-008 Powerex Corporation (f/k/a British Columbia Power Exchange Corporation). EL03-200-008, EL03-200-009 Public Service Company of New Mexico. EL03-201-009 Sempra Energy Trading Corporation. Start Printed Page 11538 EL03-202-007 TransAlta Energy Marketing (U.S.), Inc. and TransAlta Energy Marketing (California), Inc. EL03-203-005 Valley Electric Association, Inc. EL02-114-030 Portland General Electric Company. EL02-115-034 Enron Power Marketing, Inc. E-21 RM08-7-000, RM08-7-001 Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards. E-22 PL09-4-000 Smart Grid Policy. Gas G-1 RP09-3-000, P09-7-000, RP09-7-001, RP09-7-002 Texas Gas Transmission, LLC. G-2 RP08-426-000 El Paso Natural Gas Company. G-3 OMITTED. Hydro H-1 P-13164-001 Bangor Water District. H-2 P-2082-053 PacifiCorp. Certificates C-1 CP08-431-000 Columbia Gas Transmission Corporation. C-2 CP05-130-000, CP05-130-001, CP05-130-002, CP05-130-003, CP05-130-005, CP05-132-000, CP05-132-001, CP05-132-002, CP05-132-004, CP05-395-000, CP05-395-001, CP05-395-004 Dominion Cove Point, LNG., LP. CP05-131-000, CP05-131-001, CP05-131-002, CP05-131-004 Dominion Transmission, Inc. C-3 CP08-104-000 Southern Natural Gas Company. C-4 CP08-441-000 CenterPoint Energy Gas Transmission Company. CP08-444-000 Texas Eastern Transmission, LP. C-5 OMITTED. C-6 CP09-1-000 Collbran Valley Gas Gathering, LLC. C-7 CP09-19-000 Port Barre Investments, L.L.C. d/b/a/ Bobcat Gas Storage. C-8 CP06-398-001 MoBay Storage Hub, LLC. Kimberly D. Bose,
Secretary.
A free Web cast of this event is available through http://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to http://www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its Web cast. The Capitol Connection provides technical support for the free Web casts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.
End Preamble[FR Doc. E9-5770 Filed 3-17-09; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 03/18/2009
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- E9-5770
- Pages:
- 11536-11538 (3 pages)
- EOCitation:
- of 2009-03-12
- PDF File:
- e9-5770.pdf