    DoD is proposing to amend the Defense Federal Acquisition Regulation Supplement (DFARS) to update and clarify the requirements for multiyear contracting. No statutory changes are incorporated in this proposed rule.

    DATES:

    Comments on the proposed rule should be submitted in writing to the address shown below on or before May 2, 2011, to be considered in the formation of the final rule.

    ADDRESSES:

    Submit comments identified by DFARS Case 2009-D026, using any of the following methods:

    Regulations.gov: http://www.regulations.gov. Follow the instructions for submitting comments.

    E-mail: dfars@osd.mil. Include DFARS Case 2009-D026 in the subject line of the message.

    Fax: (703) 602-0350.

    Mail: Defense Acquisition Regulations System, Attn: Manual Quinones, OUSD (AT&L) DPAP (DARS), Room 3B855, 3060 Defense Pentagon, Washington, DC 20301-3060.

    Comments received generally will be posted without change to http://www.regulations.gov, including any personal information provided. To confirm receipt of your comment(s), please check http://www.regulations.gov approximately two to three days after submission to verify posting (except allow 30 days for posting of comments submitted by mail).

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Manual Quinones, Telephone (703) 602-1302.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    This DFARS case was initiated by DoD based on an internal DoD policy decision to perform a comprehensive review of DFARS subpart 217.1, Multiyear Contracting to update and clarify the requirements relating to multiyear contracting. This effort includes reorganizing existing coverage for multiyear acquisitions, such as the co-location of basic congressional notification requirements under 217.170, General. Additionally, the contents of 217.173, Multiyear contracts for weapons systems and 217.174, Multiyear contracts that employ economic order quantity procurement, are merged into 217.170, General, and 217.172, Multiyear contracts for supplies. The requirements governing multiyear contracts for military family housing, currently at 217.171(b), are separated out and highlighted as a new section 217.173, entitled “Multiyear contracting for military family housing.” Citations to the United States Code, relevant DoD regulations, and the Federal Acquisition Regulation have been updated. No changes to existing DoD policy, including implementation of any statutorily mandated acquisition-related thresholds, are being made in this rule.

    II. Executive Order 12866

    This rule was not subject to Office of Management and Budget review under Executive Order 12866, dated September 30, 1993. This rule is not a major rule under 5 U.S.C. 804.

    III. Regulatory Flexibility Act

    DoD does not expect this rule to have an economic impact on small entities within the meaning of the Regulatory Flexibility Act, 5 U.S.C. 601, et seq., because the rule does not change the existing requirements of subpart 217.1. Further, these requirements are primarily internal procedures for DoD. Therefore, DoD has not performed an initial regulatory flexibility analysis.

    DoD invites comments from small business concerns and other interested parties on the expected impact of this rule on small entities.

    DoD will also consider comments from small entities concerning the existing regulations in subparts affected by this rule in accordance with 5 U.S.C. 610. Interested parties must submit such comments separately and should cite 5 U.S.C. 610 (DFARS Case 2009-D026) in correspondence.

    IV. Paperwork Reduction Act

    This rule does not impose any information collection requirements that require the approval of the Office of Management and Budget under the Paperwork Reduction Act (44 U.S.C. chapter 35).

    Start List of Subjects

    List of Subjects in 48 CFR Part 217

    • Government procurement
    End List of Subjects Start Signature

    Mary Overstreet,

    Editor, Defense Acquisition Regulations System.

    End Signature

    Therefore, 48 CFR part 217 is proposed to be amended as follows:

    Start Part

    PART 217—SPECIAL CONTRACTING METHODS

    1. The authority citation for 48 CFR part 217 continues to read as follows:

    Start Authority

    Authority: 41 U.S.C. 1303 and 48 CFR chapter 1.

    End Authority

    2. Section 217.170 is amended by—

    a. Redesignating paragraphs (a), (b), (c), (d), and (e) as paragraphs (b), (c), (d), (e), and (f), respectively;

    b. Adding a new paragraph (a);

    c. Amending redesignated paragraph (b) by removing “Public Law 105-56” and adding in its place “Pub. L. 105-56,” and removing “Section” and adding in its place “section”;

    d. Amending redesignated paragraph (c) by removing “217.172(f)(2)” and adding in its place “217.172(g)(2)”;

    e. Revising redesignated paragraph (d); and

    f. Revising redesignated paragraph (f).

    The additions and revisions read as follows:

    General.

    (a) This section explains the general rules that are common to all multiyear contracts.

    * * * * *

    (d) The head of the agency must provide written notice to the congressional defense committees at least 10 days before termination of any multiyear contract (10 U.S.C. 2306b(1)(6), 10 U.S.C. 2306c(d)(3), section 8008(a) of Pub. L. 105-56, and similar sections in subsequent DoD appropriations acts).

