Shutdown Operation of Nuclear Power Plants; Notice of Meeting
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of meeting.
-----------------------------------------------------------------------
SUMMARY: Members of the staff of the Office of Nuclear Reactor
Regulation will meet with commenters (or their representatives) who
responded to Federal Register, 59 FR 52707; October 19, 1994, regarding
the proposed rule ``Shutdown and Low-Power Operations for Nuclear Power
Reactors.'' The staff will discuss comments and receive feedback on the
impact of potential staff responses regarding the proposed rule. The
meeting will be open for interested members of the public, petitioners,
intervenors, or other parties to attend as observers pursuant to ``Open
Meeting Statement of NCR Staff Policy,'' 43 FR 28058, June 28, 1978.
DATES: The meeting will be Friday, April 7, 1995 from 9 a.m.-3 p.m.
ADDRESSES: The meeting will be held at the United States Nuclear
Regulatory Commission Auditorium, Two White Flint North, 11545
Rockville Pike, Rockville, MD 20852.
FOR FURTHER INFORMATION CONTACT: Warren C. Lyon, Senior Reactor Systems
Engineer, Reactor Systems Branch, Office of Nuclear Reactor Regulation,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,
Telephone: 301-415-3892.
SUPPLEMENTARY INFORMATION: The preliminary agenda for the proposed
meeting is:
9:00--Introduction (Purpose of shutdown rule, Applicability/
limitations)
9:15--Summary of Comments to Proposed Rule 59 FR 52707; October 19,
1994
9:30--Staff Decisions (Shutdown rule, Maintenance Rule, Codification of
industry initiatives, Fire, Technical specifications, Outage plans and
controls, Fuel storage pool, Safety related vs. non-safety related,
Single failure, Regulatory analysis, Regulatory guide, Re notice in
Federal Register)
10:15--Items Covered By Rule (General content of rule and philosophy;
Structures, systems, and components; Reliability and redundancy;
Planning; Procedures; Training; Controls; Reactivity; Reactor coolant
system; Subcooled decay heat removal; Containment; Adequate core
cooling; Contingency plan; Implementation)
13:15--Discussion--Issues (Maintenance rule--guidance for shutdown
operation; The meaning of redundancy [Credit for passive heat removal,
gravity feed, & operator response; Electrical power systems];
Containment; Analysis and test needs; Others)
Dated at Rockville, Maryland this 15 day of March 1995.
[[Page 14670]] For the Nuclear Regulatory Commission.
Warren C. Lyon,
Senior Reactor Systems Engineer, Reactor Systems Branch, Office of
Nuclear Reactor Regulation.