E8-5582. Sunshine Act Meeting Notice  

  • Start Preamble March 13, 2008.

    The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 U.S.C. 552b:

    Agency Holding Meeting:

    Federal Energy Regulatory Commission.

    Date and Time:

    March 20, 2008, 10 a.m.

    Place:

    Room 2C, 888 First Street, NE., Washington, DC 20426.

    Status:

    Open.

    Matters to be Considered:

    Agenda. Note—Items listed on the agenda may be deleted without further notice.

    CONTACT PERSON FOR MORE INFORMATION:

    Kimberly D. Bose, Secretary, Telephone (202) 502-8400. For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.

    This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's website at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.

    931th—Meeting

    Regular Meeting

    March 20, 2008, 10 a.m.

    Item No.Docket No.Company
    ADMINISTRATIVE
    A-1AD02-1-000Agency Administrative Matters.
    A-2AD02-7-000Customer Matters, Reliability, Security and Market Operations.
    A-3AD06-3-000Energy Market Update.
    ELECTRIC
    E-1OMITTED
    E-2RM08-3-000Mandatory Reliability Standard for Nuclear Plant Interface Coordination.
    E-3AD07-12-000Reliability Standard Compliance and Enforcement in Regions with Regional Transmission Organizations or Independent System Operators.
    E-4RR06-1-012North American Electric Reliability Council, North American Electric Reliability Corporation.
    RR07-1-002Delegation Agreement Between the North American Electric Reliability Corporation and Texas Regional Entity, a division of ERCOT.
    RR07-2-002Delegation Agreement Between the North American Electric Reliability Corporation and Midwest Reliability Organization.
    RR07-3-002Delegation Agreement Between the North American Electric Reliability Corporation and Northeast Power Coordinating Council, Inc.
    RR07-4-002Delegation Agreement Between the North American Electric Reliability Corporation and ReliabilityFirst Corporation.
    Start Printed Page 14982
    RR07-5-002Delegation Agreement Between the North American Electric Reliability Corporation and SERC Reliability Corporation.
    RR07-6-002Delegation Agreement Between the North American Electric Reliability Corporation and Southwest Power Pool, Inc.
    RR07-7-002Delegation Agreement Between the North American Electric Reliability Corporation and Western Electricity Coordinating Council.
    RR07-8-002Delegation Agreement Between the North American Electric Reliability Corporation and Florida Reliability Coordinating Council.
    RR08-2-000North American Electric Reliability Corporation and Western Electricity Coordinating Council.
    E-5EL02-71-004State of California, ex rel. Bill Lockyer, Attorney General of the State of California v. British Columbia Power Exchange Corporation, Coral Power, LLC, Dynegy Power Marketing, Inc., Enron Power Marketing, Inc., Mirant Americas Energy Marketing, LP, Reliant Energy Services, Inc., Williams Energy Marketing & Trading Company, All Other Public Utility Sellers of Energy and Ancillary Services to the California Energy Resources Scheduling Division of the California Department of Water Resources, and All Other Public Utility Sellers of Energy and Ancillary Services into Markets Operated by the California Power Exchange and California Independent System Operator.
    E-6ER04-157-014Bangor Hydro-Electric Company, Central Maine Power Company, NSTAR Electric & Gas Corporation, New England Power Company, Northeast Utilities Service Company, The United Illuminating Company, Vermont Electric Power Company, Central Vermont Public Service Corp, Green Mountain Power Corporation.
    ER04-714-006Florida Power & Light Company—New England Division.
    E-7ER08-394-000Midwest Independent Transmission System Operator, Inc.
    E-8ER06-1474-002, ER06-1474-004PJM Interconnection, L.L.C.
    E-9EL08-31-000, ER08-396-000Westar Energy, Inc.
    E-10OMITTED
    E-11ER03-583-007, ER03-681-005, ER03-682-006Entergy Services, Inc. and EWO Marketing, L.P., Entergy Services, Inc. and Energy Power, Inc.
    ER03-744-005Entergy Services, Inc. and Entergy Louisiana, Inc.
    E-12ER06-615-011, ER06-615-012, ER07-1257-000California Independent System Operator Corporation.
    E-13ER05-1410-006, EL05-148-006PJM Interconnection, L.L.C.
    E-14ES08-24-000Startrans IO, L.L.C.
    E-15RM01-8-008Revised Public Utility Filing Requirements for Electric Quarterly Reports; Xcel Energy Services, Inc.
    E-16EL08-19-000Public Service Electric and Gas Company.
    E-17EL08-17-000Connecticut Municipal Electric Energy Cooperative and Richard Blumenthal Attorney General for the State of Connecticut v. Milford Power Company, LLC and ISO New England Inc.
    E-18OMITTED
    E-19EL07-95-000Black Oak Energy, LLC v. New York Independent System Operator, Inc.
    E-20OMITTED
    E-21ER04-449-007, ER04-449-008, ER04-449-016New York Independent System Operator, Inc., New York Transmission Owners.
    ER07-543-000Linden VFT, LLC.
    E-22ER06-278-000, ER06-278-001, ER06-278-002, ER06-278-003, ER06-278-004, ER06-278-005, ER06-278-006The Nevada Hydro Company, Inc.
    E-23EL00-95-000, EL00-95-045, EL00-95-187San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services into Markets Operated by the California Independent System Operator and the California Power Exchange.
    EL00-98-000, EL00-98-069, EL00-98-172Investigation of Practices of the California Independent System Operator Corporation and the California Power Exchange.
    E-24ER07-799-002, ER07-799-003, EL07-61-001, EL07-61-002Norwalk Power, LLC.
    E-25OMITTED
    E-26ER07-539-003, ER07-539-004, ER07-540-003, ER07-540-004Niagara Mohawk Power Corporation.
    E-27AD08-2-000Interconnection Queuing Practices.
    E-28RR07-16-001North American Electric Reliability Corporation.
    MISCELLANEOUS
    M-1RM07-1-000Standards of Conduct for Transmission Providers.
    M-2RM07-9-000Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines.
    Start Printed Page 14983
    GAS
    G-1OR06-10-000BP Pipelines (Alaska) Inc., ConocoPhillips Transportation Alaska, Inc., ExxonMobil Pipeline Company, Koch Alaska Pipeline Company, Unocal Pipeline Company.
    G-2OMITTED
    G-3RP08-110-000Columbia Gas Transmission Corporation.
    G-4RP08-127-000Columbia Gas Transmission Corporation.
    G-5RP08-124-000Columbia Gulf Transmission Company.
    G-6OMITTED
    G-7RP00-445-021Alliance Pipeline L.P.
    G-8RP04-42-000, RP04-42-002Southern Natural Gas Company.
    G-9OMITTED
    HYDRO
    H-1DI07-1-001, P-2225-011Public Utility District No. 1 of Pend Oreille County, Washington.
    H-2P-12751-001Finavera Renewables Ocean Energy, Ltd.
    H-3P-2524-015Grand River Dam Authority.
    CERTIFICATES
    C-1CP06-54-000Broadwater Energy LLC
    CP06-55-000, CP06-56-000Broadwater Pipeline LLC.
    C-2CP07-207-000, RP08-190-000Colorado Interstate Gas Company.
    C-3OMITTED
    C-4CP07-457-000Iroquois Gas Transmission System, L.P.
    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature

    A free webcast of this event is available through http://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.

    Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.

    End Preamble

    [FR Doc. E8-5582 Filed 3-19-08; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
03/20/2008
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E8-5582
Pages:
14981-14983 (3 pages)
EOCitation:
of 2008-03-13