    * * * * *

    (f)(1) DoD must provide notification to the congressional defense committees at least 30 days before entering into a multiyear contract for certain procurements, including those expected to—

    (i) Employ an unfunded contingent liability in excess of $20 million (see 10 U.S.C. 2306b(1)(1)(B)(i)(II), 10 U.S.C. 2306(d)(1), and section 8008(a) of Pub. Start Printed Page 11412L. 105-56 and similar sections in subsequent DoD appropriations acts);

    (ii) Employ economic-order-quantity procurement in excess of $20 million in any one year of the contract (see 10 U.S.C. 2306b(1)(1)(B)(i)(I));

    (iii) Involve a contract for advance procurement leading to a multiyear contract that employs economic order quantity procurement in excess of $20 million in any one year (see 10 U.S.C. 2306b(1)(1)(B)(ii) and section 8008(a) of Pub. L. 105-56 and similar sections in subsequent DoD appropriations acts); or

    (iv) Include a cancellation ceiling in excess of $100 million (see 10 U.S.C. 2306c(d)(4), 10 U.S.C. 2306b(g), and section 8008(a) of Pub. L. 105-56 and similar sections in subsequent DoD appropriations acts).

    (2) A DoD component must submit a request for authority to enter into a multiyear contract described in paragraphs (f)(1)(i) through (iv) of this section as part of the component's budget submission for the fiscal year in which the multiyear contract will be initiated. DoD will include the request, for each candidate it supports, as part of the President's Budget for that year and in the Appendix to that budget as part of proposed legislative language for the appropriations bill for that year (section 8008(b) of Pub. L. 105-56).

    (3) If the advisability of using a multiyear contract becomes apparent too late to satisfy the requirements in paragraph (f)(2) of this section, the request for authority to enter into a multiyear contract must be—

    (i) Formally submitted by the President as a budget amendment; or

    (ii) Made by the Secretary of Defense, in writing, to the congressional defense committees (section 8008(b) of Pub. L. 105-56).

    (4) Agencies must establish reporting procedures to meet the congressional notification requirements of paragraph (f)(1) of this section. The head of the agency must submit a copy of each notice to the Director of Defense Procurement and Acquisition Policy, Office of the Under Secretary of Defense (Acquisition, Technology, and Logistics) (OUSD (AT&L) DPAP) and to the Deputy Under Secretary of Defense (Comptroller) (Program/Budget) (OUSD(C)(P/B)).

    (5) If the budget for a contract that contains a cancellation ceiling in excess of $100 million does not include proposed funding for the costs of contract cancellation up to the cancellation ceiling established in the contract—

    (i) The notification required by paragraph (f)(1) of this section shall include—

    (A) The cancellation ceiling amounts planned for each program year in the proposed multiyear contract, together with the reasons for the amounts planned;

    (B) The extent to which costs of contract cancellation are not included in the budget for the contract; and

    (C) A financial risk assessment of not including budgeting for costs of contract cancellation (10 U.S.C. 2306b(g) and 10 U.S.C. 2306c(d)); and

    (ii) The head of the agency shall provide copies of the notification to the Office of Management and Budget at least 14 days before contract award.

    3. Section 217.171 is revised to read as follows:

    Multiyear contracts for services.

    (a) The head of the agency may enter into a multiyear contract for a period of not more than five years for the following types of services (and items of supply relating to such services), even though funds are limited by statute to obligation only during the fiscal year for which they were appropriated (10 U.S.C. 2306c). Covered services are—

    (1) Operation, maintenance, and support of facilities and installations;

    (2) Maintenance or modification of aircraft, ships, vehicles, and other highly complex military equipment;

    (3) Specialized training requiring high-quality instructor skills (e.g., training for pilots and aircrew members or foreign language training);

    (4) Base services (e.g., ground maintenance, in-plane refueling, bus transportation, and refuse collection and disposal); and

    (5) Environmental remediation services for—

    (i) An active military installation;

    (ii) A military installation being closed or realigned under a base closure law as defined in 10 U.S.C. 2667(h)(2); or

    (iii) A site formerly used by DoD.

    (b) The head of the agency must be guided by the following principles when entering into a multiyear contract for services:

    (1) The portion of the cost of any plant or equipment amortized as a cost of contract performance should not exceed the ratio between the period of contract performance and the anticipated useful commercial life of the plant or equipment. As used in this section, “useful commercial life” means the commercial utility of the facilities rather than the physical life, with due consideration given to such factors as the location, specialized nature, and obsolescence of the facilities.

    (2) Consider the desirability of obtaining an option to extend the term of the contract for a reasonable period not to exceed three years at prices that do not include charges for plant, equipment, or other nonrecurring costs already amortized.

