2023-04314. Commission Information Collection Activities (FERC-725T); Comment Request; Extension  

  • Start Preamble

    AGENCY:

    Federal Energy Regulatory Commission, Department of Energy.

    ACTION:

    Notice of information collection and request for comments.

    Start Printed Page 13112

    SUMMARY:

    In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725T, Mandatory Reliability Standards for the Bulk-Power System: Texas Reliability Entity (TRE) Reliability Standards.

    DATES:

    Comments on the collection of information are due May 1, 2023.

    ADDRESSES:

    You may submit comments (identified by Docket No. IC23-8-000) by either of the following methods:

    eFiling at Commission's Website: https://www.ferc.gov/​docs-filing/​efiling.asp.

    Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, at Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852.

    Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https://www.ferc.gov/​help/​submission-guide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free).

    Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/​docs-filing/​docs-filing.asp.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502-8663.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title: FERC-725T, Mandatory Reliability Standards for the Bulk-Power System: TRE Reliability Standards BAL-001-TRE-2 (Primary Frequency Response in the ERCOT Region).

    OMB Control No.: 1902-0273.

    Type of Request: Three-year extension of the FERC-725T information collection requirements with no changes to the current reporting requirements.

    Abstract: TRE Reliability Standards apply to entities registered as Generator Owners (GOs), Generator Operators (GOPs), and Balancing Authorities (BAs) within the Texas Reliability Entity region.

    The information collection requirements entail the setting or configuration of the Control System software, identification and recording of events, data retention, and submitting frequency measurable events to the compliance enforcement authority (Regional Entity or NERC).

    Submitting frequency measurable events—The BA is required to identify and post information regarding Frequency Measurable Events (FME). Further, the BA must calculate and report to the Compliance Enforcement Authority data related to Primary Frequency Response (PFR) performance of each generating unit/generating facility.

    Data retention—The BA, GO, and GOP shall keep data or evidence to show compliance, as identified below, unless directed by its Compliance Enforcement Authority to retain specific evidence for a longer period of time as part of an investigation. Compliance audits are generally about three years apart.

    • The BA shall retain a list of identified Frequency Measurable Events and shall retain FME information since its last compliance audit.
    • The BA shall retain all monthly PFR performance reports since its last compliance audit.
    • The BA shall retain all annual Interconnection minimum Frequency Response calculations, and related methodology and criteria documents, relating to time periods since its last compliance audit.
    • The BA shall retain all data and calculations relating to the Interconnection's Frequency Response, and all evidence of actions taken to increase the Interconnection's Frequency Response, since its last compliance audit.
    • Each GOP and GO shall retain evidence since its last compliance audit.

    Type of Respondents: NERC Registered entities: Balancing Authorities, Generator Owners, Generator Operators.

    Estimate of Annual Burden: [1] The Commission estimates the annual public reporting burden for the information collection as:

    FERC-725T (Mandatory Reliability Standards for the Bulk-Power System: TRE Reliability Standards)

    Number of respondentsAnnual number of responses per respondentTotal number of responsesAverage burden & cost per response 2Total annual burden hours & total annual costCost per respondent ($)
    (1)(2)(1) * (2) = (3)(4)(3) * (4) = (5)(5) ÷ (1)
    Maintenance and submission of event log data3  11116 hrs.; $891.2016 hrs.; $891.20$891.20
    Evidence Retention4  42014202 hrs.; 111.40840 hrs.; 46,788111.40
    Total421856 hrs.; $47,679.20

    Comments: Comments are invited on: (1) whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.

    Start Signature

    Dated: February 24, 2023.

    Kimberly D. Bose,

    Secretary.

    End Signature End Supplemental Information

    Footnotes

    1.  Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3.

    Back to Citation

    2.  The figures for May 2022 posted by the Bureau of Labor Statistics for the Utilities sector (available at http://www.bls.gov/​oes/​current/​naics2_​22.htm) and updated May 2022 for benefits information (at http://www.bls.gov/​news.release/​ecec.nr0.htm). The hourly estimates for salary plus benefits are:

    —File Clerks (code 43-4071), $34.38.

    —Electrical Engineer (code 17-2071), $77.02.

    The average hourly burden cost for this collection is $55.70 [($34.38 + $77.02)/2 = 55.70].

    3.  BA (balancing authority).

    4.  BA (balancing authority) (1), GO (generator owner) (233), and GOP (generator operator) (186) = 420 functional entities numbers based on NERC Compliance Registry November 4, 2022. The large increase is due to counting each entity function separately instead of considering overlap. Also, there has been an increase in number of renewable energy entities in the Texas region.

    Back to Citation

    [FR Doc. 2023-04314 Filed 3-1-23; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
03/02/2023
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
Notice of information collection and request for comments.
Document Number:
2023-04314
Dates:
Comments on the collection of information are due May 1, 2023.
Pages:
13111-13112 (2 pages)
Docket Numbers:
Docket No. IC23-8-000
PDF File:
2023-04314.pdf