    (3) Consider the desirability of reserving the right to take title, under the appropriate circumstances, to the plant or equipment upon payment of the unamortized portion of the cost.

    (c) Before entering into a multiyear contract for services, the head of the agency must make a written determination that—

    (1) There will be a continuing requirement for the services consistent with current plans for the proposed contract period;

    (2) Furnishing the services will require—

    (i) A substantial initial investment in plant or equipment; or

    (ii) The incurrence of substantial contingent liabilities for the assembly, training, or transportation of a specialized work force; and

    (3) Using a multiyear contract will promote the best interests of the United States by encouraging effective competition and promoting economies in operations.

    4. Section 217.172 is revised to read as follows:

    Multiyear contracts for supplies.

    (a) This section applies to all multiyear contracts for supplies, including weapon systems and other multiyear acquisitions specifically authorized by law (10 U.S.C. 2306b).

    (b) The head of the agency may enter into a multiyear contract for supplies if, in addition to the conditions listed in FAR 17.105-1(b), the use of such a contract will promote the national security of the United States (10 U.S.C. 2306b(a)(6)).

    (c) Multiyear contracts in amounts exceeding $500 million must be specifically authorized by law (10 U.S.C. 2306b and 10 U.S.C. 2306c). A multiyear supply contract may be authorized by an appropriations act or a law other than an appropriations act (10 U.S.C. 2306b(i)(3) and (1)(3)).

    (d) The head of the agency shall not enter into a multiyear contract unless—

    (1) The Secretary of Defense has submitted to Congress a budget request for full funding of units to be procured through the contract; and

    (2) In the case of a contract for procurement of aircraft, the budget request includes full funding of procurement funds for production beyond advance procurement activities of aircraft units to be produced in the fiscal year covered by the budget.

    (e)(1) The head of the agency must not enter into or extend a multiyear contract Start Printed Page 11413that exceeds $500 million (when entered into or extended until the Secretary of Defense identifies the contract and any extension in a report submitted to the congressional defense committees (10 U.S.C. 2306b(1)(5)).

    (2) In addition, for contracts equal to or greater than $500 million, the head of the contracting activity must determine that the conditions required by paragraphs (g)(2)(i) through (vii) of this section will be met by such contract, in accordance with the Secretary's certification and determination required by paragraph (g)(2) of this section (10 U.S.C. 2306b(a)(1)(7)).

    (f) The head of the agency may enter into a multiyear contract for—

    (1) A weapon system and associated items, services, and logistics support for a weapon system; and

    (2) Advance procurement of components, parts, and materials necessary to manufacture a weapon system, including advance procurement to achieve economic lot purchases or more efficient production rates (see 217.172(g)(4) and (5) regarding economic order quantity procurements). Before initiating an advance procurement, the contracting officer must verify that it is consistent with DoD policy (e.g., the full funding policy in Volume 2A, chapter 1, of DoD 7000.14-R, Financial Management Regulation).

    (g) The head of the agency shall ensure that the following conditions are satisfied before awarding a multiyear contract under the authority described in paragraph (b) of this section:

    (1) The multiyear exhibits required by DoD 7000.14-R, Financial Management Regulation, are included in the agency's budget estimate submission and the President's budget request.

    (2) The Secretary of Defense certifies to Congress in writing, by no later than March 1 of the year in which the Secretary requests legislative authority to enter into such contracts, that each of the conditions in paragraphs (g)(2)(i) through (vii) of this section is satisfied (10 U.S.C. 2306b(i)(1)(A) through (G)).

    (i) The Secretary has determined that each of the requirements in FAR 17.105, paragraphs (b)(1) through (b)(5) will be met by such contract and has provided the basis for such determination to the congressional defense committees (10 U.S.C. 2306b(i)(1)(A)).

    (ii) The Secretary's determination under paragraph (g)(2)(i) of this section was made after the completion of a cost analysis performed by the Defense Cost and Resource Center of the Department of Defense and such analysis supports the findings (10 U.S.C. 2306b(i)(1)(B)).

    (iii) The system being acquired pursuant to such contract has not been determined to have experienced cost growth in excess of the critical cost growth threshold pursuant to 10 USC 2433(d) within five years prior to the date the Secretary anticipates such contract (or a contract for advance procurement entered into consistent with the authorization for such contract) will be awarded (10 U.S.C. 2306b(i)(1)(C)).

    (iv) A sufficient number of end items of the system being acquired under such contract have been delivered at or within the most current estimates of the program acquisition unit cost or procurement unit cost for such system to determine that current estimates of such unit costs are realistic (10 U.S.C. 2306b(i)(1)(D)).

    (v) Sufficient funds will be available in the fiscal year in which the contract is to be awarded to perform the contract, and the future-years defense program for such fiscal year will include the funding required to execute the program without cancellation (10 U.S.C. 2306b(i)(1)(E)).

    (vi) The contract is a fixed price type contract (10 U.S.C. 2306b(i)(1)(F)).

    (vii) The proposed multiyear contract provides for production at not less than minimum economic rates, given the existing tooling and facilities. The head of the agency shall submit to USD(C)(P/B) information supporting the agency's determination that this requirement has been met (10 U.S.C. 2306b(i)(1)(G)).

    (viii) The head of the agency shall submit information supporting this certification to USD(C)(P/B) for transmission to Congress through the Secretary of Defense.

    (A) The head of the agency shall, as part of this certification, give written notification to the congressional defense committees of—

    (1) The cancellation ceiling amounts planned for each program year in the proposed multiyear contract, together with the reasons for the amounts planned;

    (2) The extent to which costs of contract cancellation are not included in the budget for the contract; and

    (3) A financial risk assessment of not including the budgeting for costs of contract cancellation (10 U.S.C. 2306b(g)); and

    (B) The head of the agency shall provide copies of the notification to the Office of Management and Budget at least 14 days before contract award.

    (3) The contract is for the procurement of a complete and usable end item (10 U.S.C. 2306b(i)(4)(A)).

    (4) Funds appropriated for any fiscal year for advance procurement are obligated only for the procurement of those long-lead items that are necessary in order to meet a planned delivery schedule for complete major end items that are programmed under the contract to be acquired with funds appropriated for a subsequent fiscal year (including an economic order quantity of such long-lead items when authorized by law (10 U.S.C. 2306b(i)(4)(B)).

    (5) The Secretary may make the certification under paragraph (g)(2) of this section notwithstanding the fact that one or more of the conditions of such certification are not met if the Secretary determines that, due to exceptional circumstances, proceeding with a multiyear contract under this section is in the best interest of the Department of Defense and the Secretary provides the basis for such determination with the certification (10 U.S.C. 2306b(i)(5)).

    (6) The Secretary of Defense may not delegate this authority to make the certification under paragraph (g)(2) of this section or the determination under paragraph (g)(5) of this section to an official below the level of the Under Secretary of Defense for Acquisition, Technology, and Logistics (10 U.S.C. 2306b(i)(6)).

    (7) The Secretary of Defense shall send a notification containing the findings of the agency head under FAR 17.105(b), and the basis for such findings, 30 days prior to the award of a multiyear contract or a defense acquisition program that has been specifically authorized by law (10 U.S.C. 2306b(i)(7)).

    (8) All other requirements of law are met and there are no other statutory restrictions on using a multiyear contract for the specific system or component (10 U.S.C. 2306b(i)(2)). One such restriction may be the achievement of specified cost savings. If the agency finds, after negotiations with the contractor(s), that the specified savings cannot be achieved, the head of the agency shall assess the savings that, nevertheless, could be achieved by using a multiyear contract. If the savings are substantial, the head of the agency may request relief from the law's specific savings requirement. The request shall—

    (i) Quantify the savings that can be achieved;

    (ii) Explain any other benefits to the Government of using the multiyear contract;

    (iii) Include details regarding the negotiated contract terms and conditions; and

    (iv) Be submitted to OUSD(AT&L)DPAP for transmission to Congress via the Secretary of Defense and the President.Start Printed Page 11414

    (h) The Secretary of Defense may instruct the head of the agency proposing a multiyear contract to include in that contract negotiated priced options for varying the quantities of end items to be procured over the life of the contract (10 U.S.C. 2306b(j)).

    5. Section 217.173 is revised to read as follows:

    Multiyear contracts for military family housing.

    The head of the agency may enter into multiyear contracts for periods up to four years for supplies and services required for management, maintenance, and operation of military family housing and may pay the costs of such contracts for each year from annual appropriations for that year (10 U.S.C. 2829).

    [Removed]

    6. Section 217.174 is removed.

    End Part End Supplemental Information

    [FR Doc. 2011-4525 Filed 3-1-11; 8:45 am]

    BILLING CODE 5001-08-P

Document Information

Published:
03/02/2011
Department:
Defense Acquisition Regulations System
Entry Type:
Proposed Rule
Action:
Proposed rule.
Document Number:
2011-4525
Dates:
Comments on the proposed rule should be submitted in writing to
Pages:
11411-11414 (4 pages)
RINs:
0750-AG89
Topics:
Government procurement
PDF File:
2011-4525.pdf
CFR: (5)
48 CFR 217.170
48 CFR 217.171
48 CFR 217.172
48 CFR 217.173
48 CFR 217.174